Loading...
19-104208-Floodplain Application-06-26-2020-V1Bulletin #082 – May 17, 2019 Page 1 of 3 k:\Handouts\Floodplain Development Permit Property Address/Location Parcel Number Property Size Zoning Designation Comprehensive Plan Designation Shoreline Designation FIRM Designation SUBMITTAL DOCUMENT: Provide six (6) copies drawn to scale no less than 1:50. Req. Sub.   Site Plan 1. Show the location of proposed and existing structures and any storage of fill or materials on the parcel in relation to the existing topography of the parcel and the mean sea level. 2. Show the location of all water bodies, waterways, wetlands, and drainage facilities within 300 feet of the site. 3. Show the location of special flood hazard area (100-year floodplain), as well as any frequently flooded areas identified by the City’s Critical Areas Ordinance. 4. Proposed surface water drainage system. 5. Proposed post-development grading topography at one-foot intervals. 6. Description of the extent a watercourse will be altered as a result of the proposed action.   Cross Section 1. Elevation of project in relation to the mean sea level (include current elevation certificate, FEMA form 81-31 found at https://www.fema.gov/media-library/assets/documents/160#) 2. Elevation of mean sea level to any structure that has been flood-proofed and certification by a registered professional engineer or architect that the flood-proofing method meets FWRC 19.142.140(2); 3. Elevation of existing or proposed structure floor levels (including basement) in relation to the mean sea level, including the lowest and highest finished grade adjacent the proposed structure   Certification by registered professional engineer or architect that the floodproofing methods for any APPLICANT INFORMATION Owner NAME PHONE NUMBER MAILING ADDRESS E-MAIL CITY STATE ZIP FAX Agent NAME PHONE NUMBER MAILING ADDRESS E-MAIL CITY STATE ZIP FILE NUMBER ____ ____ - ____ ____ ____ ____ ____ ____ Date FLOODPLAIN DEVELOPMENT PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT 33325 8th Avenue South Federal Way, WA 9800 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com 1 9 1 0 4 2 0 8 5/14/2020 Grealish, Amy 917-972-4992 212 SW 292nd St amyg3@comcast.net Federal Way WA 98023 Bill Rehe 253-389-0712 8305 Dogwood Ln. NW Gig Harbor WA 98332 bill@northforkenvironmental.com 212 SW 292nd St 119600-0121 15613 RS9.6 Urban growth area: u Shoreline Residential Zone A (53033C1250F) Bulletin #082 – May 17, 2019 Page 2 of 3 k:\Handouts\Floodplain Development Permit nonresidential structure meet floodproofing criteria in FWRC 15.15.140(2) PROJECT INFORMATION Activity Types  New Construction  Addition  Alteration  Relocation  Demolition  Replacement  Repair  Storage Categories  Residential Structure  Non-Residential Structure  Manufactured Home  Bridge / Culvert  Levee  Stream Bank / Channel  Irrigation Structure  Habitat Enhancement  Water / Sewer  Subdivision (new or expansion)  Other: _________________ Components  Excavation  Fill  Channelization  Grading  Clearing  Mining and Dredging  Drilling  Debris Removal  Wetland Impact  Other: _________________ Project description and additional project information (attach additional sheets if necessary) If the value of an addition or alteration to a structure within an area designated as a “special flood hazard” equals or exceeds 50% of the value of the structure before the addition or alteration, the entire structure must be treated as a substantially improved structure. The following information must be provided if the proposed improvement is within a “special flood hazard” zone identified by FEMA. Cost of Improvement (a): $ Market Value of the Building (b): $ Percent of Value Change (a/b): % Disclaimer: Substantial Improvement Evaluation must be supported by project cost documentation and approved market evaluation. Attach supporting documentation. Relocation or Replacement A relocated structure or a structure being replaced must be treated as new construction. Quantity of fill placement in floodplain (Detailed Grade and Fill Plan Required) _________ (cubic yards) List all applicable local, state and federal permits that have been applied for, and indicate whether they were issued, waived, denied or pending. List elevation of the structure at the lowest floor of the structure (including basement) at the project’s site to the Mean Ordinary High Water Mark_________________________. The Grealish's are proposing to replace their existing concrete bulkhead 1 foot landward of its present location. The landward location will move the structure to or slightly above ordinary high water. This location will lessen the impact to the upper intertidal zone and reduce impacts to the floodplain while protecting the Grealish and neighboring properties. Please see the JARPA for more information. (lawn only) (bulkhead) (previous fill) City of Federal Way SEPA, shoreline exemption, floodplain permit and building permit Washington Department of Fish and Wildlife HPA 6/20/2020