Loading...
18-105303 el Plumbing ' City of Federal Way r , Permit #:18-105303-00-PL Community Development Dept. F r 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax(253)835-2609 Project Name: MIRROR LAKE VILLAGE SENIOR HOUSING BLDG B Project Address: 31010 9TH PL SW Parcel Number:072104 9087 Project Description: Install plumbing fixtures for new senior housing facility. • Owner Applicant Contractor MIRROR LAKE VILLAGE LLC TODD SARGEANTWATTENBARGER PETRA INC/PETRA INC OF IDAHO PO BOX 6961 ARCHITECTS PETRAII927JM(5/16/20) BELLEVUE WA 98008 11000 NE 33 PL SUITE 102 BELLEVUE WA 980 04- 16310 NE 80TH ST SUITE 200 REDMOND WA 98052 i,»._.. «.w .. ,':�� ., ...Y�, .a.0 �✓rel/�3"vr „� .. ' �,. '-�ti.. ,..,f .. ,,, . ._ sem..... :��u.<.. ., Bathtubs 40 Dishwashers 1 Drains 6 Laundry Washer Outlets 5 Lavatories 36 Rain Water Systems 1 Showers 40 Sinks 49 Urinals 1 Vacuum Breakers 5 Water Closets 40 PERMIT EXPIRES Monday,8 July,2019 Permit Issued on Wednesday,January 9,2019 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: I / (i '9 tl , _• i , r ill& THIS CARD IS TO REMAIN ON-SITE �� y Construction Inspection Record INSPECTION REQ TS:(253)835-3050 PERMIT#: 18 105303 00 Address: 31010 9TH PL SW Project: MIRROR LAKE VILLAGE LLC FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El Plumbing Groundwork(4190) El Rough Plumbing(4230) 0 Final-Plumbing(4075) Approved to cover Approved Approved By Date By Date By Date ��' _.r • 0 Rough Electrical 0 Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date • • • ..2" - ) . . J . � I • 7 O 5 .,, I 4 % °..‘ f.J.„ \,,, - -,1 .°‘ L. . z a ... n , ....e,) , k-k ....14. ....i), e.... _4 .,- < io q . - . 4 2 z. . ) ...... , ' s 4. CI \37 N