20-103850 IVMP"
Mechanical
City of Federal Way I Permit #:20-103850-00-ME
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: TAJON
Project Address: 33018 20TH PL SW Parcel Number:010457 0800
Project Description: GAS FURNACE REPLACEMENT
Owner Applicant Contractor
TENNYSON TAJON RACHAEL AILSHIEPACIFIC HEATING& PACIFIC AIR SYSTEMS(GENERAL)
33018 20TH PL SW COOLING PACIFAS093KA(9/8/21)
FEDERAL WAY WA 98023 8607 DURANGO ST SW
LAKEWOOD WA 98499 12811 PACIFIC HWY SW
LAKEWOOD WA 98499
Additional Permit Information
Mechanical Work Valuation? 3825 Is this an Online or O.T.C.application? Yes
1 '
fitD;M^ \ a Wea4 :11, 'T;
Furnaces 1
PERMIT EXPIRES Sunday,4 April,2021
Permit Issued on Tuesday,October 6,2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: C t4 L._I Is4 E Date:
'91/)-
.01 ° THIS CARD IS TO REMAIN ON-SITE
Federal Wa Construction Inspection Record
y INSPECTION REQUESTS:(253)835-3050
PERMIT#: 20 103850 00 Address: 33018 20TH PL SW
Project: TENNYSON TAJON FEDERAL WAY WA 98023-6478
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
® Mechanical Rough-in(4165) ® Gas Piping(4125) 1N I Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date By a Date/2, .f-A0
•
0 Rough Electrical El Final Electrical Q Right of Way
Approved Approved Approved
By Date By Date By Date