Loading...
21-100244-SU-02-25-20 Preapplication Review Comments-01-25-2021-V1CITY OF ram. Federal Way Centered on Opportunity February 25, 2020 Mr. Paul Green Azure Green Consultants 409 East Pioneer Puyallup, WA 98372 haul Cc rnailaac.com Re: File #19-105814-PC, PREAPPLICATION CONFERENCE SUMMARY 6th Avenue Subdivision, Parcel #302104-9041, Federal Way Dear Mr. Green: CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www. cityoffederalway.. com Jim Ferrell, Mayor Thank you for participating in the preapplication conference with the City of Federal Way's Development Review Committee (DRC) held January 16, 2020. We hope that the information discussed at that meeting was helpful in understanding the general requirements for your project as submitted. This letter summarizes comments given to you at the meeting by the members of the DRC. The members who reviewed your project and provided comments include staff from the city's Planning and Building Divisions, Public Works Department, and representatives from Lakehaven Water and Sewer District and South King Fire and Rescue. Some sections of the Federal Way Revised Code (FWRC) and relevant information handouts are enclosed with this letter. Please be advised, this letter does not represent all applicable codes. In preparing your formal application, please refer to the complete FWRC and other relevant codes for all additional requirements that may apply to your project. I, Natalie Kamieniecki, am the key contact for your project. I may be contacted at 253-835-2638, or lie.kamieriie i ffe eralwa . For specific technical questions about your project, please contact the appropriate DRC representative as listed below. Otherwise, any general questions about the preapplication and permitting process can be referred to me. PROJECT DESCRIPTION The proposal is to subdivide one parcel into 11 single-family detached lots. MAJOR ISSUES Outlined below is a summary of the major issues of your project based on the plans and information submitted for preapplication review. These issues can change due to modifications and revisions in the plans. The major issues section is only provided as a means to highlight critical requirements or issues. Please be sure to read the comments made by all departments in the following section of this letter. Mr. Paul Green Page 2 of 12 February 25, 2020 Planning 1. Lot sizes must be revised to reflect the minimum lot size standards per FWRC 19.05.120. The area of a vehicular access easement, private tract, flagpole, or access panhandle is not included in the minimum lot calculation. • Public Works Traffic Division 1. T haniporlation G'vncrmitncy iUfunaBemew (M1' RC 19.90) — A transportation concurrency permit with the application fee ❑f,;`5,086 is required for the proposed project. 2. Traffic Impact Fees (FWRC 19.91) — Traffic impact fees will be assessed for each residential dwelling unit at the building permit issuance stage. 3. Frontage Improvements (FWRC 19.135.040) — Construct street improvements and dedicate right-of-way along the property frontage on 6th Avenue SW and SW 366th Street. DEPARTMENT COMMENTS Outlined below are the comments made by the representatives of each department present at the preapplication conference. Each section should be read thoroughly. If you have questions, please contact the representative listed for that section. COMMUNITY DEVELOPMENT — PLANNING DIVISION Natalie Kamieniecki, 253-835-2638, natalie.kamieniecki@cityoffederalway.com 1. Zoning Designation and Density — The site is zoned RS-15.0 (Single -Family Medium -Density Residential, one unit/15,000 square feet.). Lots in the RS 15.0 zone must be a minimum lot size of 15,000 square feet. Per FWRC 19.05.120, lot area means the minimum lot area per dwelling unit based on the underlying zone. For single-family lots, the area of a vehicular access easement, private tract, flagpole, or access panhandle shall not be credited in calculation of the minimum lot area. 2. Review Process — A subdivision of ten or more lots and/or tracts requires review and public hearing on the preliminary plat application by the city's Hearing Examiner. In summary, following application submittal, the city will review the application for completeness and technical comments. The first procedural decision point is the State Environmental Policy Act (SEPA) review and determination. Following conclusion of the SEPA review, city staff will present the staff report and recommendation on the preliminary plat to the Hearing Examiner, who then makes the final decision on the preliminary plat application. The Hearing Examiner's written decision on the preliminary plat is based on the applicant satisfying criteria pursuant to FWRC 18.35.170(3). The decision of the Hearing Examiner may be appealed pursuant to FWRC 18.35.210. After the final decision on the preliminary plat, engineering plans must be submitted and reviewed by the city's Public Works Department. Following review and approval of engineering plans, construction of plat infrastructure may begin. Substantial completion of plat improvements is required prior to final plat review and decision by the City Council as described below. 3. State Environmental Policy Act (SEPA) — The proposed subdivision is not categorically exempt from environmental review pursuant to Washington Administrative Code (WAC) 197-11-800, and is subject to a threshold determination. A completed environmental checklist must be submitted with the Master Land 19-105814-00-PC e Doc 1D:80040 Mr. Paul Green Page 3 of 12 February 25, 2020 Use application. A thoroughly completed checklist that gives comprehensive answers to each item will expedite the review process. The public, government agencies, and tribes will be invited to comment on the checklist during a 14-day comment period. An environmental threshold determination made by the director must be rendered prior to public hearing on the preliminary plat application. 4. Application / Review.Fees — Contact staff at the Permit Center at City Hall (253-835-2607 or perme.tcent c,citoffederalwa �.co n)to inquire about application fees in place at the time of application submittal. Also, any third -party reviews by city consultants for review and assistance with geologically hazardous and wetland/stream consultants must be pre -funded and paid by the applicant. 5. Environmentally Critical Areas— The project is in proximity to erosion hazard areas and wetland and fish and wildlife critical area indicators. The application must include a report confirming the presence or absence of regulated critical areas on site. If regulated critical areas are present on site, appropriate critical area studies standards of FWRC 19.145.080 and necessary permitting applications related to each critical area feature are applicable to the preliminary plat. Any third -party reviews by city consultants for review and assistance with geologically hazardous and wetland stream consultants must be pre -funded and paid by the applicant. 6. Public Notice — The preliminary plat and SEPA review require a notice of application. The applicant will be responsible for supplying a map and list of all properties within 300 feet of the subject property. Three sets of stamped mailing envelopes for each property owner with the department's return address must accompany the map and list. The applicant will also be required to pay for and post city supplied large notice boards at the appropriate times. 7. Design Criteria and Improvements — Subdivisions are subject to the subdivision design and improvements criteria set forth in FWRC Chapters 18.55 and 18.60, respectively. It is the responsibility of the applicant to identify how the proposed subdivision meets applicable design and improvements criteria and is therefore, entitled to the land division. 8. Miscellaneous Residential Regulations — a) Maximum height of structures is 30 feet above average building elevation. b) Setbacks for structures are minimum 20-foot front yard and 5-foot side and rear. c) Maximum lot coverage is 50 percent. d) Required parking spaces are a minimum of two per dwelling unit. e) Driveway and/or parking pad may not be closer than five feet to any side property line. 9. Open Space — All residential subdivisions are required to provide open space in the amount of 15 percent of the gross land area of the subdivision site per FWRC 18.55.060(2). A minimum of 10 percent of the open space is required to be usable open space, i.e. appropriate for active recreation areas. Additionally, any onsite open space must be set aside in a tract and owned in common undivided interest by all property owners within the subdivision. All or some of the open space requirement may be satisfied by a fee -in -lieu payment at the discretion of the city's Parks Director, after consideration of the city's overall park plan, quality, location, and service area of the open space that would otherwise be provided with the Doc ID:80040 19-105514-00-PC Mr. Paul Green Page 4 of 12 February 25, 2020 project. The fee in lieu of open space is calculated on 15 percent of the most recent assessed land value of the property. If the fee -in -lieu option is chosen, a written request to Parks Director John Hutton is required. A copy of this request is a required component of the preliminary plat application. Usable open space design size and location options, along with provisions for access, improvements, ownership, and maintenance, will be reviewed in conjunction the with review of the preliminary plat. Critical areas and buffers, conservation tracts, slopes, storm pond tracts, etc. do not qualify as usable open space. Typically, a narrow (three to five -foot -wide) landscape buffer strip is required between streets and above ground stormwater facilities, and may be counted toward the buffer open space. Please consult FWRC 18.55.060 for specific open space requirements that apply to the proposal. 10. Forest Practices — A Forest Practices Class IV -General Application is required if more than 5,000 board feet of merchantable timber will be harvested from the property in conjunction with the development activity. The city will review the proposed Class IV -General Forest Practices in conjunction with SEPA review, and review of associated development permits or approvals. 11. Tree Retention/Replacement— The city's tree standards require each development/redevelopment to maintain a tree unit density. The minimum tree density requirements for RS zones are 25 tree units per acre. The required density for the subject property will be determined by multiplying the gross site acreage, minus streets and critical areas, by 25. A tree retention plan detailing how the subject property will meet tree unit density requirements shall be submitted with the preliminary plat application. Items required to be included in the plan are itemized in FWRC 19.120.040(2)(a) through (e). The table below identifies tree unit values for retained and replacement trees. FWRC 19.120.130(2) — Tree Unit Credits Retained Trees Tree Unit Credit Existing Tree 1" to 6" d.b.h. 1.0 Existing Tree > 6" to 12" d.b.h. 1.5 Existing Tree > 12" to 18" d.b.h. 2.0 Existing Tree > 18" to 24" d.b.h. 2.5 Existing Tree > 24" d.b.h. 3.0 Replacement Trees Replacement Tree - Small (Mature canopy area < 450 SF) .50 Replacement Tree - Medium (Mature canopy area 450 to 1,250 SF) 1.0 [Replacement Tree - Large (Mature canopy area > 1,250 SF) 1.5 19-105814-00-PC Doc ID:80040 Mr. Paul Green Page 5 of 12 February 25, 2020 12. Clearing & Grading — With the preliminary plat application, a clearing and grading plan addressing items listed in FWRC 19.120.040(l)(a) through �) is required. Prior to beginning clearing and grading activities, all critical areas and buffers and trees/vegetation that are to be preserved within and adjacent to the construction area shall be clearly marked and protected per guidelines prescribed within FWRC 19.120.160. Any retaining walls and rockeries can be a maximum of six feet in height and must comply with standards in FWRC 19,120.120. Preliminary designs for retaining walls shall be submitted with the preliminary plat application, and include cross sections, and visual depictions of retaining walls. 13. Tacoma Smelter Plume— The subject property is located in the Tacoma Smelter Plume detect area; containing 20.1 ppm to 40.0 ppm arsenic and lead concentration. Please contact Technical Assistance Coordinator Eva Barber, Department of Ecology, at E .Barbe ec .wa. ov, or 360-407-7094, regarding the Voluntary Soil Clean -Up Program. Additional information on the smelter plume testing and cleanup requirements can be found at: http:l/wkno.ccy.wa.gov/.programs/tcp/sites brochureltacomi smelter 2011 ts-hp.htm. The city will require soil testing and soil cleanup (if applicable) as a component of the preliminary plat and SEPA applications, review, and site development. The applicant shall provide preliminary soil testing data in compliance with Washington State Department of Ecology guidelines with the preliminary plat application. 14. School Access Analysis — A school access analysis is required to be submitted to the city with the plat application, to assure that safe walking routes to schools or bus stops are provided as required by RCW 58.17. If there are not safe and adequate walking routes available, walking route improvements may be required as part of the plat review process. Contact Tanya Nascimento, Federal Way Public Schools, at 253-945-2071 for information about the school access analysis requirements. 15. Exploratory Site Reconnaissance Work — Please provide city staff written notice before any site reconnaissance work occurs. If any geotechnical exploration, boring work, or any work in critical areas is to occur, this activity must be approved by city staff prior to this work as identified in FWRC 19.145.120(2). 16. Approval Duration — Per FWRC 18.35.220, preliminary plat approval shall expire five years from the date of hearing examiner approval, unless the applicant requests an extension as provided in FWRC 18.05.090. 17. Einal Plat — The final plat fee, in effect at the time of the final plat application, and items identified in FWRC 18.40.020, are required to process the final plat. Substantial completion of the plat infrastructure must occur prior to submittal and processing of the final plat application. The city allows bonding of only minor improvements. The City Council will act on the plat and upon approval, the final plat drawing will be recorded with the King County Recorder's Office. 18. Recording — Following substantial completion of subdivision improvements and City Council review of the final plat, the plat will be recorded the with the King County Recorder's Office. The applicant is responsible for the plat recording fees. Prior to recording the plat, all surveying and monumentation must be complete. In addition, all other required improvements must be substantially completed as determined by the departments of Community Development and Public Works. 19-105514-00-PC Doc ID:80040 Mr. Paul Green Page 6 of 12 February 25, 2020 PUBLIC WORKS — DEVELOPMENT SERVICES DIVISION Ann Dower, 253-835-2732, ann.dower@cityoffederalway.com Land Use Issues — Stormwater 1. Surface water runoff control and water quality treatment will be required per the 2016 King County Surface Water Design Manual (KCSWDM). This project meets the requirements for a Full Drainage Review. At the time of preliminary short plat submittal, a preliminary Technical Information Report (TIR), addressing the relevance of the project to the nine core and five special requirements of the KCSWDM will be required. A Level 1 downstream analysis shall also be provided in the preliminary TIR. The city has 1" _ 100', five-foot contour planimetric maps in GIS format that may be used for basin analysis. 2. The project lies within a conservation flow control area; thus, the applicant must design the flow control facility to meet this performance criteria. In addition to flow control facilities, Best Management Practices (BMP's) are required as outlined in the KCSWDM. The project also lies within an Enhanced Basic Water Quality Area. Water quality treatment shall be designed to meet the treatment criteria of the Enhanced Basic Water Quality Menu. 3. If infiltration is proposed, soil logs prepared by a licensed geotechnical engineer or septic designer must be provided to verify infiltration suitability. 4. Detention and water quality facilities for short plats and subdivisions must be above ground (i.e. open pond). Underground facilities are allowed only with approval from the City of Federal Way Public Works Department. Storm facilities for subdivisions must be set aside in a separate tract for dedication to the city. Short plat storm facilities remain private. 5. Show the proposed location and dimensions of the detention and water quality facilities on the preliminary plans. 6. If more than one acre will be disturbed during construction, a National Pollutant Discharge Elimination System (NPDES) construction storm water permit may be required. Information regarding this permit can be obtained from the Washington State Department of Ecology at 360-407-6048, or littp://� ecywa go, v/.programs/%vci/stormw,iter/construction/index.litinI. 7. If work is to be done below the ordinary high-water mark, a Hydraulic Project Approval (HPA) permit may be required. Information regarding this permit can be obtained from the Washington Department of Fish and Wildlife. Right -of -Way Improvements 1. See the Traffic Division comments from Senior Transportation Planning Engineer Sarady Long for traffic related items. 2. Dedication of additional right-of-way is required to install street frontage improvements. The dedication shall be conveyed to the city through a statutory warranty deed. The dedicated area must have clear title prior to recording. 19-105814-00-PC Doc ID:80040 Mr. Paul Green Page 7 of 12 February 25, 2020 3. All stormwater treatment and detention requirements outlined above may apply to any improvements within the public right-of-way. 4. FWRC Section 19.135.280 requires that driveways serving residential uses may not be located closer than 25 feet to any street intersection. Lots and intersections within new subdivisions or short plats must be designed to meet this standard. Building (or EN) Permit Issues 1. Engineered plans are required for clearing, grading, road construction, and utility work. Plans must be reviewed and approved by the city. Engineering review fees are $2,098.00 for the first 12 hours of review, and $172.00 per hour for additional review time. A final TIR shall be prepared for the project and submitted with the engineering plans. Both the TIR and the plans will require the signature/seal of a professional engineer registered/licensed in the State of Washington. 2. In addition to engineering approval, projects that will be filling or grading in the area of the future building pads are required to obtain a separate grading permit from the Building Division. 3. to assist the applicant's engineer in preparing the plans and TIR, the Federal Way Public Works Development Standards Manual (including standard detail drawings, standard notes, and engineering checklists) is available on the city's website at htt : w�ciwoEfedualway.com/index..Rs[2\?nid--:-; 17 1. 4. Bonding is required for all street improvements and temporary erosion and sediment control measures associated with the project. The bond amount shall be 120 percent of the estimated costs of the improvements. An administrative fee deposit will need to accompany the bond to cover any possible legal fees in the event the bond must be called. Upon completion of the installation of the improvements, and final approval of the Public Works Inspector, the bond will be reduced to 30 percent of the original amount and held for a two-year maintenance period. The developer will be responsible for the maintenance of all storm drainage facilities (including the detention and water quality facilities) and street systems during the two-year maintenance period. During that time, the Public Works Inspector will make periodic visits to the site to ensure the developer's compliance with the maintenance requirements. Upon satisfactory completion of the two-year maintenance period, the remainder of the bond will be released. Maintenance for public roads and subdivision drainage facilities then become the responsibility of the City. Maintenance for private roads and drainage facilities, including short plats, remain the responsibility of the individual property owners. 6. When topographic survey information is shown on the plans, the vertical datum block shall include the phrase "DATUM: N.G.V.D.-29" or "DATUM: K.C.A.S.," on all sheets where vertical elevations are called out. 7. Drawings submitted for plan review shall be printed on 24" x 36" or 22" x 34" paper. Site plans shall be drawn at a scale of 1" = 20', or larger. Architectural scales are not permitted on engineering plans. S. Provide cut and fill quantities on the clearing and grading plan. 9. Temporary Erosion and Sediment Control (TESC) measures, per Appendix D of the 2016 KCSWDM, must be shown on the engineering plans. 19-105814-00-PC Doc ID:80040 Mr. Paul Green Page 8of12 February 25, 2020 10. The site plan shall show the location of any existing and proposed utilities in the areas affected by construction. PUBLIC WORKS — TRAFFIC DIVISION Sarady Long, 253-835-2743, sarady.longod eityoffederalway.com} Transportation Concurrency Analysis (FWRC 19.90) 1. Based on the submitted materials for two Single Family Detached Housing, and the Institute of Transportation Engineers (ITE) Trip Generation - 10th Edition, land use code 210 (Single Family Detached Housing), the proposed project is estimated to generate approximately 12 new weekday PM peak hour trips and 136 daily trips. 2. A concurrency permit is required for this development project. The PW Traffic Division will perform a concurrency analysis to determine if adequate roadway capacity exists during the weekday PM peak period to accommodate the proposed development. Please note that supplemental transportation analysis and concurrency mitigation may be required if the proposed project creates an impact not anticipated in the six -year Transportation Improvement Plan (TIP). 3. The estimated fee for the concurrency permit application is $5,086 (11 — 50 PM trips). This fee is an estimate and based on the materials submitted for the preapplication meeting. The concurrency application fee must be paid in full at the time the concurrency permit application is submitted with the land use application. The fee may change based on the new weekday PM peak hour trips as identified in the concurrency trip generation. The applicant has the option of having an independent traffic engineer prepare the concurrency analysis consistent with city procedures; however, the fee remains the same. Transportation Impact Fees (TIF) (FWRC 19.91) Based on the submitted materials for one new single-family lot, the estimate traffic impact fee is $46,800. The total amount of the impact fees will be assessed and collected from the applicant when the building permit is issued, using the fee schedule then in effect. The applicant may request, at any time prior to building issuance, to defer the payment of the impact fee to final building inspection. If this option is selected, a covenant prepared by the city to enforce payment of the deferred fees will be recorded at the applicant's expense on each lot. Please refer to the defer payment of impact fee code for process. Street Frontage Improvements (FWRC 19.135) The applicant/owner will be expected to construct street improvements consistent with the planned roadway cross -sections as shown in Map III-4 in Chapter III of the Federal Way Comprehensive Plan (FWCP) and Capital Improvement Program (CIP) shown as Table III-10 (FWRC 19.135,040). Based on the materials submitted, staff conducted a limited analysis to determine the required street improvements. The applicant will be expected to construct improvements on the following streets to the city's planned roadway cross -sections: ■ Sixth Avenue SW is classified as a Minor Collector and planned as a Type "T" street, consisting of a 28-foot street, 8-foot ditch, 5-foot sidewalk, and street lights in 60-foot right-of-way. Assuming a 19-105814-00-PC Doc ID:80040 Mr, Paul Green Page 9 of 12 February 25, 2020 symmetrical cross section, half street improvements are required as measured from the street centerline. It appears the existing right-of-way will be adequate to accommodate the improvement. 0 Southwest 3661h Street is a planned as a Type "T" street, consisting of a 28-foot street 8-foot ditch, 5- foot sidewalks and street lights in a 60-foot right-of-way. Assuming a symmetrical cross section, half street improvements and a 30-foot right-of-way dedication are required as measured from the street centerline. At a minimum, the improvement shall include a 20-foot minimum paved surface. Alternatively, the applicant may the required improvement to match the cross-section to the east, which is a Type "S" street consisting of a 36-foot street with curb and gutter, 4-foot planter strip with street trees, 5-foot sidewalks, and street lights in a 60-foot right-of-way. 2. The applicant may make a written request to the Public Works Director to modify, defer, or waive the required street improvements (FWRC 19.135.070). Information about right-of-way modification requests are available through ,the Public Works Development Services Division. These modification requests have a nominal review fee currently at $344, plus the recording fee. 3. Tapers and transitions beyond the project frontage may be required as deemed necessary for safety purposes. The taper rate shall be WS2/60, or as directed by the Public Works Director. Access Management (FWRC 19.135) 1. Access management standards are based on roadway safety and capacity requirements. FWRC 19.135.280 provides access standards for streets based on planned roadway cross -sections. Please note that access classifications are per Drawing 3-1A in the Public Works Development Standards. 2. All lots shall be accessed by a public street right-of-way (FWRC 18.55.020). In certain cases, lots may be accessed by an ingress/egress and utilities easement or alley, subject to the requirements established in the City of Federal Way public works development standards. 3. The proposed private streets should be consolidated to provide one Type `V" street with a cul-de-sac bulb. 4. No street, or combination of streets, shall function as a cul-de-sac longer than 600 feet (FWRC 18.55.010). LAKEHAVEN WATER AND SEWER DISTRICT Brian Asbury, 253-946-5407, BAsbury@iakehaven.org Water 9 A Water Certificate of Availability issued separately by Lakehaven may be required to be submitted with any land use and/or building permit applications (check with land use agency for requirement). The certificate is valid for one year from the date of issuance. If a certificate is needed, allow one to two working days to issue for typical processing. The 2020 cost for a Water Certificate of Availability is $80.00. • Hydraulic model results from a nearby location indicate that Lakehaven's standard maximum allowable system liquid velocity of 10 square feet, at no less than 20 psi, is exceeded at a fire flow rate above 3,400 GPM (for two hours or more). This flow figure depicts the calculated performance of the existing water distribution system under high demand conditions. Fire flow rates greater than available in the existing 19-105814-00-1'C Doc ID:80040 Mr. Paul Green Page 10 of 12 February 25, 2020 distribution system may be accommodated through water distribution system improvements. Onsite hydraulic system calculations may need to be determined during design of the onsite water distribution system improvements. Please contact Lakehaven for further detail. • Typically, a water service connection stub would need to be installed for each proposed new lot, prior to subdivision recording. • A water service connection application submitted separately to Lakehaven is required for each new service connection to the water distribution system, in accordance with standards defined in Lakehaven's current "Fees and Charges Resolution." • Based on the proposal submitted, preliminary estimated Lakehaven water service connection fees, charges, and/or deposits (2020 schedule) will be as follows. Actual connection charges will be determined upon submittal of service connection application(s) to Lakehaven. Connection charges are separate from any DE fees/charges/deposits and are due at the time of the application for service. All Lakehaven fees, charges, and deposits are typically reviewed and adjusted (if necessary) annually, and are subject to change without notice. • Water Service/Meter Installation, 1" preliminary meter size: ,$5,480.00 deposit. Actual size to be determined by Lakehaven based on UPC plumbing fixture count (or greater of UPC vs. fire -protection system demand, where applicable). • Capital Facilities Charge(s)-Water: ,$4,503.95 per Equivalent Residential Units (ERU). Water system capacity credits are available for this property from system capacity charges previously assessed, paid directly to Lakehaven, and/or credited to the property for 1.00 ERU. Please contact Lakehaven for further detail. Sewer • A Sewer Certificate of Availability issued separately by Lakehaven may be required to be submitted with any land use and/or building permit applications (check with land use agency for requirement). the certificate is valid for one year from the date of issuance. If a certificate is needed, allow one to two working days to issue for typical processing. The 2020 cost for a Sewer Certificate of Availability is ,$80.00. A Lakehaven Developer Extension (DE) Agreement will be required to construct new and/or abandon and/or modify existing sanitary sewer system facilities necessary for the proposed development, including extend -to -far -edge (southwest required, not required to extend to northeast edge) in accordance with long- standing Lakehaven policy. Additional detail and/or design requirements can be obtained from Lakehaven by completing and submitting a separate application to Lakehaven for either a Developer Pre -Design Meeting or a Developer Extension Agreement. Lakehaven encourages owners/developers/applicants to apply for Lakehaven processes separately to Lakehaven, and sufficiently early in the pre-design/planning phase to avoid delays in overall project development. • A separate Lakehaven Sewer Service Connection Permit is required for each new connection to the sanitary sewer system, in accordance with standards defined in Lakehaven's current "Fees and Charges Resolution." This property is in a low-pressure sewer basin, meaning each lot will have its own separate private grinder pump (E/One or Keen). • The associated DE Agreement must achieve a point of either Substantial Completion or Acceptance, as determined by Lakehaven, prior to activating any new sewer service connection(s). 19-10581 J-00-PC Doc ID:80040 Mr. Paul Green Page 11 of 12 February 25, 2020 0 Based on the proposal submitted, preliminary estimated Lakehaven sewer service connection fees, charges, and/or deposits (2020 schedule) will be as follows. Actual connection charges will be determined upon submittal of service connection application(s) to Lakehaven. Connection charges are separate from any DE fees/charges/deposits. and are due at the time of application for service. All Lakehaven fees, charges, and deposits are typically reviewed and adjusted (if necessary) annually, and are subject to change without notice. • Sewer Service Connection Permit: $517.20 fee (per lot). • Capital Facilities Charge(s)-Sewer: $4,297.07 per Equivalent Residential Units (ERU). • Service Agreement Charge (Private Grinder Pump Agreement): $140.00 (per lot). • County Document Recording Fees: $109.50 (per lot). General • All Lakehaven development engineering related application forms, and associated standards information, can be accessed at Lakehaven's web pages: littp://,,v\v,,v.lakehavcn.org/204/Development-F,nginceritig. • All comments herein are valid for one year and are based on the proposal(s) submitted and Lakehaven's current regulations and policies. Any change to either the development proposal(s) or Lakehaven's regulations and policies may affect the above comments accordingly. SOUTH KING FIRE AND RESCUE Chris Cahan, 253-946-7243, Chris Cahan@southldngCre.org Water Supply A Certificate of WaterAvadability, including a hydraulicfire flow model* shall be requested from the water district and provided at the time of the building permit application. *A hydiwdr fm flow model is required for single-family residences that exceed 3600 square feet, including garages and covered areas. Fire Hydrants Every building lot shall have a fire hydrant within 350 feet. All measurements shall be made as vehicular travel distance. Exisffigre hydrants are .rrfcient for this project. Fire hydrants shall be in service prior to and during construction. Emergency Access Fire apparatus access roads shall comply with all requirements of Fire Access Policy 10.006: llgp.//Isvu hkiiigfire.org/DocamctitCc,nter/Home/Viv 3 • Angles of approach, departure, and minimum ground clearance. Fire Sprinkler System An NFPA 13D fire sprinkler system is required in the structures constructed on lots 5, 6, 9, and 10. 19-105814-00-PC Doc ] D:80040 Mr. Paul Green Page 12 of 12 February 25, 2020 An automatic fire sprinkler system shall be installed in Group R, Division 3 occupancies: 1) Without adequate fire flow. 2) Without approved fire department access. Determination of requirements for residential fire sprinklers, if any, are made at the time of the building permit application. CLOSING This letter reflects the information provided at the preapplication meeting and is intended to assist you in preparing plans and materials for a formal application. We hope you found the comments useful to your project. We have made every effort to identify major issues to eliminate surprises during the city's review of the formal application. The completion of the preapphcation process in the content of this letter does not vest any future project application. Comments in this letter are only valid for one year as per FWRC 19.40.070(4). As you know, this is a preliminary review only and does not take the place of the full review that will follow submission of a formal application. Comments provided in this letter are based on preapplication materials submitted. Modifications and revisions to the project as presented for this preapplication may influence and modify information regarding development requirements outlined above. In addition to this preapplication letter, please examine the complete FWRC and other relevant codes carefully. Requirements that are found in the codes that are not addressed in this letter are still required for your project. If you have questions about an individual comment, please contact the appropriate department representative noted above. Any general questions can be directed towards me, the key project contact, Natalie Kamieniecki, at 253-835-2638, or natalie.kamie.iiieclsi rt citvoffederalwa_y.cpra. We look forward to working with you. Sincerely, t Natalie Kamieniecki Associate Planner Enclosures c: Ann Dower, Senior Engineering Plans Examiner Sarady Long, Senior Transportation Planning Engineer Chris Cahan, South King Fire and Rescue Brian Ashbury, Lakehaven Water and Sewer District Jim Job, "m Let) ma n c, o 19-105814-00-Pc Doc ID:80040