Loading...
18-105018 _ Z a Electrical City of Federal Way Permit #:18-105018-00-EL F ' Community Development Dept. L E 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: MIRROR LAKE VILLAGE SENIOR HOUSING DUPLEX(R-2) Project Address: 31015-31017 9TH PL SW Parcel Number:072104 9087 Project Description: Service and wiring for new senior housing duplex. Owner Applicant Contractor MIRROR LAKE VILLAGE LLC RACHEL MASONMERIDIAN CENTER MERIDIAN CENTER ELECTRIC INC(01) PO BOX 6961 ELECTRIC INC MERIDCE318SG(2/28/19) BELLEVUE WA 98008 11109 66TH AVE E PUYALLUP WA 98373 11109 66TH AVE E PUYALLUP WA 98373 Additional Permit Information Is this an Online or O.T.C.application9 Yes New Service:201 -400 amps( 1 PERMIT EXPIRES Friday,25 October,2019 Permit Issued on Thursday,October 25,2018 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: ONLINE THIS CARD IS TO REMAIN ON-SITE 1- " ' Pea Feder��Way Construction Inspection Record INSPECTION REQUESTS:(253)835-3050 PERMIT#: 1810501800 Address: 31015-31017 9TH PL SW Project: MIRROR LAKE VILLAGE LLC FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 UFER Ground(4295) El Ditch cover(4030) Q Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By 06 Date / 2 I, By e Date 0 t /' g By , Date .. _ 'L_ ® Pool Bonding(4195) El Temporary Power(4275) © Service(4235) Approved Approved Approved By Date By Date By',I Date, / 7. 9 El Feeders/Sub-panels`(4045) ® Rough Electrical(4225) ® Ceiling Cover(4020) By 1(f, A Datep /''/ / By /t. Approved Date./'''"/ By Approved Date El Final-Electrical(4055) Approved By E49 Date 4/1420,3 o Rough Electrical El Final ElectricalEl Right of Way Approved Approved Approved By Date By Date By Date .