Loading...
21-100995 , Y :'K a Mechani�al :- CiryofFederalWay PCPIYII� f'�:21-100995-00-ME Co�nmuniry Development Dept. 33325 8th Ave S � ' � � Inspection Request Line: (253)835-3050 Federal Way,WA 98003 Ph:(253)8352607 Fax:(253)835-2609 Project Name: DUNSTAN Project Address: 32416 18TH AVE SW Parcel Number:010454 0030 Project Description: Replace gas furnace like in kind Owner Applicant Contractor CHRISTINA K DUNSTAN SARAH TURNERGLENDALE HEATING& GLENDALE HEATING&A/C(GENERAL 3241618TH AVE SW �C 01) FEDERAL WAY WA 98023 12462 DES MOINES WAY S GLENDHA053Q2(11/2/21) SEATTLE WA 98168-2266 I2462 DES MOINES MEMORIAL DR SEATTLE WA 98168-2266 Additional Permit Information Mechanical Work Valuation?.................................. 4000 Is this an Online or O.T.C.application?..................1'es '; �����, ,' ; ��� ��� �� �� 3 t ; ����ltl�"� ,�<� � ._ �� �& ;� >�� �,. u . �.. , �� . , , ;:':, �� � _� � ,. _. � .. �.. �� �__. . . Furnaces 1 PERMIT EXPIRES Saturday, l l September,2021 Permit Issued on Monday,March 15,2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ���� th �f Federal Way. Owner or agent: Date: ���. � , �� THIS CARD IS TO REMAIN ON-SITE �m�F �� Constructi n Ins i n R Federal Wa o �ect o ecord y INSPECTION REQUE TS:(253)835-3050 PERMIT#: 21 100995 00 Address: 32416 18TH AVE SW Project: ERIK R DiJNSTAN FEDERAL WAY WA 98023-5442 Scheduled inspections may be failed if this card is not on-site. DO IYOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you ar+e unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) 0 Gas Piping(4125) Q Final-Mechanical(4065) Approved Approved to release test Approved � 9-� By Date By Date By � Date ,�� � � Rough Electrical � Final Electrical � Right of Way Approved Approved Approved By Date By Date By Date