20-104621 I
Mechanical
City of Federal Way Permit #:20-104621-00-ME
Community Development Dept. FILE
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax(253)835-2609
Project Name: WINDOM
Project Address: 4417 SW 323RD ST Parcel Number:873202 0520
Project Description: gas piping,mechanical
Owner Applicant Contractor
JOAN G WINDOM CHRISTINE PHILLIPSEast Hill Heating& EAST HILL HEATING&COOLING
4417 SW 323RD ST Cooling (MECHANICAL)
FEDERAL WAY,WA 98023 8114-E 8114-144TH AVENUE ST EASTHHC980LC(7/22/22
PUYALLUP WA 98372 8114 114TH AVE E
PUYALLUP WA 98372
Additional Permit Information
Mechanical Work Valuation? 7800.00 Is this an Online or O.T.C.application? Yes
ash r amu. 4 ,moi R? „ 3a% r.� i�. .a a
X33 �y 3yf 3 ,n3�3 y� 3 �a �' Y .. ,. =m f'lfl��' ;;r `y. `�
,.Y. ;.,.1HN �_N v.:. ?
Furnaces 1 Gas Piping 1 Hot Water Tanks 1
PERMIT EXPIRES Sunday,23 May,2021
Permit Issued on Tuesday,November 24,2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: '�" Date:
c)NLIN
THIS CARD IS TO REMAIN ON-SITE
�rn� 4 Construction Inspection Record
Federal Way INSPECTION REQUESTS:(253)835-3050
PERMIT#: 20 104621 00 Address: 4417 SW 323RD ST
Project: PAUSTIAN KIMB WINDOM FEDERAL WAY WA 98023-2422
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
D Mechanical Rough-in(4165) ® Gas Piping(4125) ® Final-Mechanical(4065)
Approved Approved to release test Approved
.By Date .'\By Date i�^�) aoag By
•
•
0 Rough Electrical 0 Final Electrical 0 Right of Way
Approved Approved Approved
By Date By Date By Date