Exhibit I Design DecisionCITY OF Department of Community Development Federal Way33325 8'^Avenue South Federal Way,WA 98003-6325 253-835-2607 www.cityoffederalway.com Jim Ferrell,Mayor Mr.Alan Keimig May 28,2020 The Keimig Associates 307 D Street SE Auburn,WA 98002 ackeimig(a,msn.com Re: File#19-102839-00-UP;DESIGN DECISION Christ's Church Ministry Center,941 South Dash Point Road,Federal Way Dear Mr.Keimig. This design decision is issued for the above-referenced project pursuant to Federal Way Revised Code(FWRC) 19.65, Project Approval,"and FWRC 19.115,"Community Design Guidelines."The proposed action is for construction of a new two-story(32,478 square foot)Church Ministry Center building and associated parking lot improvements, landscaping,and storm drainage improvements.The subject property is approximately 3.7 acres and is zoned Single-Family Residential(RS)9.6.Churches are a permitted use in the RS zoning district,subject to FWRC 19.200.050,and subject to a Hearing Examiner Process IV public hearing and decision. DESIGN APPROVAL ISSUANCE AND EFFECT The Community Design Guidelines components of the project are hereby conditionally approved pursuant to decision criteria set forth in FWRC 19.115.This decision is also based,in part,on the conclusions drawn from the Statement of Facts issued by the Planning Division(Exhibit A)and Preliminary Site Plan Sheet A1.1;Preliminary Building Elevations Pages A3.1 and A3.2(revised February 1,2020,by the Keimig Associates);and Preliminary Landscape Plans Pages L1 and L2(revised February 10,2020,by BDG,Exhibit B). This decision does not take effect unless and until the Hearing Examiner issues Process IV decision on the proposal,and it does not authorize the applicant to conduct any development activities on the site. CONDITION OF APPROVAL 1. Prior to approval of construction plans,the landscape plan shall be revised to upgrade the perimeter landscaping along the southerly property line adjacent to the existing single-family residential zone to a Type I landscape buffer.This entails adding approximately 8—10 more trees than currently shown on the preliminary landscape plan.For a Type I landscape buffer,trees shall be plated at approximately 10—15 feet on center. STATE ENVIRONMENTAL POLICY ACT THRESHOLD DETERMINATION Pursuant to Washington Administrative Code 197-11-355,the city's Responsible Official issued an Optional Determination of Nonsignificance(DNS)and Notice of Application on June 25,2019.A final DNS was issued by the city on September 13,2019.No SEPA appeals were filed.The Department of Community Development issued a SEPA Addendum for the proposed action on May 27,2020. PAGE Mr.Alan Keimig Page 2 of 2 May 28,2020 PROCEDURAL INFORMATION Building Permit&Engineering Requirements This Administrative Design Decision does not constitute a building permit,or authorize clearing/grading activities. The applicant shall obtain Process IV Hearing Examiner Review approval,building permits,and engineering review for construction activities from the Community Development and Public Works Departments. Requestsfor Change of Valuation Any affected property owners may request a change in valuation for property tax purposes,not withstanding any program of revaluation. Approval Duration Unless modified or appealed,this site plan approval is valid for five years from the date of issuance of the decision. Time extensions to the decision may be requested prior to the lapse of approval following the provisions listed in FWRC 19.15.110. Appealr The effective date of issuance is three calendar days following the date of this letter,or May 31,2020.Pursuant to FWRC 19.65.120,this design decision may be appealed by any person who submitted written comments,or any person who has specifically requested a copy of the decision.Any appeal must be in the form of a letter delivered to the Community Development Department with the established fee and within 14 days after the effective date of issuance of this decision,or June 15,2020.The appeal letter must contain a clear reference to the matter being appealed and a statement of the factual findings and conclusion of the director disputed by the person filing the appeal.Any appeal of this decision will be heard by the Federal Way Hearing Examiner concurrently with the Process IV hearing associated with the application. CLOSING This land use decision does not waive compliance with future City of Federal Way codes,policies,and standards relating to this development.Information used in preparing the design decision such as drawings,specifications, and details are available upon request to the city staff in the Department of Community Development(33325 8'h Avenue South,Federal Way,WA 98003).Copies of specific information may also be obtained by submitting a records request to the City Clerk at the above-referenced address or via the city website at http://www.cityoffederalway.com/page/search-public-records.If you have any questions regarding this decision, please contact Senior Planner Jim Harris at jim.harris@cityoffederalway.com. Sincerely, for Brian Davis Director of Community Development enc Exhibit A:Statement of Facts Exhibit B:Preliminary Site Plan Sheet A-1.1;Preliminary Building Elevations Pages A3.1 and A3.2(revised February 18,2020,by the Keimig Associates);and Preliminary Landscape Plans Pages Ll and L2,by BDG,revised February 10,2020.(Plans are not sent to parties on the copy list Plans are available for public review by request to jim.harrisna,dtyoffederalway.com, or by written request to the Community Development Department.) c Jim Harris,Senior Planner Ann Dower,Senior Engineering Plans Reviewer Neil Eugenio,neiLe@comcast.net pp T 19-102839-UP PAGE 2 F 7 CITY OF Federal Way EXHIBIT A STATEMENT OF FACTS Federal Way Revised Code Chapter 19.115, "Community Design Guidelines" Christ's Church Ministry Center Expansion, File 19-102839-UP The Planning Division hereby presents the following statement of facts to the Director of Community Development pursuant to content requirements of the Community Design Guidelines decision as set forth in Federal Way Revised Code(FWRC) 19.70.010 and 19.65.100(4). This church expansion proposal is subject to FWRC 19.115.030,which states;"Subject applications for remodeling or expansion of existing developments shall meet only those provisions of this chapter that are determined by the director to be reasonably related and applicable to the area of expansion or remodeling." 1. Proposal—The applicant,The Keimig Associates on Behalf of Christ's Church,has proposed construction of a two-story,32,478 square foot church ministry building.The subject property is presently developed with two church buildings totaling approximately 25,900 square feet,plus three other small buildings totaling approximately 10,700 square feet.This proposal includes construction of a new 32,478 square foot ministry center building;upgrading and paving the existing gravel parking area;and removing and stormwater improvements.The proposal also includes removing and demolishing three existing buildings on-site which total approximately 10,700 square feet.The subject property is 3.7 acres.The church shares access to Dash Point Road and shares off-site parking with the adjacent Sacajawea Middle School. 2. Requested Decision—The applicant submitted a complete Process IV Hearing Examiner Master Land Use Application(MLUA)on June 25,2019.Prior to the Hearing Examiner's Process IV decision,the Director of Community Development shall issue a design decision pursuant to FWRC 19.65.100(2)(b). 3. Crime Prevention Through Environmental Design(CPTED)—The applicant submitted a CPTED checklist as a component of the Process IV MLUA.Staff finds the applicant has met the intent of CPTED and provides measures that include,but are not limited to:use of security cameras;site and building layout;landscaping;lighting;and entrance visibility. Statement of Facts—Design Decision Page 1 of 5 Christ's Church Ministry Center Expansion File No 19-102839-UP/Doc 1D.80490 I T PQ.E., OF '? 4. Site Design—Pursuant to FWRC 19.115.050,project designers shall strive for overall design continuity by using similar elements throughout the project and addressing the following items:(a) pedestrian areas,amenities,and circulation;(b)surface parking lot;(c)garbage and recycling receptacles,placement,and screening;and(d)lighting. Staff finds the applicant has met the intent of the chapter's site design standards and analysis of each item is provided below: a. Pedestrian Areas,Amenities, and Circulation—The proposed ministry building will abut an existing pedestrian plaza area located between the proposed new ministry building and the existing church building.This plaza will be adjacent to and accessible to both buildings.The plaza has landscaping and an approximately 1,000 square foot outdoor gathering area at the northeast corner of the proposed building. The proposed ministry building is not adjacent to the public right-of-way.However,the existing church building is adjacent to the right-of-way and there is an existing pedestrian connection to the public sidewalk. A pedestrian walkway is proposed between the new ministry building and the improved parking lot. b. Surface Parking Lot—Access to the parking areas is existing and will only be modified and upgraded with paving and drainage.Vehicular loop access is provided inside the parking area. Internal lot landscaping will be provided within landscape islands at a ratio of a minimum 22 square feet per stall. c. Garbage and Recycling Receptacles—The garbage and recycling enclosure is proposed to be screened with an enclosure architecturally consistent with the building,and be screened by trees, shrubs,and groundcover abutting the enclosure. Final landscape plan review and enclosure review will occur with the building permit application. d. Lighting—The CPTED checklist submitted with the application identifies an exterior lighting plan will be prepared for the site. 5. Building Design—Both the south and east façades are longer than 60 feet as proposed and will be visible from a single-family residential zone,and therefore,these two facades are subject to facade treatment and articulation requirements pursuant to FWRC 19.115.060(2).Staff finds,as conditioned, the applicant has met the intent of the chapter's building design standards and analysis of each item as provided below: a. Façade Modulation and Screening Options—The applicant has utilized all four modulation and screening options on various elevations.FWRC 19.115.060(2)allows flexibility when applying dimensional standards of the façade modulation and screening options if more than two of the options are incorporated in the project design. Staff provides analysis for each elevation as follows: i. North Elevation—Due to the proposed ministry building being located behind the existing buildings,only the top portion of this façade may be visible from a public right-of-way; therefore,this guideline does not apply to the north facade. ii. West Elevation—Due to the proposed ministry building being located behind existing buildings,only the top portion of this façade may be visible from a public right-of-way; therefore,this guideline does not apply to the north façade. Statement of Facts—Design Decision Page 2 of 5 Christ's Church Ministry Center Expansion File No 19-102839-UP/Doc.1.D.80490 PAGE q GP7 iii. South Elevation—The south elevation is approximately 90 feet in length and is visible from a single-family residential zone.Keimig Associates provided a May 13,2020,email memo received by the city on May 19,2020)describing the proposed facade modulation and screening for the south facades,and summarized as follows:(I)vertical modulation,at a distance of approximately 78 feet,is provided on two surfaces(the vertical planes are separated by a metal shed roof covering a portion of the elevation);(2)Type III foundation landscaping in a strip less than eight feet wide is proposed along approximately half the south facade;and(3) an enclosed canopy is proposed along approximately 15 percent of the south facade. iv. East Elevation—The east elevation is approximately 170 feet in length and is visible from a single-family residential zone.Keimig Associates provided a May 13,2020,email memo received by the city on May 19,2020)describing the proposed facade modulation and screening for the east facade and summarized as follows:(1)horizontal modulation in several steps is proposed to give visible separation,and also includes a sloping roofline horizontal modulation;(2)foundation landscaping approximately five feet in width is proposed along approximately 40 percent of the east facade;(3)a small metal canopy covers an office entrance;and(4)a generous approximately 660 square foot pedestrian plaza with landscaping and benches is located at the north corner of the east facade. City staff finds that several elements of the facade modulation and screening standards have been proposed along the south and east facades;however,the proposed vertical modulation dimensions;proposed facade landscape width and type;and proposed canopy percentage;all do not meet the recommended dimensional and percentage guidelines outlined in FWRC 19.115.060(2).Therefore,city staff finds a condition of approval is warranted due to these facades not fully meeting the dimensional guidelines,and due to the adjacent single-family zone and uses. This condition requires upgrading the perimeter landscaping along the southerly property line adjacent to the existing single-family residential zone to a Type I landscape buffer.This will entail adding approximately 8— 10 more trees than currently shown on the preliminary landscape plan.For a Type I landscape buffer,trees shall be plated at approximately 10— 15 feet on center. b. Building Articulation and Scale—This section(FWRC 19.115.060[3])pertaining to building articulation and scale has been met as discussed in the following narrative by the applicant in a May 20,2020,email: i. East Elevation—There are multiple window openings at the office area,and windows placed higher at the gymnasium for impact aversion.The windows are clear glazing with two-inch clear anodized aluminum frames. The larger wall to the south end at the gymnasium will be softened with foundation landscaping to obscure the lower portion of the wall.Architectural features,like an oversized metal coping at the top of the parapet wall,metal canopies,and permanent horizontal and vertical reveals,break up the larger portions of wall areas.At the north end of the east elevation,a vertical portion of the wall is accentuated with a CMU veneer with a sloping parapet roofline.The CMU will be of a varied color from the body of the building with horizontal CMU banding.At the north end of the east elevation lies an open plaza bordered on two sides with foundation landscaping.The plaza is approximately 660 square feet. ii. South Elevation—Although there are minimal openings on the south elevation,the window frames align with horizontal and vertical reveals,using the same techniques as the other elevations.Metal roofing materials at two different vertical modulations give accent to color and texture in comparison to the adjacent wall surfaces.Foundation landscaping adorns the entire length of the south elevation,softening the wall's height. Statement of Facts—Design Decision Page 3 of 5 Christ's Church Ministry Center Expansion File No 19-102839-UP/Doc.1.D.80490 EXH F T L.. 6. Building and Pedestrian Orientation—The proposed new building is not adjacent to or visible from the right-of-way.The main building entrance is oriented to the existing pedestrian plaza,and a secondary entrance is highlighted and identified by a canopy.All facades incorporate glazing as appropriate for the proposed building use.Staff finds the applicant has met the intent of building and pedestrian orientation pursuant to FWRC 19.115.070. 7. Institutional Uses—Pursuant to FWRC 19.115.100,institutional uses are required to implement specific zoning district guidelines and specific institutional use guidelines. Institutional uses are subject to guidelines in FWRC 19.115.100(3)-(5)regarding 120-foot maximum façade length,roofline design,and organization and shape of building structure elements. City staff finds the proposed building meets these guidelines in FWRC 19.115.100(3)-(5)by incorporating major structural modulation for the east façade at approximately 70 feet and 78 feet,which meets the intent of the section.The east façade roofline has five different stepped horizontal planes,architectural parapets;small cornices;canopies and fascia's;and two small pitched roof sections.Overall the varied rooflines minimize uninterrupted horizontal planes and in addition with other design elements results in architectural appeal. In addition,institutional uses are subject to applicable guidelines in FWRC 19.115.090(lxa),(b), e),(1),(h),and(i). Staff finds the applicant has met the intent of specific district guidelines and provides italicized staff analysis following each provision: a. Surface parking may be located behind the building,to the side(s)of the building,or adjacent to the right-of-way;provided,however,that parking located adjacent to the right-of-way maximizes pedestrian access and circulation pursuant to FWRC 19.115.050(4). Staff Response: The existing and proposed parking is mainly located behind or beside existing and proposed church buildings.A portion of existing parking area is located adjacent to the public right-of-way;however, this parking area is not being modified as part of this proposal and is not required to be modified to meet design guidelines. This guideline is met. b. Entrance facades shall front on,face,or be clearly recognizable from the right-of-way;and shall incorporate windows and other methods of articulation. Staff Response: This guideline is not applicable as the proposed building is located behind two existing church buildings on site that will remain. e. Ground-level mirrored or reflective glass is not allowed adjacent to a public right-of-way or pedestrian area. Staff Response: The applicant does not propose ground-level mirrored or reflective glass, and the building is not proposed adjacent to the right-of-way. f. If utilized,chain-link fences visible from public rights-of-way or adjacent properties,and not screened by Type I landscaping as defined by Chapter 19.125 FWRC,shall utilize vinyl- coated mesh,powder-coated poles,dark color(s),and architectural element(s),such as pole caps and/or decorative grid pattern. Statement of Facts—Design Decision Page 4 of 5 Christ's Church Ministry Center Expansion File No 19-102839-UP/Doc.I.D.804 ETA. PAGE. 6 Staff Response: The applicant does not propose chain-linkfencing. h. Parking lots should be broken up into rows containing no more than 10 adjacent stalls, separated by planting areas. Staff Response:As shown on the site plan,parking stall rows contain 10 or fewer adjacent stalls between planting areas. i. Pedestrian walkways(minimum six feet wide)shall be provided between the interior of the project and the public sidewalk. Staff Response: There is an existing paved walkway existingfrom the main church building entrance to the public sidewalk along Dash Point Road. The proposed ministry building will be located behind two existing buildings and not directly adjacent to the public right of-way.Pedestrian walkways are existing or will be constructed between all the church buildings at the site. This guideline is met. 8. Decisional Criteria—The proposal is consistent with applicable Community Design Guideline decision criteria set forth in FWRC 19.65.100(2Xb).As shown in analysis above,the proposal is consistent with site design standards set forth for institutional uses in FWRC 19.115.100,and meets all applicable design guidelines for church use in a single-family residential zone in FWRC 19.115. Final construction drawings will be reviewed for compliance with specific regulations,conditions of approval,and other applicable city requirements considered in the upcoming Process IV Hearing Examiner decision.These findings shall not waive compliance with future City of Federal Way codes, policies,and standards relating to this development. Prepared by: Senior Planner Jim Harris Date:May 26,2020 Statement of Facts—Design Decision Page 5 of 5 Christ's Church Ministry Center Expansion F"t U lac.I.D- 80490 PAGEL7 F...2_._.