Loading...
20-100492 60. Electrical City of Federal Way Permit #:20-100492-00-EL Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: KRAMAREVSKY Project Address: 34608 25TH AVE SW Parcel Number:011470 0109 Project Description: Temporary power for construction of new residence • Owner Applicant Contractor BEALKO INC GALINA KRAMAREVSKY OWNER P O BOX 3266 28134 29 AVE S OWNER FEDERAL WAY WA 98063 FEDERAL WAY WA 98003 Additional Permit Information Is this an Online or O.T.C.application? Yes Temp. Service: 0-60 amps(A 1 PERMIT EXPIRES Friday,5 February,2021 Permit Issued on Thursday,February 6,2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. • Owner or agent: Date: FILE • THIS CARD IS TO REMAIN ON-SITE "��' Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 20 100492 00 Address: 34608 25TH AVE SW Project: BEALKO INC FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ® UFER Ground(4295) 0 Ditch cover(4030) / 0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date ..BY Date ® Pool Bonding(4195) ® Temporary Power(4275) El Service(4235) Approved Approved Approved By Date By Date d By Date ® Feeders/Sub-panels(4045) ® Rough Electrical(4225) El Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date , El Final-Electrical(4055) Approved 1 � By g.. eI YDaty/rxbis, • El Rough Electrical 0 Final Electrical Right of Way Approved Approved Approved By Date By Date By Date