Loading...
18-105184 r Electrical City of Federal Way • CommmityDevelopment Dept. Permit #•18-105184-00-EL 33325 8th Ave S Federal Way,WA 98003 ' Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax(253)835-2609 Project Name: MIRROR LAKE VILLAGE SENIOR HOUSING FOUR-PLEX(R-6) Project Address: 888-894 SW 311TH CT Parcel Number:072104 9087 Project Description: Service and wiring for new senior housing duplex. Owner Applicant Contractor MIRROR LAKE VILLAGE LLC RACHEL MASONMERIDIAN CENTER MERIDIAN CENTER ELECTRIC INC(01) PO BOX 6961 ELECTRIC INC MERIDCE318SG(2/28/19) BELLEVUE WA 98008 11109 66TH AVE E PUYALLUP WA 98373 11109 66TH AVE E PUYALLUP WA 98373 Additional Permit Information Is this an Online or O.T.C.application Yes Temp.Service:401 -600 amp: 1 PERMIT EXPIRES Friday,1 November,2019 Permit Issued on Thursday,November 1,2018 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accords 'ty'th the laws, rules and regulations of the State of NETof Federal Way. Owner or agent: Date: THIS CARD IS TO REMAIN ON-SITE - crrr os 1/M�� Feder Construction Inspection Record y INSPECTION REQUESTS:(253)835-3050 PERMIT#: 18 105184 00 Address: 888-894 SW 311TH CT Project: MIRROR LAKE VILLAGE LLC FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate..Work must not be until it is approved. Check with your inspector if you are UMWabeutanpofthe inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 UFER Ground(4295) 0 Ditch cover(4030) EI Slab/Concrete Floor(4255) Approved Approved A oved to place concrete .By Date By .f i'- Date fie /� f . By ,K Date i7, , - I 7 0 Pool Bonding(4195) 0 Temporary Power(4275) •0 Service(4235) Approved Approved Approved By Date By Date By'le Date/f 7�/ El Feeders/Sub-panels(4045) ® /Rough Electrical(4225) El Ceiling Cover(4020) p proved By / �f Approved Da /— P By 'AA Dat�" -"/ i 7 By Approved Date ® Final-Electrical(4055) Approved By Date 4 2 i 0 Rough Electrical 0 Final Electrical 0 Right of Way Approved Approved Approved By Date . By Date By Date