Loading...
20-104481 *++ h Electrical City of Federal Way Community Development Dept. Permit #.• 20-104481-00-EL 33325 8th Ave S FILE Federal Way, 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: HARE Project Address: 1203 SW 347TH PL Parcel Number:666490 0380 Project Description: STANDARD RECONNECT FOR GAS FURNACE Owner Applicant Contractor DANIEL HARE RACHAEL AILSHIEPACIFIC HEATING& PACIFIC AIR SYSTEMS(ELECTRICAL 1203 SW 347TH PL COOLING 02) FEDERAL WAY WA 8607 DURANGO ST SW PACIFAS853LB(6/2/21) 98023-7044 LAKEWOOD WA 98499 12811 PACIFIC HWY S LAKEWOOD WA 98023 • Additional Permit Information Is this an Online or O.T.C.application? Yes `�` p .,. � _>3.,._;�' a r 3 1Ivs,Y,ie :,�Y�.� Low Voltage-Other(Resident I PERMIT EXPIRES Tuesday,16 November,2021 Permit Issued on Monday,November 16,2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ONLINE Date: THIS CARD IS TO REMAIN ON-SITE .044Construction Inspection Record Fe%lel aI Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 20 104481 00 Address: 1203 SW 347TH PL Project: ALICIA C HARE FEDERAL WAY WA 98023-7044 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ® UFER Ground(4295) , ® Ditch cover(4030) El Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date 0 Pool Bonding(4195) ® Temporary Power(4275) ® Service(4235) Approved Approved Approved •By Date �By Date ��By Date • 0 Feeders/Sub-panels(4045) ® Rough Electrical(4225) 9❑ Ceiling Cover(4020) Approved Approved Approved By Date By� Date i By Date El Final-Electrical(4055) By I/ Approved y� Date /j�/frp21/ 0 Rough Electrical 0 Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date • .