Loading...
19-100340 Building - Single Family City of Federal way Permit #:19-100340-00-SF Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: KHARIK Project Address: 35645 9TH AVE SW Parcel Number:440560 0170 Project Description: NEW-Construction of a 4646 square foot 2-story single family residence with a 114 square foot covered entry,465 square feet of decks and a 662 square foot attached garage. Includes plumbing and mechanical. **4 Bedrooms;$650,000 Estimated Selling Price** Owner Applicant Contractor Lender JENNIFR KHARIK JENNIFR KHARIK OWNER IS CONTRACTOR OWNER IS LENDER 35809 9TH AVE SW 35809 9TH AVE SW FEDERAL WAY WA 98023 FEDERAL WAY WA 98023 Census Category: 101 -New Single Family House Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V-B Occupancy Load: Floor Area(sq.ft.) 4,646.00 Additional Permit Information New/Additional Sq.Feet-1st Floor 2606 New/Additional Sq.Feet-2nd Floor 2040 New/Additional Sq.Feet-3rd Floor 0 Occupancy#1-Area(Sq.Feet) 4646 New/Additional Sq.Feet-Basement 0 Basic Plan? No Occupancy#1-Construction Type Type V-B New/Additional Sq.Feet-Deck 465 New/Additional Sq.Feet-Garage 662 Mechanical to be Included" Yes Plumbing Work Valuation? 8400 Mechanical Work Valuation? 8000 Number of Stories 2 New/Additional Sq.Feet-Other 114 Plumbing to be Included? Yes New/Additional Sq.Feet-Total 5887 Will Certificate of Occupancy be Issued? Yes Occupancy#1-Use Residence(1 or 2 family) Comprehensive Plan Designation SF-High-Density Zoning Designation RS 9.6 Residential Total Valuation:610,252.67 '• 3 Air Conditioners-Stand Alont 1 Ducting I Furnaces 1 Gas Piping I Gas Pipe Outlets 3 Hot Water Tanks 1 4I. r .,DDrr" " ae.� Bathtubs 1 Dishwashers 1 Laundry Washer Outlets 2 Lavatories 6 Showers 4 Sinks 2 Water Closets 5 Hose Bibbs 4 CONDITIONS: Electric service&Electrical permits by TACOMA POWER. A right-of-way permit is required for work within the public right-of-way for the driveway and culvert. Please contact the right-of-way permit desk at 253-835-2725. I , . . .6 4e, • .0 PERMIT EXPIRES Sunday, 10 November,2019 Permit Issued on Tuesday,May 14,2019 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and - se wit :e in accordance with the laws, rules and regulations of the State of W. ngton and the City of Federal Way. Owner or agent: F II Date: b5' I`i - 1q (./. City of Federal Way 1 Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section R110 of the International Residential Code is certifying that at the time of issuance,this structure was in compliance with the various ordinances of the City regulating building construction or use.This certificate is valid ONLY when endorsed by City staff. Tenant Name: KHARIK Permit# 19-100340-00-SF Address: 35645 9TH AVE SW Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V-B Occupancy Load: Floor Area(sq.ft.) 4,646.00 Owner Name: JENNIFR KHARIK Owner Address: 35809 9TH AVE SW FEDERAL WAY WA 98023 Building Official Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most severely affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible(within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner/occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and/or occupant of the premises. �� 4 ,,.. • , THIS CA5tD IS TO REMAIN ON-SITE Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 19 100340 00 Address: 35645 9TH AVE SW Project: VALENTIN KHARIK FEDERAL WAY WA 98023-7226 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ® SWM Precon Site Mtg(4400) , 0 Initial Erosion Control(4365) ' ® Footings/Setback(4110) Approved To be done PRIOR to breaking ground Approved to place concrete By •- Date ---- By ----- Date By Date IIII ® Foundation Wall(4115) j El Drainage/Downspout(4040) El Plumbing Groundwork(4190) Approved to place concrete PI Approved to backfill Approved to cover • By t Date 5/24 11 BY Date By 1V Date /a, /. Slab/Concrete Floor(4255) 1 ® Underfloor Framing(4285) El Floor Sheathing(4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By`(,LS Date 7 /// By/COS Date O • El Shear Walls(4245) 0 Roof Shea ing(4220) El Rough Plumbing(4230) Approved to install siding Approved to install roofing i Approved .By Date ..ByL/4r S Date ,/S /,' t � By,LV...c Date!Op/l. ED Mechanical Rough-in(4165) 1 Q Gas Piping(4125) ; 1:1 Fire/Draft Stops(4095) Approved t.0 p 51 Approved to release test Approved BY 1W Date 0 2 - By /� Date 12 - tBy 4„,iDate X0131 /g 16 Interim Erosion Control(4370) Prior to scheduling a Framing inspection; EI Framing(4120) ' Approved Electrical,Plumbing&Mechanical Rough-in Approved to insulate and Fire/Dran Stop inspections must be signed- By Date offend approved. IBC 109.3.4 By 4f..) Date 90 1I /- ID Insulation(4150) 0 Gypsum Wallboard Nailing(4130) ® Final Erosion Control(4375) Approved to install wall... d Approved to install mud&ta. A A oved �rt T1c.�sno��°Pr By Date '' I.G dr By ti a Date ' , 14 1 f 1 By _ Date :- D Final-Mechanical(4065) El Final-Plumbing(4075) I 0 Final-Building(4050) Approvedter ��s 1 a Approved D ae ftr` '' oved By Date By t Date . , D I By Date $-ji,, ._ / C Ill& K tt 01P. 64'55 tx p "44. 1k -t), ot� c;,i Rough Electrical E Final ElectricalElRight of Way Approved Approved Approved By Date By Date By Date -S. i t( s r ‘Z.; 4\ s - 4 - ,) , 3 i . ,\-, . 0 o c 1 s.V i. dNIQ \ i\ c i U c. 3 (A, v a' ._ i 6 4i... A PERMIT APPLICATION C'TY OF Federal Way PEMowCENTEM uth+Federal Way,WA 98003-6325 253-835-2607+ 2 pe>mitcentet*itvoffederalway.com JAN 182019 PERMIT NUMBER l 9 - / 0003 D - O D CITY OF E COMMUIFRP WAY 8356yIt 5" 9.'M A V( S 1) Fede#/J1 billy FgOa3 SUITE/UNIT PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL N $ 9 4/ 0 5- 6 O - 0 / 7 O TYPE OF PERMIT )(BUILDING 0 PLUMBING 0 MECHANICAL 0 DEMOLITION 0 ENGINEERING 0 FIRE PREVENTION NAME OF PROJECT K-}{Yt E-‘ 1L V.-ES 5(D r 4CE. B 0 1 PROJECT DESCRIPTION ` i)- r:.)e SFR.. 2,S o?" 9/ ) O0 */- S f'- Detailed description of work to be included on this permit only NAM$ Se�2 t/i C e LL C- PFUMARY P O �V/ Sc'- Cy-// V3 PROPERTY OWNER AT 9e IV( S'w E-MAIL ` Fede 4I cvA y 11,71._ ZN'7sO z N• U0)4 a(Z -En �L)/(�YLY2-__ PHOz_w 60,y //y,3 CONTRACTOR DrierVii 7 A S w X1'53'734- 56 3-7 CITY red * Al STATE tad- ZIP,Prc n 3 FAX WA STATE CONTRACTOR'S LICENSE i EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# / NAME PRIMARY PHO Int- ,.. _nh,,(-cc— v44-` (_• 5-3' ..x3 4 -5l ‘77- APPLICANT 777ltS 4/7�e E✓hTcHko,Xgha :(P M CITYre 1 v ' ' y z„.77. yA ZIP n�`j FAX PROJECT CONTACT NAME no (-ec i(--14.A 'lam G, PRIMARY 53 PHONE '71 (Theindividual to receive andmAnINQB Q 9 7 / cn� respod o all correspondence O719 /C OO ///a7.-Cp, concerning this application) e Aloa1I 4r 7'1, Zn' 9 q 3 FAX NAME GK !� PROJECT FINANCING Al OWNER-FINANCED When value is$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorised agent of the property owner.I certify that to the best of my knowledge,the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorised by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold `•rmless t ity of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in the investigation and de -rise of suc i• m), which may be made by any person, including the undersigned, and filed against the city, but only where such c • arises , • of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied • t - city as • •art of this application. SIGNATURE' - `� ^ DATE 0i /01, aev? PRINTN if e� Khagi'K Bulletin#100-January 29,201 Page 1 of 2 k:\Handouts\Permit Application • VALUE OF MECHANICAL WORK MECHANICAL PERMIT $ goop Indicate how many of each type of fixture to be installed or relocated as part of this project.Do not include existing fixtures to remain. AIR HANDLING UNITSFANS ,; GAS PIPE OUTLETS OTHER(Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS(commercial) BOILERS FURNACES I HOT WATER TANKS(ons) COMPRESSORSt GAS LOG SETS REFRIGERATION SYST DUCTING ( GAS PIPING WOODSTOVES VALUE OF PLUMBING WORK PLUMBING PERMIT $ 3l 160 Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. BATHTUBS(or Mb/Shower Combo) LAVS(Handsinim) 5 TOILETS WATER PIPING I DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe) DRAINS 4 - SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS 2- SINKS((citobon/utility) WATER HEATERS(Electric) HOSE BIBBS SUMPS 2 G WASHING MACHINES z� TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS o 1.4-I1,5 fitTe4.-- $ 5 c' EXISTUIG/PREVIOUS USE LOT SIDE(In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? SFR- _ facco \-2,6190 Yes X No ❑Yes X No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE FIRST FLOOR(or Mobile Home) COVERED ENTRY 1Il "4 S 7 CI GARAGE CARPORT ❑ e 66Z a � x l Area Totals EXISTING PROPOSED TOTAL So ESTIMATED SELLING PRICE$ J�.0� 61 U I #OF BEDROOMS 9 COMMERCIAL-NEW/ADDITION AREA DESCRIPTION Area Occupancy Group(s) Construction Sof Additional Information Square Feet Type Stories ADDITION COMMERCIAL-REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area Occupancy Groups) C• . ruction N of Additional Information Square Feet Type Stories r � uet g .i. ter' TENANT AREA ONLY Bulletin#100—January 29,2016 Page 2 of 2 k:\Handouts\Permit Application r t • RECEIVED 6, Uven 2019 WATER&SEWER DISTRICT (;' FEDF. A.!..WAY C,Cro(.,;ti7)",;)LVI_OPMENT Lakehaven Water & Sewer District - Development Engineering Section 31623 - 1st Ave S * PO Box 4249 • Federal Way, WA 98063-4249 Email: DE@Lakehaven.org * Telephone: 253-945-1581 or 253-945-1580 This certificate is intended to provide the applicant, land use agencies &/or public health departments with information necessary to evaluate development proposals. Lakehaven Water & Sewer District, at its sole discretion, reserves the right to delay, or deny, water service based upon capacity &/or supply limitations in Lakehaven's or Other Purveyor's system facilities. Proposed Land Use: ® Building Permit-SFR(1) 0 Building Permit-MFR() 0 Building Permit-Other 0 Subdivision 0 0 Short Subdivision 0 0 Binding Site Plan ❑ Boundary Line Adjustment 0 Other(specify/describe) Tax Parcel Number(s): 4405600170 Site Address: 35645 -9th Ave SW Lakehaven GIS Grid: G-13 Ex. Bldg. Area to Remain: N/A sf New Bldg. Area Proposed: 5.000 sf WATER SYSTEM INFORMATION 1. Water service can be provided by service connection to an existing service connection (SvcNo 3303) that is connected to an existing diameter water main that is approximately 50+1-feet from the site. 2. 0 Water service for the site will require an improvement to Lakehaven's water distribution system of: O a. feet of "diameter water main to reach the site; and/or ❑ b. The construction of a water distribution system on the site; and/or ❑ c. A major portion of Lakehaven's comprehensive water system plan would need to be implemented and/or constructed; and/or ❑ d. Other(describe): 3. ® a. The existing water system is in conformance with Lakehaven's Comprehensive Water System Plan. ❑ b. The existing water system is not in conformance with Lakehaven's Comprehensive Water System Plan and an Amendment to this Plan will be required.This may cause a delay in issuance of land use approvals or permits. 4. ® a. The subject property is within the corporate limits of Lakehaven Water&Sewer District, or has been granted Boundary Review Board approval for extension of water service outside of Lakehaven's water service area. ❑ b. Annexation or Boundary Review Board approval will be necessary to provide service. 5. Water service is subject to: ® a. Payment of connection charges(to be determined by Lakehaven, for any new/modified service connection); ❑ b. Proof or reservation of easement(s)as required by Lakehaven; O c. Other: The existing 5/8"x3/4"meter should be evaluated under UPC&Lakehaven standards,to determine if it's adeauate for the proposed use. Water Service Connection application required,for any new/modified service connection. Comments/special conditions: The nearest fire hydrant is approximately 115+/-feet from the Property (as marked on map on the back of this page). System hydraulic model results (FF #33, copy attached), at no less than 20 psi, indicate that Lakehaven's standard maximum allowable liquid velocity of 10 ft/s is exceeded at a fire flow rate above 1.100 GPM. This flow figure depicts the theoretical performance of the water distribution system under high demand conditions. Fire flow rates greater than this may be accommodated through water distribution system improvements, contact Lakehaven for additional information. 538 Pressure Zone Est. Meter Elevation(s)-GIS: 354+/- Est. Pressure Range at Meter(s) (psi): 71-79 I hereby certify that the above water system information is true. This certification shall be valid for one (1) year from the date of signature. Name: BRIAN ASBURY Title: DEVELOPMENT ENGINEERING SUPERVISOR // Signature: Date: X79 #: 19-100340-00-SF • ••" S 35645 9th Ave SW *MCI' .A.w Construction 4405600170 wtr.docx(Form Update 12/28/18) . Page 1 of 2 DATE: 01/18/2019 h • 4405800180 V 4405800185 35623 • t 35818 io 111 Ex. . Hydrant -741 4405800175 356 111 ,As*40444:••-- 4405800198 „`.. 35628 Ex. WtrSvc 3393 ,: 5/8'x3/4 Meter s? � ,i, ;Ae`fP:,, 1 4405800202 35842 44056102 35720 4405000170 35645 asp f 4405500201 35654 • 4405800165 4405610 35865 ' 35804 'NTE: Lakehaven Water and sewer Water Certificate of AveIIabiity Pr District nether warrants nor guarartees Parcel a1405600170the accuracy of any facility information an eo provided Facility locations and conditions are subject tofieldvertieation. Feel 1/4/2019 BIA 4405600170 wtr.docx(Form Update 12/28/18) Page 2 of 2 f � FF • LAKEHAVEN UTILITY DISTRICT Hydraulic Model Fire Flow Estimate Request/Reporting Form Requested By: Date: Mary Cossette 04/22/96 Hydrant Location: 1/4 Section: G-13 Intersection: SW. 360th & 8th Ave SW. Add.Description: Check velocities in 6" mains that would be supplying the proposed plat of Silverwood (SW 360th/10th Ave SW) Results By: Date: Model Run No.: • John Bowman 04/22/96 95LUDSFF.INP #33 Condition Pressure (psi) Flow (gpm) Static . 60 0 Fire Flow 20 2200 NOTE: This fire flow rate will cause velocities in excess of 8 f/s within the water distribution system. A fire flow rate less than 1100 gpm will maintain flow velocities below 8 f/s. There is no guarantee that the Hydraulic Model results will represent actual system performance. Model results depict the ' theoretical performance of the system under high demand conditions. Field measurements should always be obtained for design purposes. RECEIVED ♦ Lakehaven JAN 18 2019 WATER&SEWER DISTRICT CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT Lakehaven Water &Sewer District - Development Engineering Section 31623 - 1st Ave S * PO Box 4249 * Federal Way, WA 98063-4249 Telephone: 253-945-1581 or 253-945-1580 * Email: DE@Lakehaven.org This certificate is intended to provide the applicant, land use agencies &/or public health departments with information necessary to evaluate development proposals. Lakehaven Water & Sewer District, at its sole discretion, reserves the right to delay, or deny, sewer service based upon capacity &/or supply limitations in Lakehaven's or Other Purveyor's system facilities. Proposed Land Use: ® Building Permit-SFR(1) 0 Building Permit-MFR() 0 Building Permit-Other 0 Subdivision () 0 Short Subdivision 0 0 Binding Site Plan 0 Boundary Line Adjustment 0 Other(specify/describe) Tax Parcel Number(s): 4405600170 Site Address: 35645- 9th Ave SW Lakehaven GIS Grid: G-13 Ex. Bldg. Area to Remain: N/A sf New Bldg.Area Proposed: 5.000 sf SEWER SYSTEM INFORMATION 1. ® Sewer service can be provided by service connection to an existing 6"diameter sewer service stub that is connected to an existing 8" diameter sewer main that is approximately 31+/ feet from the site and the sewer system has the capacity to serve the proposed land use. 2. 0 Sewer service for the site will require an improvement to Lakehaven's sanitary sewer system of: ❑ a. feet of "diameter sewer main or trunk to reach the site; and/or ❑ b. The construction of a sanitary sewer collection system on the site; and/or ❑ c. A major portion of Lakehaven's comprehensive wastewater system plan would need to be implemented and/or constructed; and/or ❑ d. Other(describe): 3. ® a. The existing sewer system is in conformance with Lakehaven's Comprehensive Wastewater System Plan. ❑ b. The existing sewer system is not in conformance with Lakehaven's Comprehensive Wastewater System Plan and an Amendment to this Plan will be required.This may cause a delay in issuance of land use approvals or permits. 4. ® a. The proposed site land use is within the corporate limits of Lakehaven Water&Sewer District,or has been granted Boundary Review Board approval for extension of sewer service outside of Lakehaven's sewer service area. ❑ b. Annexation or Boundary Review Board approval will be necessary to provide service. 5. Sewer service is subject to: ❑ a. Payment of connection charges(to be determined by Lakehaven); ❑ b. Proof or reservation of easement(s) as required by Lakehaven; • c. Other: Sewer Service Connection Permit required. Comments/special conditions: I hereby certify that the above sewer system information is true. This certification shall be valid for one (1) year from the date of signature. Name: BRIAN ASBURY Title: DEVELOPMENT ENGINEERING SUPERVISOR Signature: 5�v.- y� Date: ! V ! #: 19-100340-00-SF ADDRESS: 35645 9th Ave SW -'EJECT: New Constructipe 4405600170 swr.docx(Form Update 12/28/18) ARIK DATE: /18/2019 Page 1 of 2 h 7 r • 4405000175 s 35627 p. ..k ^F a yp 2 HH 1*0 3' Ex. 6"Server Svc Stub 8' Deep6..,,� .,:;,,,,,,,..77" .".,,I.,*-,'-' t' ro ,.4-----•.::-.-1'-,..?,...:.,-,,,,,, Ca ,,,,,,..t:'-,:v. 4405800/70 z� ,e.:‘,',,,,, ,,„5,,,,J.,z.:;:,, .-",:,:,....,:: 3'5845 v '404,, r p�'v b. r `FVC H� air � � ..„,,,,_„,":„..,4?:,,,,:„. _ - r.,:,,,,..774%iiito:4,,,,,„.,...,,,,... �t a 4405 01655 ? s -' �. 35665 _ = s cc4DTE: Lakehaven Water and Sewer Sewer Certificate of Availability h° District nether warrants nor guarantees Parcel 4405600170 the accuracy of any racily information o 25 dt provided.Facdity locations and con ions WIIIIIIIIINI are subject to field verification_ Fed 1/4/2019 BIA 4405600170 swr.docx (Form Update 12/28/18) Page 2 of 2 11Tinimum Tree Density Requirements for Vacant or Redeveloping Sites (Table 19.120.130-1) _- Land Use Designation Required Tree Unit Densiy ' BC, BN, CE, OP, PO 20 tree units/acre SF Residential zones 25 tree units/acre RM 1800, RM 2400, RM 3600 30 tree units/acre • The following table specifies the tree unit credits established for retained (existing) trees and planting of t Tree Unit Credits (Table 19.120.130-2) Existing Tree Category Tree Unit Credit Existing Tree 1? to 6? d.b.h. 1.0 tree units per tree Eausting Tree >6? to Ir d.b.h. 1.5 tree units per tree Eadsting Tree >12? to 18? d.b.h. 2.0tree units per tree Ddsting Tree >18? to 24? d.b.h. 2.5 tree units per tree Existing Tree > 24? d.b.h. 3.0 tree units per tree Replacement Tree Category Replacement Tree, Small Canopy Species (Mature canopy area < 450 SF) .50 tree units per tree planted Replacement Tree, Medium Canopy Species (Mature canopy area 450 to 1,250 1.0 tree units per tree planted Replacement Tree Large Canopy Species (Mature canopy area> 1,250 SF) 1.5 tree units per tree planted *Refer to City of Federal Way Bulletin #068 for a listing of recommended tree species ......... 0 6'-15' ht. VINE MAPLE ACER CIRCINATUM TREE RETENTION CALC'S: UNITS REQUIRED— 25/ACRE X .35 = 7.25 UNITS PROVIDED— 9 _n THICKNESS NOTES: • PER KING COUNTY ROAD DESIGN AND CONSTRUCTION STANDARDS (KCRDCS), DRIVEWAYS SHALL BE PAVED TO EDGE OF R-O-W PRIOR TO INSTALLATION OF THE CONSTRUCTION ENTRANCE TO AVOID DAMAGING OF THE ROADWAY. • IT IS RECOMMENDED THAT THE ENTRANCE BE CROWNED SO THAT RUNOFF DRAINS OFF THE PAD. 6" 6" 12" INFILTRATION TRENCH PLAN VIEW NTS Q TRENCH SETBACK FROM BUILDING AS REQUIRED, 15' MIN. WASHED ROCK 1 A VARIES SECTION VIEW NTS .tiJ>.' :4a'�^:r:44 S5•iFS: :159 '•:i�..•:i�..•.M t R.- � :Mll GROUNDWATERMIN. TABOVE SEASONAL HIGH SECTIONTABLE, SEE SECTION C.2.2.2 NTS NOTE: BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED DURING CONSTRUCTION AND ALL EXPOSED SOILS SHALL BE COVERED AS SPECIFIED IN THE CONSTRUCTION STANDARDS POST SPACING MAY BE u INCREASED TO 8' IF WIRE BACKING IS USED NOTE: FILTER FABRIC FENCES SHALL BE INSTALLED ALONG CONTOURS WHENEVER POSSIBLE SETBACK SLOPE SURFACE SHALL BE SMOOTH BEFORE FROM PLACEMENT FOR PROPER SOIL CONTACT BUILDING STAPLING PATTERN AS PER 5' MIN. MANUFACTURER'S RECOMMENDATION MIN. 2" OVERLAP 1 HOUSE SPLASHBLOCK DETAIL NTS 2"X2" BY 14 Ga. WIRE OR EQUIVALENT, IF STANDARD STRENGTH FABRIC USED IF THERE IS A BERM AT THE TOP OF SLOPE, ANCHOR UPSLOPE OF THE BERM DO NOT STRETCH BLANKETS/MATTINGS TIGHT -ALLOW THE ROLLS TO MOLD TO ANY IRREGULARITIES LIME, FERTILIZE AND SEED BEFORE FOR SLOPES LESS THAN 3HAV, ROLLS MAY BE PLACED INSTALLATION. PLANTING OF SHRUBS, TREES, IN HORIZONTAL STRIPS ETC. SHOULD OCCUR AFTER INSTALLATION 20.00' 69.50' I 10.50' I 24.65' LEGAL DESCRIPTION: L ORIGAN MANOR ADD E 125 FT LESS S 14 FT Plat Block: 2 Plat Lot: 22 ROOF MID. PT. I r) F n n' 5.0' BSBL _� cry tJ�a�ll h tit? D t 5�£VZ�► ----------------------- — -- ROOF PEAK EL. 385.3' 125.001 F07 BUILDING PROFILE -- SILT FENCE 386 384 382 380 278 376 374 372 270 368 366 364 362 360 358 356 354 2'X2'X10' TRENCH City of Federal Way Building Division APPROVED FOR CONSTRUCTION D ���_ CONSTRUCTION ENTRANCE South King Fire & Rescue Approved �.As Detailed ❑ Subject ttached details By Date CONTRACTOR TO VERIFY LOCATION AND DEPTH OF EXISTING CULVERT ON 9TH AVE SW rA I�PP `30Y-4 /l IPL A r V LOT COVERAGE (STRUCTURES) 12.500 SF. TOTAL LOT AREA 3.285 SF. PROPOSED BUILDING 26.18 % COVERED 1229 SF. DRIVEWAY + WALKWAY 9.79 % COVERED 4,514 SF. INPERVIOUS 35.97 % COVERED SITE ADDRESS: 35645 9th Ave SW FEDERAL WAY, WA 98023 PARCEL 4405600170 RECEIVED JAN 18 2019 URBAN DESIGN GROUP hereby reserves it's common law l copyright and other property rights in these plans, ideas and designs. These ideas, designs and plans are not to be reproduced. changed or copied in any form or I manner whatsoever• nor are they t be assigned to any third party, without first obtaining the express written permission from URBAN DESIGN GROUP. Written dimensions on these shall have precedence over scale dimensions. Contractors shall verify and be responsible for all dimensions and conditions of the job and URBAN DESIGN GROUP must be notified in writting of any variation from the dimensions, conalr ons ana spec�nco uons construction shown by these drawings. All shall be in accordance with the standard building (SBCCI) an state and code. local codes. COPYRIGHT© 2010 URBN! DMOK INC. W V / j 'w (W 1 �/ � a W LL LU /— n V / LU 7 Q� o L = ULU O� Q Ln 0 V LL 0 a 0 Ir E3 n 0 0 0) rn Z /n 19 Z O ui C m N In W z W 0 0 (Oy Q a\ W H C 'E Z Q V)w Z C M Uj a LO C\J 00 Co W Z C) 0 v rn 2 0- DRAWN BY: AVA DATE ISSUED: 01/10/18 MODIFIED BY: AVA ENGINEER: UDG REVISION 0 REVISION Project No.: 18170 SHEET c IOF I CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT n > m n o p A m A n M ~ -1 N Xk �Zw— ; D(D a e f 7, H 10 S g 2>b QQ O ' (n T