Loading...
21-100016_Water Availability LOT-9069_1-4-2021_v1Form Name: ZPM_SMF_WATERCERT_009A1 Page 1CERTIFICATE OF WATER AVAILABILITY PARTA-TOBECOMPLETED BY APPLICANT PROJECT ADDRESS: XXX SW 333RD PL, FEDERAL WAY, WA 98023 APPLICATION NUMBER: 20000218331 SUBDIVISION/PROJECT NAME: NEW CONST. SFD - XXX SW 333RD PL PARCEL: PA1421039069 Proposed Water Usage:1 (# of connections) Customer Type:RESIDENTIAL Is there an Auxiliary Source of Water on the Parcel?NO I, the undersigned, or my appointed representative have requested the following purveyor to certify willingness and ability to provide the indicated service. I have read and understand the information provided by the water purveyor on this certificate, and acknowledge that the proposed project may require improvements to the water system which would incur my financial obligation. Prior to final approval for construction of the water facilities, it is understood that a legal contract between myself and the water utility which specifies the term of water service, operational responsibilities, and financial obligation may be required. NAME:MICHELLE HENRY SIGNATURE: ____________________________________________ ADDRESS:35001 NE 147TH AVE CITY:YACOLT STATE:WA ZIP:98675 (Please ensure that the above is completed PRIOR to submittal to Tacoma Water) PARTB-TOBECOMPLETED BY WATER PURVEYOR Water System To Provide Service CITY OF TACOMA State ID#86800N Equivalent Residential Units:1 The proposed development is within our approved water service area. This water utility will be providing service. Approved number of connections:N/A. Existing source capacity 164 MGD Number of Current/existing users:N/A Existing Storage:141 MG Water service will be provided by: Direct Connection to approved, existing water main. ***The customer is not allowed to install their water service pipe parallel to and inside a Pierce County Right of Way. Obtaining an easement/permission to install your water service pipe on adjacent private property may be an alternative to constructing a new water main. Contact Tacoma Water for details/requirements for constructing a water main.*** Are water system facilities approved in accordance to DOH requirements?YES. Water service will be made available to this project by (date):N/A. The date that water service is made available is determined after the customer meets the requirements for service as indicated by the Water Division,in accordance with City Code 12.10,and upon receipt of applicable permits. Page 2CERTIFICATE OF WATER AVAILABILITY PROJECT ADDRESS: XXX SW 333RD PL, FEDERAL WAY, WA 98023 APPLICATION NUMBER: 20000218331 SUBDIVISION/PROJECT NAME: NEW CONST. SFD - XXX SW 333RD PL PARCEL: PA1421039069 FIRE FLOW INFORMATION: FOR ALL RESIDENTIAL PROJECTS. WATER MAINS: * Location of nearest main capable of supplying at least 500 GPM:HOYT RD SW If not in street at front of property, distance from property to above main is:N/A feet. *Estimated Fire Flow at 20 PSI is:1000 ± GPM for 60 minutes. *Estimated static pressure at project location is:112 ± PSI. NOTE: If specific data are required, contact Tacoma Water to arrange for a flow test. Tests will be conducted by the Water Division at the expense of the applicant. HYDRANTS: * Distance from centerline of property frontage to nearest hydrant measured along routes of fire apparatus travel is:509 ± feet. THE AMOUNT OF AVAILABLE FIRE FLOW INDICATED ABOVE IS IN ADDITION TO REQUIREMENTS FOR NORMAL DOMESTIC MAXIMUM USE. A WATER SYSTEM VICINITY MAP WHICH SHOWS THE WATER MAINS AND HYDRANTS SERVING THIS PROJECT IS REQUIRED FOR ALL PROJECTS. A contract has not been signed with the applicant for water service. The above information is an accurate account of the existing or necessary water system facilities. FOR PRELIMINARY SHORT PLAT OR SUBDIVISIONS: We understand that this document, in absence of a legal contract, constitutes a certification of willingness and ability to provide water service subject to the conditions noted. WATER PURVEYOR:CITY OF TACOMA, T.P.U., WATER DIVISION.DATE:12/18/2020 SIGNATURE: ___________________________________________________ TITLE: _____________________ FOR FINAL SHORT PLAT, SUBDIVISION, BUILDING PERMIT, SEPTIC DESIGN:WATER MAIN ONLY APPROVED FOR FINAL ACCEPTANCE, NOT PRIVATE CONTRACT ACCEPTANCE We the undersigned water purveyor, certify that we will assume full operational and maintenance responsibility for the above water system which has been designed, approved, and installed in accordance with Washington Administrative Code 246-290, RCW 90.44 (Water Rights Permits), Pierce County Code 17C.60.165 and 19D.130, and an approved water system comprehensive plan. WATER PURVEYOR:CITY OF TACOMA, T.P.U., WATER DIVISION.DATE:12/18/2020 SIGNATURE: ___________________________________________________ TITLE: _____________________ This certificate is valid for a period of THREE YEARS from the date of issue solely for the specific property/project indicated. Changes in the number of lots and/or use will require re-application by the applicant, evaluation by the department and issuance of a new certificate. (Board of Health Resolution No. 2001-3282 - Land Use Regulations) THE ABILITY TO PROVIDE SERVICE IS DEPENDENT ON PIERCE COUNTY'S WILLINGNESS TO PERMIT THE INSTALLATION,WHICH MAY INCLUDE CUTTING THE DRIVING SURFACE OF THE STREET.