Loading...
20-101886-PERMIT FINALA V City of Federal way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: BABCOCK Project Address: 4021 SW 321ST ST Project Description: ***BLUEBEAM ELECTRONIC REVIEW*** Foundation repair. Owner MARALYN C BABCOCK 4021 SW 321ST ST FEDERAL WAY WA 98023 Applicant BARBARA STASIAKR & R FOUNDATION SPECIALIST LLC 3409 MCDOUGALL AVE SUITE 20, EVERETT WA 98201 Building - Single Family Permit #:20-101886-00-SF Inspection Request Line: (253) 835-3050 Contractor R & R FOUNDATION SPECIALISTS 3409 MCDOUGALL AVE SUITE EVERETT WA 98201 Parcel Number: 873190 2310 Census Category: 434 - Residential alt/add - no change in number of units I onrlar Includes: 1 2 43 4 occupancy Class: Construction Type: Occupancy Load: Floor Area (so. ft.) Additional Permit Information Mechanical to be included?..... No Is this an Online or O.T.C. application? .................. No Plumbing to be Included? ....................................... No Total Valuation: 23,025.00 No Fixtures Associated With This Permit It PERMIT EXPIRES Monday, 23 November, 2020 Permit Issued on Wednesday, May 27, 2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of 5ttE a City of Federal Way. Owner or agent: Hate; A4%, CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 20 101886 00 Address: 4021 SW 321ST ST Projeet: MARALYN C BABCOCK FEDERAL WAY WA 98023-2413 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. inspections are listed as close to sequential order as possible read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. El SWM Precon Site Mtg (4400) Initial Erosion Control (4365) Footings/Setback (4110) Approved To be done PRIOR to breaking ground T a ) proved to place concrete L By Date By Date By L—W Date Underfloor Framing (4285) Floor Sheathing (4105) Shear Walls (4245) Approved to sheath floor By Date Roof Sheathing (4220) Approved to install roofing By Date Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed - off and approved. IBC 109.3.4 E] Gypsum Wallboard Nailing (4130) Approved to install mud & tape By Date Approved to install flooring By Date El Fire/Draft Stops (4095) Approved By Date Framing (4120) Approved to insulate By Date El Final Erosion Control (4375) Approved By Date Approved to install siding By Date Interim Erosion Control (4370) Approved By Date El Insulation (4150) Approved to install wallboard By Date t] Final - Building (4050) Tdr h,mali Approved By L.IA) S Date 7_) i • e?L Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date