Loading...
20-101530-PERMIT FINALBuilding - Commercial City of Federal Way Permit #.20-101530-00-CO Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) B35-2609 Project Name: CHAMBER OF COMMERCE LOBBY Project Address: 31919 1ST AVE S Parcel Number: 072104 9133 Project Description: ***BLUEBEAM ELECTRONIC REVIEW*** Emergency repair of lobby floor damaged by falling man -lift. Owner Applicant Contractor Lender OMNI PROPERTIES RYAN COVINGTONOAK HILLS OAK HILLS CONSTRUCTION OWNER IS LENDER 33926 9TH AVE S CONSTRUCTION 901 ALGONA BLVD N SUITE A FEDERAL WAY WA 98003 901 ALGONA BLVD N SUITE A ALGONA WA 98001 ALGONA WA 98001 Census Category: 437 - Commercial alt / add / conversion Includes: Occu anc Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) 1 #2 #3 #4 Additional Permit Information Mechanical to be Included? ..................................... No Is this an Online or O.T.C. application? .................. No Plumbing to be Included?... .... ------ ....... No Total Valuation: 15,000.00 Number of Stories .................................... 2 Permit for Building Shell Only' ............................. No No Fixtures Associated With This Permit 11 CONDITIONS: Fire inspection is NOT required. PERMIT EXPIRES Tuesday, 13 October, 2020 Permit Issued on Thursday, April 16, 2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the raW4 I in ance with the laws, rules and regulations of the State of gto ! the City of Federal Way. Owner or agent: Date: THIS CARD IS TY O 'REMAIN ON -SITE ` CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 20 101530 00 Address: 31919 1ST AVE S Unit 202 Project: OMNI PROPERTIES FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD, Inspections are listed as close to sequential order as possible read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q initial Erosion Control (4365) Footings/Setback (4110) 0 Foundation Wall (4115) To be done PRIOR to breaking ground Approved to place concrete Approved to place concrete By Date By Date By Date a Drainage/Downspout (4040) Re -steel (4215) Approved to backfill Approved to place concrete or grout By Date By Date Underfloor Framing (4285) Floor Sheathing (4105) Approved to sheath floor Approved to install flooring By Date By Date F1°1 Roof Sheathing (4220) El Fire/Draft Stops (4095) Approved to install roofing Approved By Date By Date El Gypsum Wallboard Nailing (4130) t~ Suspended Ceiling Grid (4265) Approved to install mud &tape P A ppplwed to drop tile M 6-0 all By Date By Date El Final Erosion Control (4375) Final - Building (4050) Approved q,:?f Approved By Date By T Date 6.40QL Slab/Concrete Floor (4255) Approved to place concrete By Date Shear Walls (4245) Approved to install siding By Date Interim Erosion Control (4370) Approved By Date E t Final - S K F& R (4060) Approved By Date Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date