Loading...
20-104021_05 Certificate of Water Availability_10-01-2020-V17622400015 wtr swr.docx (Form Update 3/13/20) Page 1 of 4 WATER CERTIFICATE OF AVAILABILITY Lakehaven Water & Sewer District – Development Engineering Section 31623 – 1st Ave S  PO Box 4249  Federal Way, WA 98063-4249 Email: DE@Lakehaven.org  Telephone: 253-945-1581 or 253-945-1580 This certificate is intended to provide the applicant, land use agencies &/or public health departments with information necessary to evaluate development proposals. Lakehaven Water & Sewer District, at its sole discretion, reserves the right to delay, or deny, water service based upon capacity &/or supply limitations in Lakehaven’s or Other Purveyor’s system facilities. Proposed Land Use: Building Permit-SFR () Building Permit-MFR () Building Permit-Other Subdivision () Short Subdivision () Binding Site Plan Boundary Line Adjustment Other (specify/describe) Land Use – Process III Tax Parcel Number(s): 7622400015 Site Address: 17XX S 320th St LWSD GIS Grid: K-09 Ex. Bldg. Area to Remain: UNKNOWN sf New Bldg. Area Proposed: UNKNOWN sf WATER SYSTEM INFORMATION 1. Water service can be provided by service connections to an existing 12” diameter water mains that are on the site. 2. If additional/new fire hydrant(s) required, water service for the site will require an improvement to LWSD’s water distribution system of: a. feet of ” diameter water main to reach the site; and/or b. The construction of a water distribution system on the site; and/or c. A major portion of LWSD’s comprehensive water system plan would need to be implemented and/or constructed; and/or d. Other (describe): LWSD Developer Extension (DE) Agreement required. 3. a. The existing water system is in conformance with LWSD’s Comprehensive Water System Plan. b. The existing water system is not in conformance with LWSD’s Comprehensive Water System Plan and an Amendment to this Plan will be required. This may cause a delay in issuance of land use approvals or permits. 4. a. The subject property is within the corporate limits of Lakehaven Water & Sewer District, or has been granted Boundary Review Board approval for extension of water service outside of LWSD’s water service area. b. Annexation or Boundary Review Board approval will be necessary to provide service. 5. Water service is subject to: a. Payment of connection charges (to be determined by LWSD, for any new/modified service connections); b. Proof or reservation of easement(s) as required by LWSD; c. Other: LWSD Service Connection Application required, for any new/modified service connections. Comments/special conditions: Care shall be taken to avoid encroachment upon existing LWSD water and/or sewer mains, and/or associated easement(s), on the site. The nearest fire hydrants are on the Property (as shown on map on the back of this page). System hydraulic model results (FF #170, copy attached)), at no less than 20 psi, indicate that LWSD’s standard maximum allowable liquid velocity of 10 ft/s is exceeded at a fire flow rate above 3,500 GPM for two (2) hours or more. This flow figure depicts the theoretical performance of the water distribution system under high demand conditions. Fire flow rates greater than this may be accommodated through water distribution system improvements, contact LWSD for additional information. 538 Pressure Zone Est. Meter Elevation(s)-GIS: High 418+/-, Low 410+/- Est. Pressure Range at Meter(s) (psi): 43-55 I hereby certify that the above water system information is true. This certification shall be valid for one (1) year from the date of signature. Name: BRIAN ASBURY Title: DEVELOPMENT ENGINEERING SUPERVISOR Signature: Brian Asbury (e-signed) Date: 10/1/2020 7622400015 wtr swr.docx (Form Update 3/13/20) Page 2 of 4