21-100191City of Federal Way
Community Development Dep6
SAve 5
Federalal Way, WA 98003
FILE
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: HOWARD
Project Address: 31005 39TH AVE SW
Project Description: Install 240v circuit for outdoor HVAC Unit
Owner Applicant
JEREMY HOWARD SCOTT MANNINGSKYLINE ELECTRIC
31005 39TH PL SW SERVICES LLC
FEDERALWAY WA 98023 PO BOX 7357
TACOMA WA 98417
Additional Permit Information
Is this an Online or O.T.C. application? ................. Yes
Electrical Fixtures
Circuits - Residential 1
Electrical
Permit #:21-100191-00-EL
Inspection Request Line: (253) 835-3050
Parcef Number: 758200 0140
Contractor
SKYLINE ELECTRIC SERVICES LLC
SKYLIES872D6 (3/29/21)
627 S HAWTHORNE ST
TACOMA WA 98465
PERMIT EXPIRES Thursday, 20 January, 2022
Permit Issued on Wednesday, January 20, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: �.�_r Date:
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 21 100191 00 Address:
Project: KIMBERLY R HOWARD
31005 39TH AVE SW
FEDERAL WAY WA 98023-2179
Scheduled inspections may be failed if this card is not on -site.
DO NOT LASE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be_ covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections
are logged on the back of this card.
Q. UFER Ground (4295) ❑
Ditch cover (4030)
❑ Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By Date By
Date
By Date
❑ Pool Bonding (4195) ❑
Temporary Power (4275)
❑ Service (4235)
Approved
Approved
Approved
By Date By
Date
By Date
❑ Feeders/Sub-panels (4045) ❑
Rough Electrical (4225)
❑ Ceiling Cover (4020)
Approved
Approved
Approved
By Date ABy - Date � By Date
Et: Final - Electrical (4055)
Approved
By Date
❑ Rough Electrical ❑ Final Electrical ❑ Right of Way
Approved Approved Approved
E3� Date Ely Date liv Date