Loading...
20-104353_Environmental Checklist-11-06-2020 v1Department of Community Development 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com Bulletin #050 – October 17, 2016 Page 10 of 15 k:\Handouts\Environmental Checklist b. Approximately how many units, if any, would be eliminated? Indicate whether high-, middle-, or low-income housing. c. Proposed measures to reduce or control housing impacts, if any: 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? b. What views in the immediate vicinity would be altered or obstructed? c. Proposed measures to reduce or control aesthetic impacts, if any: 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? b. Could light or glare from the finished project be a safety hazard or interfere with views? c. What existing off-site sources of light or glare may affect your proposal? d. Proposed measures to reduce or control light and glare impacts, if any: 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? none N/A none Street light from S 267th Street and light from parking lot No All exterior lighting will be shielded and directed away from neighboring properties to avoid spillage. Typical lighting for landscape, parking, security purposes. Exterior lights will be on timer or photocell and only on after dusk. The tallest height of any structure is 42'-8" above average building elevation; The principal exterior building material is composite fiber cement panels The design will meet City of Federal Way Design Guideline. Massing, modulation, materials, color and details will be carefully studied. Redondo Beach, 2.1 miles; Saltwater State Park, 2.9 miles, Rhododendron Species Botanical Garden, 4.9 miles Department of Community Development 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com Bulletin #050 – October 17, 2016 Page 1 of 15 k:\Handouts\Environmental Checklist SEPA ENVIRONMENTAL CHECKLIST Purpose of Checklist Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful to determine if available avoidance, minimization or compensatory mitigation measures will address the probable significant impacts or if an environmental impact statement will be prepared to further analyze the proposal. Instructions for Applicants This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use “not applicable” or "does not apply" only when you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with the SEPA process as well as later in the decision-making process. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Instructions for Lead Agencies Please adjust the format of this template as needed. Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only source of information needed to make an adequate threshold determination. Once a threshold determination is made, the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. Use of Checklist for Nonproject Proposals For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). Please completely answer all questions that apply and note that the words “project,” “applicant,” and “property or site” should be read as “proposal,” “proponent,” and “affected geographic area,” respectively. The lead agency may exclude (for non-projects) questions in Part B - Environmental Elements –that do not contribute meaningfully to the analysis of the proposal. Department of Community Development 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com Bulletin #050 – October 17, 2016 Page 2 of 15 k:\Handouts\Environmental Checklist A. BACKGROUND 1. Name of proposed project, if applicable: 2. Name of applicant: 3. Address and phone number of applicant and contact person: 4. Date checklist prepared: 5. Agency requesting checklist: 6. Proposed timing or schedule (including phasing, if applicable): 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. 10. List any government approvals or permits that will be needed for your proposal, if known. Redondo Heights TOD Multi-Service Center/Shelter Resources, Inc. Robin Corak P.O. Box 23699 Federal Way, WA 98093 (253) 838-6810 Federal Way Community Dedvelopment Land Use Permit: November, 2020 Building Permit: January, 2021 Construction start: August, 2021 No Wetland Survey, 9/18/2018, by Shelterwood Consulting Geotechnical Report, 8/24/2020, by Geotechnical Engineers Traffic Report, by TENW No Water & sewer certificate, Land Use Permit (including SEPA review, design review, zoning ode review), Building Permit October 12th, 2020 Department of Community Development 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com Bulletin #050 – October 17, 2016 Page 3 of 15 k:\Handouts\Environmental Checklist 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site: (circle one): Flat, rolling, hilly, steep slopes, mountainous, other _____________ b. What is the steepest slope on the site (approximate percent slope)? c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. A new multi-family development on a vacant 5-acre site, including 130 units in five 3-story buildings, a 1-story community center, 242 surface and below-grade parking spaces. Site improvement includes paving, parking, landscape, playground, community garden, bike storage, solid waste coral, etc. The lot is bound by S 276th Street at north, undeveloped lots to the east and south, and existing Silver Shadows Apartments to the east. The access is from Highway 99 thru the Silver Shadows. SECTION 33 TOWNSHIP 22N RANGE 4 EAST W.M. glacial till No Approx Cut: 16981 CY Approx Fill: 7830 CY, Erosion control measures are being proposed to be implemented during clearing and construction activities to mitigate potential for erosion Existing site slopes primarily fall within 5%-15%. There are isolated slope areas that fall within 40% to 50%” Department of Community Development 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com Bulletin #050 – October 17, 2016 Page 4 of 15 k:\Handouts\Environmental Checklist g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: 2. Air a. What types of emissions to the air would result from the proposal during construction, operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. c. Proposed measures to reduce or control emissions or other impacts to air, if any: 3. Water a. Surface Water: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. The proposal would generate dust and emission typically from this type of construction activities. No All vehicles and equipment will be properly maintained per state and federal standards. Idling of combustion engines will be minimized. No surface water body on or in the immediate vicinity of the site. N/A N/A N/A Approximately 65% impervious surface coverage Erosion control measures will include but not be limited to silt fence, interceptor swales and dikes, temporary rock construction entrance, inlet protection, and portable sediment tanks to treat construction runoff prior to discharge Department of Community Development 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com Bulletin #050 – October 17, 2016 Page 5 of 15 k:\Handouts\Environmental Checklist 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. b. Ground Water: 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: domestic sewage; industrial, containing the following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. c. Water runoff (including stormwater): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. 2) Could waste materials enter ground or surface waters? If so, generally describe. 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. d.Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: no No No waste will be discharged into the ground No No Main source of runoff will come from stormwater runoff from project impervious and pervious surfaces. Stormwter runoff will be collected and conveyed to a detention pond and discharged offsite via outfall pipe to existing City storm system and drainage ditch Project does not intend to alter existing site drainage patterns. Proposed conditions will provide flow control mitigation to meet Federal Way drainage requirements Proposed detention vault with flow control structure Department of Community Development 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com Bulletin #050 – October 17, 2016 Page 6 of 15 k:\Handouts\Environmental Checklist 4. Plants a. Check the types of vegetation found on the site: ____deciduous tree: alder, maple, aspen, other ____evergreen tree: fir, cedar, pine, other ____shrubs ____grass ____pasture ____crop or grain ____ Orchards, vineyards or other permanent crops. ____ wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other ____water plants: water lily, eelgrass, milfoil, other ____other types of vegetation b. What kind and amount of vegetation will be removed or altered? c. List threatened and endangered species known to be on or near the site. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: e. List all noxious weeds and invasive species known to be on or near the site. 5. Animals a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: birds: hawk, heron, eagle, songbirds, other: mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other: b. List any threatened and endangered species known to be on or near the site. None known. cottonwood None none known typical bird and mammals found in urban park Existing trees and shrubs will be removed as need to facilitate proposed construction. Some mature trees are intended to remain. Tree retention success is dependent upon actual health/condition of tree, final grades, utilities, and construction impacts. Proposed landscaping shall meet FWRC Section 19.125 requirements. Plant materials selected shall include drought tolerant native and regionally adapted species. Department of Community Development 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com Bulletin #050 – October 17, 2016 Page 7 of 15 k:\Handouts\Environmental Checklist c. Is the site part of a migration route? If so, explain. d. Proposed measures to preserve or enhance wildlife, if any: e. List any invasive animal species known to be on or near the site. 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. 1) Describe any known or possible contamination at the site from present or past uses. 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. No N/A none Electrical heating, cooling and cooking. Solar panel for water heating. No The proposed project will comply ESDS v3 No None known None known Typical construction equipment and materials will be stored on site during construction. No toxic or hazardous materials on site after construction. Department of Community Development 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com Bulletin #050 – October 17, 2016 Page 8 of 15 k:\Handouts\Environmental Checklist 4) Describe special emergency services that might be required. 5) Proposed measures to reduce or control environmental health hazards, if any: b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? 2) What types and levels of noise would be created by or associated with the project on a short- term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. 3) Proposed measures to reduce or control noise impacts, if any: 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. b. Has the project site been used as working farmlands or working forest lands? If so, describe. How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? 1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: no special requirement N/A The traffic from Highway 99 Typical noise associated with construction including traffic and equipment during construction standard working hours. Typical multi-family project traffic after project completion. During construction, operation hours will be limited per City requirements. The site is currently vacant. The site to the north is a parking lot, the immediate properties to the east and south are also vacant. The proposed project will be combined with the existing apartment development to the west by the same owner. No No Department of Community Development 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com Bulletin #050 – October 17, 2016 Page 9 of 15 k:\Handouts\Environmental Checklist c. Describe any structures on the site. d. Will any structures be demolished? If so, what? e. What is the current zoning classification of the site? f. What is the current comprehensive plan designation of the site? g. If applicable, what is the current shoreline master program designation of the site? h. Has any part of the site been classified as a critical area by the city or county? If so, specify. i. Approximately how many people would reside or work in the completed project? j. Approximately how many people would the completed project displace? k. Proposed measures to avoid or reduce displacement impacts, if any: l. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: m. Proposed measures to reduce or control impacts to agricultural and forest lands of long-term commercial significance, if any: 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low- income housing. None No RM1800 Multi-family - 1 DU/1800 SF N/A Approximately 240 people would reside in the completed project None N/A The proposal is near rapid transit and within 1/2 mile of the proposed Sound Transit station, is compatible with the master planning and projected land use. N/A 130 affordable units proposed. No Department of Community Development 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com Bulletin #050 – October 17, 2016 Page 11 of 15 k:\Handouts\Environmental Checklist b. Would the proposed project displace any existing recreational uses? If so, describe. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: 13. Historic and Cultural Preservation a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers ? If so, specifically describe. b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. 14. Transportation a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop? No N/A No No N/A N/A The site is currently served by bus on Highway 99, the nearest stop is directly across HWY 99 from the main entry. The Sound Transit Star Lake station is 1/2 mile from the site, currently under construction, expected to open in 2024. The access to the site is from HWY 99 thru the existing Silver Shadows. S 276th Street to the north is currently a private street. Department of Community Development 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com Bulletin #050 – October 17, 2016 Page 12 of 15 k:\Handouts\Environmental Checklist c. How many additional parking spaces would the completed project or non-project proposal have? How many would the project or proposal eliminate? d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. f. How many vehicular trips per day would be generated by the completed project or proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and nonpassenger vehicles). What data or transportation models were used to make these estimates? g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. h. Proposed measures to reduce or control transportation impacts, if any: 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. b. Proposed measures to reduce or control direct impacts on public services, if any. 16. Utilities a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other ___________ 242 parking stalls proposed, none eliminated The project site is within 1/2 mile of Sound Transit station No The project site is within 1/2 mile of Sound Transit station None significant - general public services for project this size N/A A comprehensive Traffic Impact Analysis will be prepared for the action, but no project specific mitigation measures are expected to occur beyond payment of traffic impact fees towards planned transportation system improvements. The project is expected to generated approximately 1,485 daily vehicle trips, with 183 AM peak hour and 198 PM peak hour vehicle trips. No significant truck trip generation is expected. Source data is the Trip Generation Manual, 10th Edition, ITE, 2017. Department of Community Development 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com Bulletin #050 – October 17, 2016 Page 13 of 15 k:\Handouts\Environmental Checklist b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Name of Signee: Position and Agency/Organization: Date Submitted: Water, sewer, storm water, power, phone/cable/internet November 5th, 2020 Bumgardner Architects Mancong Lin Department of Community Development 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com Bulletin #050 – October 17, 2016 Page 14 of 15 k:\Handouts\Environmental Checklist D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (IT IS NOT NECESSARY to use this sheet for project actions) Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in general terms. 1. How would the proposal be likely to increase discharge to water; emissions to air; production, storage, or release of toxic or hazardous substances; or production of noise? Proposed measures to avoid or reduce such increases are: 2. How would the proposal be likely to affect plants, animals, fish, or marine life? Proposed measures to protect or conserve plants, animals, fish, or marine life are: 3. How would the proposal be likely to deplete energy or natural resources? Proposed measures to protect or conserve energy and natural resources are: 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? Proposed measures to protect such resources or to avoid or reduce impacts are: Department of Community Development 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com Bulletin #050 – October 17, 2016 Page 15 of 15 k:\Handouts\Environmental Checklist 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans? Proposed measures to avoid or reduce shoreline and land use impacts are: 6. How would the proposal be likely to increase demands on transportation or public services and utilities? Proposed measures to reduce or respond to such demand(s) are: 7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environment.