10-101496 J
Building - Single Family
City of Federal Way
Community Development Services Permit #: 10-101496-00-SF
P.O.Box 9718
Federal Way,WA 98063-9718 Inspection Request Line: 253
Ph:(253)835-2607 Fax (253)835-2609 p q ( ) 835-3050
Project Name: MCDONALD
Project Address: 29903 9TH PL S Parcel Number: 515160 0075
Project Description: REP-Tear off existing composition shingles and replace with new composition shingles.
Tear off parts of rotted sheathing,
Owner Applicant Contractor Lender
KEITH J MCDONALD SOUND ROOFING SYSTEMS SOUND ROOFING SYSTEMS
29903 9TH PL S 823 SW 152ND ST SOUNDRS962NO(9/24/11)
FEDERAL WAY WA BURIEN WA 98166 823 SW 152ND ST
98003-3748 BURIEN WA 98166
Census Category: 555 -Non-structural roofing permits
Includes: #1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area(sq. ft.) 0 0 0 0
New/Additional Sq.Feet-3rd Floor 0 New/Additional Sq.Feet-Basement 0
Mechanical to be Included? No Plumbing to be Included? No
'_. a ; This Pert ,,
PERMIT EXPIRES Monday, October 11, 2010
Permit Issued on Wednesday, April 14, 2010
I hereby certify that the above info mation is correct and that the construction on the above described property and
the occupancy ant e us I b in accordance with the laws, rules and regulations of the State of Washington
- and the City of Federal Way.
Owner or agent: Y`,; Date: ti/vhe,
'4 5 4, 1) 36. 9
THIS CARD IS TO REMAIN ON-SITE
CITY OF 0111 ' Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 10-101496-00-SF Address: 29903 9TH PL S
Owner: KEITH J MCDONALD FEDERAL WAY, WA 98003-3748
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El SWM Precon Site Mtg(4400) 0 Initial Erosion Control(4365) ElUnderfloor Framing(4285)
Approved To be done prior to breaking ground Approved to sheath floor
By Date By Date By Date
El Floor Sheathing(4105) 0 Shear Walls (4245) El Roof Sheathing(4220)
Approved to install flooring Approved to install siding Approved to install roofing
By Date By Date By c_ Dateer_457/0 I
❑ Fire/Draft Stops(4095) ❑ Interim Erosion Control (4370) Prior to scheduling a Framing inspection;
Approved Approved Electrical,Plumbing&Mechanical Rough-in and
Fire/Draft Stop inspections must be signed-off and
By Date By Date
approved. IBC 109.3.4
El Framing(4120) ❑ Insulation (4150) 0 Gypsum Wallboard Nailing (4130)
Approved to insulate Approved to install wallboard Approved to install mud&tape
By Date By Date By Date
El Final Erosion Control (4375) 0 Final-Building(4050)
Approved Approved
By Date By Date
❑ Rough Electrical ® Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date