20-101125 J
Mechanical
City of Federal Way F I L
Permit #:20-101125-00-ME
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax (253)835-2609
Project Name: FILBERT
Project Address: 30918 37TH PL SW Parcel Number:058755 0550
Project Description: Remove/replace gas water heater
Owner Applicant Contractor
KATHLEEN FILBERT JASON HANLEYBROWNFAST WATER FAST WATER HEATER CO(GENERAL)
30918 37TH PL SW HEATER COMPANY FASTWWH948BC(1/4/22)
FEDERAL WAY WA 11715 NORTH CREEK PKWY S SUITE C-106
98023-2108 BOTHELL WA 98011 1715 NORTH CREEK PKWY S SUITE C-10.
BOTHELL WA 98011
Additional Permit Information •
Mechanical Work Valuation" 2235 Is this an Online or O.T.C.application" Yes
Hot Water Tanks 1
PERMIT EXPIRES Tuesday,8 September,2020
Permit Issued on Thursday,March 12,2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
in an
a t ederal Way.
Owne org
r agent: � Date:
THIS CARD IS TO REMAIN ON-SITE
Federal Way Construction Inspection Record
y INSPECTION REQUESTS:(253)835-3050
PERMIT#: 20 101125 00 Address: 30918 37TH PL SW
Project: BRIAN K FILBERT FEDERAL WAY WA 98023-2194
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
® Mechanical Rough-in(4165) ® Gas Piping(4125) ® Final-Mechanical(4065)
Approved i Approved to release test Approved
.By Date By Date ABy ( Date 8 S4an
0 Rough Electrical 0 Final Electrical El Right of Way
Approved Approved Approved
By Date By Date By Date