Loading...
Greenline Warehouse B Traffic ConcurrencyCITY OF Federal Way PUBLIC WORKS DEPARTMENT 33325 81h Avenue South Federal Way WA 98003-6325 253-835-27ft Fax 253-835-2709 www.citvoffederalway.com 2017 TRAFFIC CONCURRENCY REVIEW APPLICATION APPLICATION NO(s) Project Name Greenline Warehouse To Date Property Address/Location 3120 S 344th St, Federal Way, WA 98003 Parcel Number(s) 614260-0200 Project Description Development of a +/- 217,300 SF Warehouse/Distribution building on approximately 16.9 acres of CP-01 zone property located south of and adjacent to proposed Warehouse "A" development site. PROPERTY OWNER APPLICANT (If different than Owner) Name: Phone/Fax: Address: City/State/Zip: Email: Cell: Signature: Type of Development permit to be applied for: Q Commercial ❑ Multifamily (MF) ❑ Subdivision ❑ Short Subdivision ❑ Single Family (SF) ❑ None (Feasibility only) ❑ Other Approval for City to perform Concurrency analysis: ❑� Yes ❑ No If NO: Applicant's Traffic Engineer must perform Concurrency analysis consistent with City procedures; however, the application fee remains the same. LADEPT\PW\TRA\Concurrency\CN TemplateTiinal Template\FW Concurency Application Rev. Dec2016.doc Required Information — Application is incomplete and will be returned if not filled out. Gross Square Feet (Commercial) Number of Dwelling Units Existing Proposed Existing Proposed Number of Employees Existing Proposed Parcel size (acres or square footage) Existing 38.A ACRES Proposed 16.9 ACRES Has the property previously been reviewed for concurrency? Yes No X If yes, date of original application Is this an amendment to an existing Concurrency Certificate? Will the project be phased? Development Build -Out Year 2019 Concurrency Permit No: Yes No Q Note: Commercial subdivisions and other projects constructed in phases shall be evaluated for concurrency as each phase is submitted for applicable development permits. Once the concurrency test result has been determined, any changes to the development project require additional review will be billed on an hourly basis. Estimated Number of New Trip Generated by Project per Pre -application Summary: If the applicant's engineer has prepared a trip generation analysis, please provide the following. If not, staff will calculate the trip generation based on the above information. Existing PM Peak Hour Trips (if applicable) Proposed PM Peak Hour Trips Net New PM Peak Hour Trips CONCURRENCY TEST EXPIRATION (FWRC 19.90) A Concurrency Reserve Certificate (CRC) is valid until the underlying development permit expires, is withdrawn or cancelled, whichever occurs first. In that case, a new concurrency application would be required. A Concurrency Reserve Certificate is valid only for the specific development approval consistent with the development parameters and City file number within the CRC issued. A Concurrency Reserve Certificate (CRC) runs with the land, and cannot be transferred to a different parcel. I have read the above information regarding expiration deadlines. I further understand that issuance of a concurrency certificate is not a guarantee that the City will issue a development permit or building permit. Property Owner/Agent Signature Date SUBMITTAL REQUIREMENTS — STAFF USE ONLY I Permit Submittal: The following items are required for all applications: ❑ Completed and signed Concurrency Application ❑ Concurrency Application Fee paid (See Below) Net New PM Peak Hour Trip Less than 10 11 - 50 51 - 500 Greater than 500+ 2017 Application Fee $1,620.00 $4,650.00 $8,505.00 $13,635.00 L:\DEPT\PW\TRA\Concutrency\CN Template\Final Template\FW Concumncy Application Rev. Dec20l6.dm