20-101231 - Final Permit2i
L
City of Federal Way
Community Development Dept,
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Building - Single Family
Permit #:20-101231-00-SF
Inspection Request Line: (253) 835-3050
Project Name: CHOI
Project Address: 32907 42ND AVE S Parcel Number: 618141 0062
Project Description: ***BLUEBEAM ELECTRONIC REVIEW***
Construct a new ramp in front of house, demo partition wall, convert existing bathroom and
walk-in closet to a bedroom, new door and window. No plumbing or Mechanical included.
Owner Applicant Contractor Lender
LUDIA CHOI JOSEPH MIRAFLORJ V M JOSEPH MIRAFLORJ V M OWNER IS LENDER
32907 42ND AVE S CONSTRUCTION CONSTRUCTION
FEDERAL WAY WA 98001
11211 74TH AVE E l 121 1 74TH AVE E
USA
PUYALLUP WA 98373 PUYALLUP WA 98373
Census Category: 434 - Residential alt/add - no change in number of units
Includes: 1 2 3 4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area (sq. ft.)
Additional Permit Information
Mechanical to be Included? .................................... No Plumbing Work Valuation?..................................... 0
Mechanical Work Valuation? .................................. 0 Number of Stories.,................................................. I
Is this an Online or O.T.C. application? .................. No Plumbing to be Included?........................................ No
Total Valuation: 10,000.00
No Fixtures Associated With This Permit 11
PERMIT EXPIRES Tuesday, 13 October, 2020
Permit Issued on Thursday, April 16, 2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use ill;arcardance with the laws, rules and regulations of the State of
h g • n al d City of Federal Way. Vthe
Owner or agent: Date
As
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 20 101231 00 Address: 32907 42ND AVE S
Project: LUDIA HYUNJIN CHOI FEDERAL WAY WA
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE TII IS CARD. Inspections are listed as close to sequential order as possible
read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
SWNI Precon Site Mtg (4400) Initial Erosion Control (4365) ® Underfloor Framing (4285)
Approved To be done PRIOR to breaking ground Approved to sheath floor
By Date By Date By Date
Floor Sheathing (4105) Shear Walls (4245) Roof Sheathing (4220)
Approved to install flooring Approved to install siding Approved to install rooting
By Date By Date By Date
Fire/Draft Stops (4095) Interim Erosion Control (4370) rior to scheduling a Framing inspection;
Approved Approved ctrical, Plumbing & Mechanical Rough -inCa:ndFire/Draft Stop inspections must be signed -
By Date By Date
off and approved. IBC 109.3.4
Framing (4120) Insulation (4150) Gypsum Wallboard Nailing (4130)
Approved to insulate Apprpvad to install wallboard A[ vc t install nwd 2t I.Ipl'
By Date By Date By Date
Final Erosion Control (4375) is Final - Building (4050)
Approved
Rex- ^
Approved
w a„
By Date By Date R -19 . Qb
Rough Electrical Final Electrical Right of Way
Approved Approved IBY Approved
By Date By Date Date