Loading...
20-103674 Mechanical City of Federal WayPermit #:20-103674-00-ME Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: DARGIE Project Address: 2611 SW 308TH ST Parcel Number: 122103 9118 Project Description: GAS FURNACE REPLACEMENT Owner Applicant Contractor CLIFFORD DARGIE RACHAEL AILSHIEPACIFIC HEATING& PACIFIC AIR SYSTEMS(GENERAL) 2611 SW 308TH ST COOLING PACIFAS093KA(9/8/21) FEDERAL WAY WA 8607 DURANGO ST SW 98023-7820 LAKEWOOD WA 98499 12811 PACIFIC HWY SW LAKEWOOD WA 98499 Additional Permit Information Mechanical Work Valuation? 8303 Is this an Online or O.T.C.application? Yes ', Fif7f � �. '• y 91 171194111:40T1;,' l Furnaces PERMIT EXPIRES Tuesday,23 March,2021 Permit Issued on Thursday,September 24,2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of CiNt1.1rJfEeral Way. Owner or agent: Date: nom THIS CARD IS TO REMAIN ON-SITE ��°� Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 20 103674 00 Address: 2611 SW 308TH ST Project: CLIFFORD H DARGIE FEDERAL WAY WA 98023-7820 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read leftto right topto bottom) Please schedule inspections as propriata—Work•nwst tot be covered:until it is approved. Cheek with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ® Mechanical Rough-in(4165) I ® Gas Piping(4125) 1 ® Final-Mechanical(4065) Approved Approved to release test Approved ` / 4-2 0 By Date ' By Date By ���� Date//'/ 0 Rough Electrical 0 Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date