20-101554 4it Mechanical
City of Federal Way Permit #:20-101554-00-ME
Community Development Dept.
33325 8th Ave SFILE
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: ABOY
Project Address: 2104 SW 339TH ST Parcel Number:330620 0195
Project Description: Replace existing gas furnace
Owner Applicant Contractor
FRANCISCO C JR ABOY JAIMIE HOWBRENNAN HEATING&A/C BRENNAN HEATING&A/C LLC
2104 SW 339TH ST 4601 S 134TH PL (GENERAL 01)
FEDERAL WAY WA SEATTLE WA 98168 BRENNHA971R9(12/29/21)
98023 4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Mechanical Work Valuation') 2999 Is this an Online or O.T.C.application? Yes
y .
Furnaces 1
PERMIT EXPIRES Saturday, 10 October,2020
Permit Issued on Monday,April 13,2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: ONLINE
Date:
_ THIS CARD IS TO REMAIN ON-SITEj
Feveral Wa Construction Inspection Record
y INSPECTION REQUESTS:(253)835-3050
PERMIT#: 20 101554 00 Address: 2104 SW 339TH ST
Project: ERLINDA S ABOY FEDERAL WAY WA 98023-7729
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
E Mechanical Rough-in(4165) Gas Piio 4125 `, 3 Final-Mechanical(4065) '
Approved Approved to release test i Approved
By Date By Date a By/ 5 Date 942 4.14,
•
•
Rough Electrical 0 Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date