20-104680City of Federal Way
Community Development Dept.
33325 8th Ave S
FILE
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: SANTACRUZ
Project Address: 3608 SW 325TH ST
Project Description: GAS FURNACE REPLACEMENT
Owner Applicant
KRISTINA SANTACRUZ RACHAEL AILSHIEPACIFIC HEATING &
3608 SW 325TH ST COOLING
FEDERAL WAY WA 98023 8607 DURANGO ST SW
LAKEWOOD WA 98499
Additional Permit Information
Is this an Online or O.T.C. application?..... ........ - Yes
Electrical Fixtures
Thermostat 1
Electrical
Permit #:20-104680-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 873190 1720
Contractor
PACIFIC AIR SYSTEMS (ELECTRICAL
02)
PACIFAS853LB (6/2/21)
12811 PACIFIC HWY S
LAKEWOOD WA 98023
PERMIT EXPIRES Wednesday, 1 December, 2021
Permit Issued on Tuesday, December 1, 2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the DtNILMof Federal Way.
Owner or agent: 0Date-
raa, )
CITY OF A�'
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 20 104680 00 Address:
Project: JAMES STEVE SANTACRUZ
3608 SW 325TH ST
FEDERAL WAY WA 98023-2610
Scheduled
inspections may be failed if this card is not on -site.
DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read
left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you
are unsure about any of the inspections or the inspection sequence. On -going inspections
are logged on the back of this card.
El
UFER Ground (4295) Q
Ditch cover (4030)
❑ Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date By
Date
By Date
❑
Pool Bonding (4195) LJ
Temporary Power (4275)
❑ Service (4235)
Approved
Approved
Approved
By
Date By
Date
By Date
❑
Feeders/Sub-panels (4045) ❑
Rough Electrical (4225)
❑ Ceiling Cover (4020)
Approved
Approved
Approved
By
Date By
Date
By Date
E`'
Final - Electrical (4055)
BY
Date
❑ Rough Electrical ❑ Final Electrical ❑ Right of Way
Approved Approved Approved
By Date Date By Date