Loading...
20-101703 y.. I Electrical City or Federal way Permit #:20-101703-00-EL Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: HAWKINS Project Address: 2111 SW 349TH PL Parcel Number: 176110 0530 Project Description: Replace thermostat for gas furnace Owner Applicant Contractor LAVORIS HAWKINS A A A HEATING&AIR CONDITIONING A A A HEATING/REFRIGERATION INC 2111 SW 349TH PL 22641 83RD AVE S (ELECTRICAL) FEDERAL WAY WA KENT WA 98032 AAAHEHR975M2(8/11/21) 98023-3071 22641 83RD AVE S KENT WA 98032 Additional Permit Information Is this an Online or O.T.C.application9 Yes � 4"5;JV R Thermostat 1 PERMIT EXPIRES Wednesday,28 April,2021 Permit Issued on Tuesday,April 28,2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ONLINE Date: THIS CARD IS TO REMAIN ON-SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 20 101703 00 Address: 2111 SW 349TH PL Project: VIKI A HAWKINS FEDERAL WAY WA 98023-3071 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ® UFER Ground(4295) ''•El Ditch cover(4030) 0 Slab/Concrete Floor(4255) Approved i Approved Approved to place concrete By Date •1 By Date By Date ID Pool Bonding(4195) El Temporary Power(4275) 0 Service(4235) Approved Approved Approved By Date By Date ' By Date ® Feeders/Sub-panels(4045) ® Rough Electrical(4225) 1 9❑ Ceiling Cover(4020) Approved . Approved Approved By Date �1 By Date �`By Date El Final-Electrical(4055) Approved By Pie_ Date lagoix, • CI Rough Electrical 0 Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date