Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
19-104914
s - VV Electrical City of Federal Way Permit #:19-104914-00-EL Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: DEL FIERRO Project Address: 32680 9TH PL S Parcel Number:326070 0370 Project Description: Add outdoor outlet. Owner Applicant Contractor JUDY DEL FIERRO JUDY DEL FIERRO OWNER IS CONTRACTOR 32680 9TH PL S 32680 9TH PL S FEDERAL WAY WA 98003 FEDERAL WAY WA 98003 Additional Permit Information Is this an Online or O.T.C.application9 Yes 1 S` ' eti Af 4 "3jzu ,.,�h'� _ Ak..� ,, »3,,; n„2 :roe. Circuits-Residential 1 PERMIT EXPIRES Friday,9 October,2020 Permit Issued on Thursday,October 10,2019 I hereby certify that the above information is correct and that the construction on the above described property and the oc upancy and the use will be in accordance with the laws, rules and regulations of the State of ash-gt• and the City of Federal Way. Owner or ag-k0,.41�� "� q(M ()� Date:/& //D or c i THIS CARD IS TO REMAIN ON-SITE `""°` Wt4 Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 19 104914 00 Address: 32680 9TH PL S Project: JUDY DEL FIERRO FEDERAL WAY WA 98003-5921 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as aim , Work must net be eevered tmtit it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ® UFER Ground(4295) 0 Ditch cover(4030) I El Slab/Concrete Floor(4255) Approved Approved Approved to place concrete •By Date By Date • I By Date •' Ei Pool Bonding(4195) IDTemporary Power(4275) El Service(4235) Approved Approved Approved • By Date �,By Date By Date ® Feeders/Sub-panels(4045) ® Rough Electrical(4225) •j 0 Ceiling Cover(4020) Approved Approved Approved By Date ' By Date By Date El Final-Electrical(4055) Approved �,� ,ByeZSZ i Date r`� AO , 4;ill • • 0 Rough Electrical 0 Final Electrical Right of Way Approved Approved Approved By Date By Date 4,By Date t 41111/4.�,. RECEIVED ELECTRICAL CITY OF 11111111 Federal WayCITY OCT 10 2019 PERMIT APPLICATION COM UNITY ERAL OCT WAY r=l/E'LOPA�ENT � / PERMIT NUMBER l q _ C o '7 9 / -t- _ _..... L.- ,-, SUITE/UNIT/SPACE# SITE ADDRESS: i ('�t-0 ,'4 Q/ ' 1) / e12 ai t" hi A._ PROJECT VALUATION bill ASSESSOR'S TAX/PARCEL# 'I� ' L• �� ' ( CURRENT/PROPOSED USE $ Sal.0 3 06 -7 0 - O 3 70 PROJECT NAME . (Tenant or Homeowner Last Name) `/ t 'IE.-1242J) Lot i Q OOv>2- eikC- r-t cal—Ler- PROJECT u.-LSTPROJECT DESCRIPTION Detailed description of work to be included on this permit only NAM Ed cW ! ,////J�� )f (r, 2A} PRIMARY -E PROPERTY OWNER ,,�(AIICZa�=-�Iw ( (..✓�) 7-q3-0/140 MAILING ADDRESSE- L a 330sz 32 -'ci'l" �,4C 5v _M coQ antaSt tiet CITY STATE ZIP FAX FAX (t0E) \ w - 401 eZV 3 ( ) - NAME PRIMARY PHONE B k1 1;51,6 11 ( ) - MAILING ADDRESS E-MAIL ELECTRICAL CONTRACTOR CITY STATE ZIP FAX ( ) - WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# / / NAME f` '( �j 12-i2--D -�r,� PRIMARYMPHONE APPLICANT " U'° "1 `� (200) l"l > 60-4o MAILING ADDRESSE-MAIL 327W - FL ,L71) CITY VC Y 1 �1/0(\-( VV I�STATE ZIPbf ^ () ( ) FAX - NAME ` j��V` PRIMARY PHONE PROJECT CONTACT c001/\ &,p n CC (� Z) o )1%6 I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs, expenses,and attorneys'fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information s pplied to the city as a part of this application. ( 0- ei- l SIGNATURE:►�cl DATE IPRINT NAME: I - LCe, t--- ._ u Bulletin#160—April 14,2016 Page 1 of 1 k:\-iandouts\Electrical Permit Application RECEIVED g-10 (ct(k-f -EL 4. OCT 10 2019 44\.,ii.,,, CITY OF FEDERAL WAY Property Owner c�Tv of COMMUNITY DEVELOPMENT P Y Federal Way Electrical Work Permit Application . _ - , - ' 3 Y,, Applying For Your Electrical Permit _ . _ 1_. 1 In Washington, only licensed electrical contractors may perform electrical work. Property owners may apply for an exemption from these requirements by completing this application and signing the affidavit below before beginning electrical work. W-` As authorized under RCW 19.28.261, I,V . . dQ,1/ �KK-tJ hereby apply (Printed ame of property owner,renter,or lessee) I for an exemption from the electrical licensing and certification requirements of RCW 19.28 by i - submission ofthis affidavit. i Which statement describes you? (Mark only one If none apply you may not take out this permit) _ . V !--14 I own this property. IYour name or your company's name must be shown on the deed to the property. Real estate agents'property . management companies, relatives, etccannot purchase permits for the property owner. A 0 I rent or lease thisproperty. We need a copy of your rental agreement showing you have permission to perform electrical work ❑ I am an officer for a 501(c)(3)nonprofit corporation,or a nonprofit religious organization. 1 The total market value of electrical work must be$30,000 or less and all electrical work must be done by a non-compensated appropriately certified electrician. i. Select your property type.(Mark,only one If none apply you may not take-out this permtt) _„ New single family residence that is not intended for K for rent, sale, or lease,where I will be living for Ci\is V at least 24 months after completing the electrical work. I will be personally doing the electrical work. f ❑ New 2,3,or 4 unit residential building,owned by me,that is intended for rent, sale, or lease. I will be living in one of the units for at least 24 months after completing electrical work. I, personally, and/or a regularly employed employee(s),will be doing the electricalwork. ❑ New place of business,farm,or other property: Any new structure that is not intended for rent, t sale,or lease. I>personally,and/or a regularly employed employee(s),will be doing the electrical work. 1 Existing residential property, place of business,or farm.I, personally,and/or a regularly employed employee(s),will be doing the electrical work. t DEPARTMENT OF COMMUNITY DEVELOPMENT/33325 8TH AVENUE SOUTH/FEDERAL WAY,WA 98003-6325 253-835-2607 zswww.cityoflederalway.com zs permitcenter(a cityoffederalway.com Bulletin 11080-June 6,2018 Page 1 of 2 k:\Handouts\Property Owner Electrical Work Application 4, ❑ 501(c)(3) or nonprofit religious organization owned property:The total market value of the electrical work must be$30,000 or less,and all electrical work will be performed by appropriately certified electricians,or certified and properly supervised trainees, who are volunteering and not being compensated for the electrical work per RCW 19.28.091(7). Your signature is required below: t from the I believe I should be exempt requirements to obtain an electrical license,or use a certified electrician,as provided under RCW 19.28.261. By signing below,I certify the information I am providing on this affidavit is true and accurate. I understand that if I make false statements or misrepresentations, I ma b assessed penalties. CuCW S. CPI "11 ,44) l( ' ` ?' ThPrinted Name of Property Owner,Renter,or Lessee i Signature >'V/ /P9 Date 17-7.11,77:41-7477;`,;',;-7,7 z1 s - MT F a, �;nmw r:- .c.7 :,';z.t'- 1.' " n4 ,,, a `� rQpiC Owner ld4nspectr©n tetitiffl11114:011 dam, e0-0 Property Owner's Name(Last,First)or Company Name -'21pft ./01k-/h,.. 0 z ' ttitA9 , 60-7)-b-3 :: Mailing Address Unit/Apt.# City State Zip 7ia1 c 4oV _S&(96,c uivI(o- t, Daytime Phone 1 Email Address i , J oto l 611?- Inspection Site Address(if different) Unit/Apt.# City State Zip ,;S; K uhf ��� [(al— /..'in ., — County Elec rical Power Company/Serving Utility 1 Descrlptlon of work being done(E)iample:adding'otitletsin thekrtchen second floor break area;etc) ; .I ‘4‘ GW II, P . .�L C U DEPARTMENT OF COMMUNITY DEVELOPMENT/33325 8TH AVENUE SOUTH/FEDERAL WAY,WA 98003-6325 253-835-2607 www.cityoffederalway.com permitcenter(a�cityoffederalway.com Bulletin#080—June 6,2018 Page 2 of 2 k:\Handouts\Property Owner Electrical Work Application