20-103491 -
Electrical
CityCommunity Federal
Permit #:20-103491-00-EL
33325 8th Ave S
Federal Way,WA 98003 FILE
Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: JACKSON
Project Address: 2511 S 279TH PL Parcel Number:757561 0540
Project Description: Electrical connection for gas to gas furnace change out and run electrical for 2 1/2-ton a/c
Owner Applicant Contractor
CLAUDE JACKSON JAIMIE HOWBRENNAN HEATING&A/C BRENNAN HEATING&A/C LLC
2511 S 279TH PL • 4601 S 134TH PL (ELECTRICAL)
FEDERAL WAY WA 98003 SEATTLE WA 98168 BRENNHA962DU(3/31/22)
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Is this an Online or O.T.C.application? Yes
�3 3k3' µ ii,< 1e0 .z� � ,,�'�Y�.t,�,�3..�.F,P EBF < s,.�e: z ^?' e
Circuits-Residential 2 Thermostat 1
PERMIT EXPIRES Friday, 10 September,2021
Permit Issued on Thursday,September 10,2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: ONILINE Date:
THIS CARD IS TO REMAIN ON-SITE
Feclera�4A1'. Construction Inspection Record
Way INSPECTION REQUESTS:(253)835-3050
PERMIT#: 20 103491 00 Address: 2511 S 279TH PL
Project: CLAUDE JACKSON FEDERAL WAY WA 98003-6938
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
'
El UFER Ground(4295) ® Ditch cover(4030) ID Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date ' By Date j By Date
0 Pool Bonding(4195) 0 Temporary Power(4275) VI Temporary Service(4235)
Approved Approved Approved
By Date By Date By Date •
® Feeders/Sub-panels(4045) ® Rough Electrical(4225) 0 Ceiling Cover(4020)•
Approved Approved Approved
By Date By Date By Date
El Final-Electrical(4055)
Approved Q fin
By� Date 10\OI pbao
0 Rough Electrical ❑ Final Electrical E Right of Way
Approved Approved Approved
By Date , By Date By Date