18-105020 •
FILEElectrical
City of Federal Way Permit #:18-105020-00-EL
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax(253)835-2609
Project Name: MIRROR LAKE VILLAGE SENIOR HOUSING DUPLEX(R-3)
Project Address: 910-912 SW 310TH CT Parcel Number:072104 9087
Project Description: Service and wiring for new senior housing duplex.
•
Owner Applicant Contractor
MIRROR LAKE VILLAGE LLC RACHEL MASONMERIDIAN CENTER MERIDIAN CENTER ELECTRIC INC(01)
PO BOX 6961 ELECTRIC INC MERIDCE318SG(2/28/19)
BELLEVUE WA 98008 11109 66TH AVE E
PUYALLUP WA 98373 11109 66TH AVE E
PUYALLUP WA 98373
Additional Permit Information
Is this an Online or O.T.C.application? Yes
New Service:201 -400 amps( 1
PERMIT EXPIRES Friday,25 October,2019
Permit Issued on Thursday,October 25,2018
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: _Pei )lS e� tie Date: l I ( 2c` IQ
IN° E
IP& THIS CARD IS TO REMAIN ON-SITE
` �Wa Construction Inspection Record
y INSPECTION REQUESTS:(253)835-3050
PERMIT#: 18 105020 00 Address: 910-912 SW 311TH CT
Project: MIRROR LAKE VILLAGE LLC FEDERAL WAY WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El UFER Ground(4295) 0 Ditch cover(4030) El Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By 1 Date '1 5 By Date/d' /'i By Date
® Pool Bonding(4195) ® Temporary Power(4275) ® Service(4235)
Approved Annoyed Approved
By Date By Date By Date /— ✓/9
El Feeders/Sub-paneb(4045) ® Rough Electrical(4225) El Ceiling Cover(4020)
Approved Approved Approved
By ` Date% ' / By , Date 1 9.-i 9 By Date
® Final-Electrical(4055)
Approved
By Ite-- Date 1 S' 15lik,c,
0 Rough Electrical 0 Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date