Loading...
Woodlands NOANOTICE OF LAND USE APPLICATION Project Name: The Woodlands at Redondo Creek Preliminary Plat Project Description: Applicant proposes to subdivide an approximately 21-acre parcel into 68 single-family residential lots. The project includes wetland buffer averaging, open space, street improvements, storm drainage facilities, and utility improvements. Project Contact: John Everett, ESM Consulting Engineers, LLC 33400 8th Avenue S, Suite 205, Federal Way, WA 98003. Project Location: Pacific Hwy South and South 304th Street, Federal Way, Parcel’s 042104-9012 and -9221. Date of Application: October 23, 2019 Date Determined Complete: November 14, 2019 Date of Notice of Application: November 29, 2019 Other Permits and Determinations Included with this Application: Preliminary Plat Application File # 19-105072- 00-SU; State Environmental Policy Act Threshold Determination File # 19-105073-00-SE; Forest Practices Application File # 19-105083-00-AD, Use Process III Application File # 19-105074-00-UP, Street Modification Request File # 19- 101684-00-SM, and Transportation Concurrency File # 19-104256-00-CN. Environmental Documents: Critical Areas Report by Sewall Wetland Consulting, Inc, (October 11, 2019), Geotechnical Engineering Study by Earth Solutions NW, LLC, (October 3, 2019), Arsenic and Lead Soils Assessment by ECI - Environmental Services (July 17, 2019), Tree Conservation Plan by Washington Forestry Consultants, Inc. (October 16, 2019), Cultural Resources Report by Columbia Geotechnical Associates, Inc. (June 20, 2019), Preliminary Technical Information Report and Downstream Analysis by ESM Consulting Engineers, LLC (October 23, 2019), and Traffic Impact Analysis by TraffEx (September 28, 2019). Development Regulations Used for Project Mitigation: Federal Way Revised Code (FWRC) Title 14, “Environmental Policy”; Title 16, “Surface Water Management”; Title 18, “Subdivisions”; and Title 19, “Zoning and Development Code.” Consistency with Applicable Plans and Regulations: The project will be reviewed for consistency with all applicable policies and regulations, including but not limited to: The Federal Way Comprehensive Plan; King County Surface Water Design Manual; Public Works Development Standards; Lakehaven Water and Sewer System Design and Construction Standards; South King Fire and Rescue Administrative Policies; and Federal Way Public Schools Safe Access Policies. Public Comment: Any person may submit written comments regarding the application to the Hearing Examiner by delivering these comments to the Community Development Department prior to the public hearing date, or directly to the Hearing Examiner at the public hearing. Any person may provide verbal comments during the public hearing. A Notice of Public Hearing will be issued approximately 15 days prior to the hearing date. Availability of File and Environmental Documents: The official project file and referenced environmental documents are available for public review during normal business hours at the Community Development Department, 33325 8th Avenue South, 2nd Floor, Federal Way, WA 98003. Staff Contact: Senior Planner Becky Chapin, 253-835-2641, or becky.chapin@cityoffederalway.com Printed in the Federal Way Mirror November 29, 2019.