Loading...
20-101387 „ s s Mechanical City y FeDevelopment deral Way FILE • ,, ;h Federal t Permit #•20-101387-00-ME C , 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: CARLSSON/TONNA Project Address: 30457 3RD PL S Parcel Number:232960 0120 Project Description: Run new gas line. Owner Applicant Contractor ADAM CARLSSON QUTANA WOODSBEACON PLUMBING& BEACON PLUMBING&MECHANICAL 30457 3RD PL S MECHANICAL(ELECTRICAL) (ELECTRICAL) FEDERAL WAY WA 98003 8611 S 8611 S 192ND ST AVE BEACOPM856P6(10/26/21) KENT WA 98031 8611 192ND ST KENT WA 98031 Additional Permit Information Mechanical Work Valuation? 1000 Is this an Online or O.T.C.application? Yes Ranges 1 PERMIT EXPIRES Wednesday,23 September,2020 Permit Issued on Friday,March 27,2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use wil,: c nc ' h , rules and regulations of the State of W- gt: • ' - . he i I Way. Owner or agent: Date: 4 . , • THIS CARD IS TO REMAIN ON-SITE Fere Way Construction Inspection Record INSPECTION REQUESTS:(253)835-3050 PERMIT#: 20 101387 00 Address: 30457 3RD PL S Project: GRACE TONNA FEDERAL WAY WA 98003-4006 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ® Mechanical Rough-in(4165) ® Gas Piping(4125) ® Final-Mechanical(4065) Approved Approved to release test Approved .By Date ; By 1 ..U4 Date 7bf 93a By wS Date7 "(fes# 0 3• s ,-s 1 0 Rough Electrical C Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date