Loading...
20-101231 - Final Permit2i L City of Federal Way Community Development Dept, 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Building - Single Family Permit #:20-101231-00-SF Inspection Request Line: (253) 835-3050 Project Name: CHOI Project Address: 32907 42ND AVE S Parcel Number: 618141 0062 Project Description: ***BLUEBEAM ELECTRONIC REVIEW*** Construct a new ramp in front of house, demo partition wall, convert existing bathroom and walk-in closet to a bedroom, new door and window. No plumbing or Mechanical included. Owner Applicant Contractor Lender LUDIA CHOI JOSEPH MIRAFLORJ V M JOSEPH MIRAFLORJ V M OWNER IS LENDER 32907 42ND AVE S CONSTRUCTION CONSTRUCTION FEDERAL WAY WA 98001 11211 74TH AVE E l 121 1 74TH AVE E USA PUYALLUP WA 98373 PUYALLUP WA 98373 Census Category: 434 - Residential alt/add - no change in number of units Includes: 1 2 3 4 Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) Additional Permit Information Mechanical to be Included? .................................... No Plumbing Work Valuation?..................................... 0 Mechanical Work Valuation? .................................. 0 Number of Stories.,................................................. I Is this an Online or O.T.C. application? .................. No Plumbing to be Included?........................................ No Total Valuation: 10,000.00 No Fixtures Associated With This Permit 11 PERMIT EXPIRES Tuesday, 13 October, 2020 Permit Issued on Thursday, April 16, 2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use ill;arcardance with the laws, rules and regulations of the State of h g • n al d City of Federal Way. Vthe Owner or agent: Date As CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 20 101231 00 Address: 32907 42ND AVE S Project: LUDIA HYUNJIN CHOI FEDERAL WAY WA Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE TII IS CARD. Inspections are listed as close to sequential order as possible read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. SWNI Precon Site Mtg (4400) Initial Erosion Control (4365) ® Underfloor Framing (4285) Approved To be done PRIOR to breaking ground Approved to sheath floor By Date By Date By Date Floor Sheathing (4105) Shear Walls (4245) Roof Sheathing (4220) Approved to install flooring Approved to install siding Approved to install rooting By Date By Date By Date Fire/Draft Stops (4095) Interim Erosion Control (4370) rior to scheduling a Framing inspection; Approved Approved ctrical, Plumbing & Mechanical Rough -inCa:ndFire/Draft Stop inspections must be signed - By Date By Date off and approved. IBC 109.3.4 Framing (4120) Insulation (4150) Gypsum Wallboard Nailing (4130) Approved to insulate Apprpvad to install wallboard A[ vc t install nwd 2t I.Ipl' By Date By Date By Date Final Erosion Control (4375) is Final - Building (4050) Approved Rex- ^ Approved w a„ By Date By Date R -19 . Qb Rough Electrical Final Electrical Right of Way Approved Approved IBY Approved By Date By Date Date