Loading...
20-103138 FILE Electrical City of Federal Way Permit #:20-103138-00-EL Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: CHEVRON Project Address: .1650 SW DASH POINT RD Parcel Number: 122103 9069 Project Description: (1)ALTERED 20AMP CIRCUIT(826240) Owner Applicant Contractor SUKHJIT S MINHASSARS ENTERPRISES LAURA RANNOWVECA ELECTRIC& VECA ELECTRIC&TECH LLC 1650 S DASH POINT RD TECH LLC VECAEET821OQ(2/21/21) FEDERAL WAY WA 98023-4530 5614 7TH AVE S PO BOX 80467 SEATTLE WA 98108 SEATTLE WA 98108 Additional Permit Information Is this an Online or O.T.C.application? Yes N -n 3 r 3 fi -� 3 t ` i -f x 3c ! � ;� New Service:0- 100 amps(C( 1 PERMIT EXPIRES Saturday, 14 August,2021 Permit Issued on Friday,August 14,2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of hi t nd it eral Way. Owner or agent: Date: THIS CARD IS TO REMAIN ON-SITE F'ederai Wa Construction Inspection Record y INSPECTION REQUESTS:(253)835-3050 PERMIT#: 20 103138 00 Address: 1650 SW DASH POINT RD Project: SUKHJIT S MINHAS FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El UFER Ground(4295) 1 Ditch cover(4030) ® Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date • ® Pool Bonding(4195) El Temporary Power(4275) ® Service(4235) Approved Approved Approved *By Date By Date ��By Date ® Feeders/Sub-panels(4045) Q Rough Electrical(4225) ® Ceiling Cover(4020) Approved Approved Approved By Date �.By Date 06By Date • • ® Final-Electrical(4055) Approved By \12_1(... Dated 4)?c . Rough Electrical 0 Final Electrical Right of Way Approved Approved Approved By Date By Date By Date