Loading...
21-100244-SU-Geotech Report-01-25-2021-V1GEOTECHNICAL REPORT South Campus Estates SW 366th Street and 6th Avenue SW Federal Way, Washington Project No. T-8347 Terra Associates, Inc. ,♦ 4 Prepared for: Entitle Fund Two, LLC Puyallup, Washington November 12, 2020 TERRA ASSOCIATES, Inc. Consultants in Geotechnical Engineering, Geology and Environmental Earth Sciences November 12, 2020 Project No. T-8347 Mr. Geoffrey P. Sherwin Entitle Fund Two, LLC P.O. Box 188 Puyallup, Washington 98371 Subject: Geotechnical Report South Campus Estates SW 366th Street and 6th Avenue SW Federal Way, Washington Dear Mr. Sherwin: As requested, we conducted a geotechnical engineering study for the subject project. The attached report presents our findings and recommendations for the geotechnical aspects of project design and construction. In general, the soils at the site consist of six to eight inches of topsoil or forest duff overlying medium dense to dense becoming very dense weathered and unweathered horizons of glacial till soils. No groundwater seepage was observed during excavation of the site's test pits. In our opinion, there are no geotechnical conditions that would preclude the planned residential development. Buildings can be supported on conventional spread footings bearing on competent native soils or on structural fill placed on competent native soils. Floor slabs and pavements can be similarly supported. Detailed recommendations addressing these issues and other geotechnical design considerations are presented in the attached report. We trust the information presented is sufficient for your current needs. If you have any questions or require additional information, please call. Sincerely yours, TERRA ASSOCIATES, INC. k 1 S a E 11-12-2020 •ey. S�', ,PE�w j0NA 12220 113th Avenue NE, Ste. 130, Kirkland, Washington 98034 Phone (425) 821-7777 ■ Fax (425) 821-4334