Loading...
20-104226 Plumbing City of Federal Way Permit #:20-104226-00-PL Community Development Dept. FILE 33325 8th Ave S Federal Way,WA 98003 Inspection'Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: MANALO Project Address: 4105 SW 315TH ST Parcel Number:873198 2620 Project Description: Repipe: replace galvanized water pipes with PEX. Owner Applicant Contractor BENJAMIN MANALO HARMINDER SINGHGLOBAL PLUMBING GLOBAL PLUMBING 4105 SW 315TH ST 20216 108TH AVE SE GLOBAP'880MS(7/11/22) FEDERAL WAY WA 98023 KENT WA 98031 PO BOX 58322 RENTON WA 98058 � � �1 € ' � -. 7 _ r,�;,i <a.__..,�.�: Bathtubs 1 Lavatories 2 Showers 1 Sinks 1 Water Closets 2 PERMIT EXPIRES Wednesday,28 April,2021 Permit Issued on Friday,October 30,2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ostiEnitigEederal Way. Owner or agent: Date: , THIS CARD IS TO REMAIN ON-SITE Federal eral Wa lA Construction Inspection Record Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 20 104226 00 Address: 4105 SW 315TH ST Project: PATRICIA MANALO FEDERAL WAY WA 98023-2131 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. a 'Si • ® Plumbing Groundwork(4190) ip Rough Plumbing(4230) ® Final-Plumbing(4075) Approved to cover Approved I Approved By Date By Date .,'k By 94" Date 14,l)y1.(• • 0 Rough Electrical Q Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date