18-105184 r Electrical
City of Federal Way •
CommmityDevelopment Dept. Permit #•18-105184-00-EL
33325 8th Ave S
Federal Way,WA 98003 ' Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax(253)835-2609
Project Name: MIRROR LAKE VILLAGE SENIOR HOUSING FOUR-PLEX(R-6)
Project Address: 888-894 SW 311TH CT Parcel Number:072104 9087
Project Description: Service and wiring for new senior housing duplex.
Owner Applicant Contractor
MIRROR LAKE VILLAGE LLC RACHEL MASONMERIDIAN CENTER MERIDIAN CENTER ELECTRIC INC(01)
PO BOX 6961 ELECTRIC INC MERIDCE318SG(2/28/19)
BELLEVUE WA 98008 11109 66TH AVE E
PUYALLUP WA 98373 11109 66TH AVE E
PUYALLUP WA 98373
Additional Permit Information
Is this an Online or O.T.C.application Yes
Temp.Service:401 -600 amp: 1
PERMIT EXPIRES Friday,1 November,2019
Permit Issued on Thursday,November 1,2018
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accords 'ty'th the laws, rules and regulations of the State of
NETof Federal Way.
Owner or agent: Date:
THIS CARD IS TO REMAIN ON-SITE -
crrr os 1/M��
Feder Construction Inspection Record
y INSPECTION REQUESTS:(253)835-3050
PERMIT#: 18 105184 00 Address: 888-894 SW 311TH CT
Project: MIRROR LAKE VILLAGE LLC FEDERAL WAY WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate..Work must not be until it is approved. Check with your inspector if
you are UMWabeutanpofthe inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 UFER Ground(4295) 0 Ditch cover(4030) EI Slab/Concrete Floor(4255)
Approved Approved A oved to place concrete
.By Date By .f i'- Date fie /� f . By ,K Date i7, , - I
7
0 Pool Bonding(4195) 0 Temporary Power(4275) •0 Service(4235)
Approved Approved Approved
By Date By Date By'le Date/f 7�/
El Feeders/Sub-panels(4045) ® /Rough Electrical(4225) El Ceiling Cover(4020)
p
proved
By / �f Approved Da /— P By 'AA Dat�" -"/ i 7 By Approved Date
® Final-Electrical(4055)
Approved
By Date 4 2 i
0 Rough Electrical 0 Final Electrical 0 Right of Way
Approved Approved Approved
By Date . By Date By Date