Loading...
20-104112 r t Mechanical City of Federal way Permit #:20-104112-00-ME Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 ALEInspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: BRUSH Project Address: 29026 13TH AVE S Parcel Number:516210 0120 Project Description: replace gas furnace • Owner Applicant Contractor JOHN BRUSH TERESA ANDERSONVALLEY FURNACE VALLEY FURNACE INC(GENERAL) 29026 13TH AVE S INC VALLEFI161R6(12/26/21) FEDERAL WAY WA 98003-3765 7818 E RIVER RD PUYALLUP WA 98371 PO BOX 507 PUYALLUP WA 98371 Additional Permit Information Mechanical Work Valuation? 3400.00 Is this an Online or O.T.C.application? Yes �aft, �3 � o -Ae � � 9��'� 3 -> a l�U +S � .1'� 3�I 3'� z �� �3��� 133 �+' �'�. .!<!, sa a s X39 r Y t z�S iii 39 3 ....._ tl MtUI!'+ll f a. q"' .n 3�,.,,o,_'' u. ,mp, air..?' ,.h "k a Furnaces 1 PERMIT EXPIRES Wednesday,21 April,2021 Permit Issued on Friday,October 23,2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of owih' on THE Federal Way. Owner or agent: Date: THIS CARD IS TO REMAIN ON-SITE CITY OF �*414% Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 020— /°Y772 �l— Address: a 90 ,2(o /37-' /TlC:- S Project: 3rufrAt Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. r El Mechanical Rough-in (4165) Q Gas Piping(4125) W Final- Mechanical(4065) Approved Approved to release test Approved By Date By Date By/6.47_c DatejO / %'o.a 0 Rough Electrical 0 Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date