19-103353 t
Mechanical
City of Federal Way Permit #:19-103353-00-ME
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: LEUNG/DAO
Project Address: 33404 29TH PL SW Parcel Number:010060 0980
Project Description: Gas Pipe addition for range
•
Owner Applicant Contractor
ALEX T LEUNG ALISHA WILSONEAGLE PIPE& EAGLE PIPE&MECHANICAL LLC
33404 29TH PL SW MECHANICAL LLC EAGLEPM867LK(6/12/20)
FEDERAL WAY WA 54 S SEVEN SISTERS RD
98023 PORT LUDLOW WA 98365 54 S SEVEN SISTERS RD
PORT LUDLOW WA 98365
Additional Permit Information
Mechanical Work Valuation9 1880 Is this an Online or O.T.C.application') Yes
an� � �,° , ,{' ala ' a€ �) ��'' €-" A ar
Gas Pipe Outlets 3
PERMIT EXPIRES Saturday, 11 January,2020
Permit Issued on Monday,July 15,2019
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
a i gto of Federal Way.
Owner or agent: d t Date:
e
6.
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
Federal Way INSPECTION REQUESTS:(253)835-3050
PERMIT#: 19 103353 00 Address: 33404 29TH PL SW
Project: QUYNH GIAO DAO FEDERAL WAY WA 98023-2716
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) ® Gas Piping(4125) 0 Final-Mechanical(4065)
Approved Approved to release test ! Approved
/19 By Date By Date 7/ c By fi-'1 Date OILS I 0019
SITE
Rough Electrical El Final ElectricalElRight of Way
Approved Approved Approved
By Date By Date By Date