Loading...
20-101798 Electrical City of Federal Way cod,,,,,a,;ty�,e,�,„e„� FILE Permit #.20-101798-00-EL 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: EAST CAMPUS CORPORATE PARK 1 Project Address: 32001 32ND AVE S Parcel Number: 215465 0010 Project Description: Replaced(6)soffit fixtures • Owner Applicant Contractor STERLING REALTY ORGANIZATION MIKE MORONEYLUMENAL LIGHTING LUMENAL LIGHTING 777 108TH AVE NE SUITE 21706 66TH AVE W LUMENLL864LW(6/16/22) BELLEVUE WA 98052 MOUNTLAKE TERRACE WA 98043 21706 66TH AVE W MOUNTLAKE TERRACE WA 98043 Additional Permit Information Is this an Online or O.T.C.application? Yes a„ U,...$KAI &ga ,Pg- M1,;. Circuits-Commercial 1 PERMIT EXPIRES Wednesday,5 May,2021 Permit Issued on Tuesday,May 5,2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: I"JOLIN Date: E 04 THIS CARD IS TO REMAIN ON-SITE coif OP Federal Way Construction Inspection Record y INSPECTION REQUESTS: (253)835-3050 PERMIT#: 20 101798 00 Address: 32001 32ND AVE S Project: STERLING REALTY ORGANIZATIF FEDERAL WAY WA 98001-9625 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El UFER Ground(4295) � ® Ditch cover(4030) j ® Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date AB,' Date ID Pool Bonding(4195) ® Temporary Power(4275) i Service(4235) Approved ' Approved Approved By Date By Date By Date j® Feeders/Sub-panels(4045) ® Rough Electrical(4225) Ceiling Cover(4020) Approved Approved I Approved By Date •`By Date 1 By Date El Final-Electrical(4055) Approved ByTTT��� � � Date fr.D2V El Rough Electrical El Final Electrical Right of Way Approved Approved Approved By Date By Date By Date