Public Hearing -Process IV Land Use Application
Christ’s Church Ministry Building Expansion
Public Hearing
Process IV Land Use Application
Christ’s Church Ministry Building Expansion
City Staff Presentation
File No. 19-102839-UP
October 13, 2020
Hearing Examiner
Application & Proposal
∗Site is located at 941 Dash Point Road South.
∗Use Process IV application for a proposed new Church Ministry building
expansion in RS 9.6 zoning district.
∗3.7 acre site.
∗Proposed 33,000 sq.ft. building expansion, improvements proposed to:
parking lot; stormwater system; site access; and site landscaping.
∗Site is presently developed with approx. 37,000 sq.ft. of buildings, and 11,000
sq.ft. buildings to be removed to accommodate new Ministry Building.
∗FWRC 19.15.100 allows five year approval duration for Process IV decision.
∗Use Process IV application requires Hearing Examiner review and approval.
Vicinity
Map
Site Plan
Elevation Plan A 3.1
Elevation Plan 3.2
∗SEPA Determination of Nonsignificance (DNS) issued
by City.
∗Optional DNS June 28, 2019.
∗Final DNS September 13, 2019
∗DNS Addendum for stormwater design May 27, 2020.
∗No comments or appeals of SEPA Determination.
SEPA Review and Determination
∗Special Regulations & Notes:
∗FWRC 19.200.050 Church Use,
∗FWRC Development regulations
∗Use Process IV decision criteria:
∗FWRC 19.70.150(3)
Review Criteria
∗Meets use, height, setbacks, bulk, and parking regulations on
use zone chart 19.200.050
∗Must meet stormwater regulations.
∗Transportation concurrency met. Condition to add turn lane
into site per Traffic Engineer.
Zoning & Development Code Review
FWRC 19.200.050 Church Use
∗Consistent with Comprehensive Plan, permitted use in RS zone, compatible with other uses in zone and vicinity.
∗Consistent with FWRC zoning code and development regulations, will comply with all codes.
∗Consistent with health, safety, and welfare by meeting code requirements.
∗Existing streets and utilities are adequate for proposed expansion.
∗Public Works has reviewed and approved access location with condition as recommended.
∗Transportation Concurrency met, TIF per FWRC 19.91, no traffic safety impacts created as recommended.
Process IV Decision Criteria
∗Staff recommends approval of the Process IV
application, subject to the following conditions:
∗Obtain engineering plan approval prior to site construction.
∗Obtain DOE approval of stormwater injection well.
∗Design and construct left turn lane at site driveway.
∗Upgrade nonconforming landscaping along
frontage and in existing parking lot.
∗Comply with Director’s Design Decision dated May
31, 2020.
Staff Recommendation Summary
End of Presentation
∗Call 253-835-2655
∗Contact Planning@cityoffederalway.com
∗Exhibits and Staff Report are available at:
∗https://www.cityoffederalway.com/node/1962
Contact Info
Public Hearing -Process IV Land Use Application
Christ’s Church Ministry Building Expansion
C-300
C-301