20-101377-Twin Lakes Village Plans-03-26-2020-V1A.RIOS
TWIN LAKES
08/13/2018WELLS FARGO BANKTWIN LAKES SHOPPING CENTER2300 SW 336TH STFEDERAL WAY, WA 98023WELLS FARGO BANK ATM - TWIN LAKES SHOPPING CENTER
SHEET SCHEDULEVICINITY MAP
PROJECT TEAM
PARCEL MAP PROPOSED RENDERING
ABBREVIATIONS
SYMBOL LEGEND
N
N
PROJECT OVERVIEW
SQ SQUARE
CLR CLEAR
HDR HEADER
H.S.B.
INT, INTR
HORIZ, (H)
LONGIT
JST(S)
LB, #
COL
CONC
CONN.
CONST
DIA, Ø
DIAG
DLT
DBL
CSK
CONT
DWG
HGT
JNT
MAX
M.B.
LG
DIAMETER
DIAGONAL
DEEP LEG TRAC
CONCRETE
CONNECTION
COLUMN
CONSTRUCTION
DOUBLE
CONTINUOUS
COUNTERSINK
DRAWING
STGRD
STIFF
STRUC
STL
STRUCT, STR
T.O.C.
T.O.F.
T.O.S.
T.O.
T&B
THD
LONGITUDINAL
MAXIMUM
MACHINE BOLT
HIGH STRENGTH BOLTS
HORIZONTAL
INTERIOR
HEIGHT
JOIST(S)
LONG
POUND
JOINT
TOP OF CONCRETE
TOP OF FOOTING
TOP OF STEEL
TOP OF
STIFFENER
STEEL
STRUCTURAL
STAGGERED
STRUCTURE
THREAD
TOP & BOTTOM
(E), EXIST
EMBED
EL, ELEV
EXT, EXTR
F.O.C.
FRMG
GALV
EA
A.B.ANCHOR BOLT
BLW, BEL
BTWN, BET
BLDG
A.F.F.
ALT
AGL
ABV
BLK'G
BLKD
B.O.
B.O.W.
BM
BRG
BOT.
C.I.P.
C.J.
C=
C/L
E.W.
E.S.
E.F.
BUILDING
ABOVE FINISHED FLOOR
ALTERNATE
ANGLE
ABOVE FIN
FLG
FLR
FND
F.O.
F.P.
GA
FTG
GRD
BLOCKING
BELOW
BLOCKED
CONSTRUCTION JOINT
BEARING
BETWEEN
BOTTOM OF
BOTTOM
BOTTOM OF WALL
CAMBER
CAST IN PLACE
BEAM
CENTER LINE
@
&
DWL
AT
AND
NEW(N)
EACH
O.H.
O.C.
OPEN'G
SPCG
SCHED
S.O.G.
SMS
SIM
EACH WAY
ELEVATION (DATUM)
EACH SIDE
EMBEDMENT
EACH FACE
FACE OF CONCRETE
FULL PENETRATION
EXTERIOR
FINISH
FLANGE
FOUNDATION
FACE OF
GALVANIZED
FLOOR
FRAMING
GAGE
FOOTING
GRADE
REMOVE
PLATE
OPENING
PIECE
OPPOSITE HAND
ON CENTER
RELOCATED
REFER TO
REMOVE & RELOCATE
SPACING
ROOF
SCHEDULE
SIMILAR
REQUIRED
REQUIREMENTS
SHEET METAL SCREW
SLAB ON GRADE
REINFORCING
(R)
PC
P/L, PLT
(RE)
RE:
REQM'TS
REQ'D
REINF
RF
(R/R)
NIC
MIN
EXISTING
DOWEL
NOT IN CONTRACT
MINIMUM
STRUCTURAL TUBING,TS
UNLESS NOTED OTHERWISE
WITHOUT
WITH
TYPICAL
VERTICAL
(TUBE STEEL)
W/O
VERT, (V)
U.N.O.
W/
TYP
WEIGHT
WORK POINT
WELDED HEADED STUD
WATER RESISTANT
WELDED WIRE
FABRIC
WOOD SCREW
W.P.
WHS
W/R
W.W.F.
WT, WGT
W.S.
TRANSVERSETRANS
T.O.W.TOP OF WALL
P.T.PRESSURE TREATED
OVEROVR, O/
FINISH FACEF.F., F/F
FINISH FACE OFF.F.O.
PROJECT DATA
SCOPE OF WORK
JOB:
DRAWN:
SCALE:
DATE:
REV 960 E Discovery Lane, Anaheim, CA 92801Phone (714) 956-2827 Fax (714) 956-8157)4172+0%KNOWLEDGE QUALITY EXPERIENCEOF
NOTED
A0.0
8PROJECT DETAILSGENERAL NOTES-5JGGV(KNG5>9'..5(#4)1$#0->Ä9($Ä#NOCFGP2NC\C>Ä'0)+0''4+0)>5WTXG[>#UUGUUQTU2CTEGN/CRRFH/KUUKPIQTKPXCNKFTGHGTGPEG
FEDERAL WAY, WA 98023
2300 SW 336TH ST
PROJECT ADDRESS
C
PROPERTY TYPE
CODES
2015 International Building Code
2015 International Residential Code
2015 International Mechanical Code
2015 International Fire Code
2015 Uniform Plumbing Code
2015 Washington State Energy Code
National Electrical Code (NEC) Amendments
BN
ZONING
154,341 Sq.Ft. / 3.54 Ac
LAND Sq.Ft. / ACRES
SE-13-21-3
QUARTER-SECTION-TOWNSHIP-RANGE
LEGAL DESCRIPTION
132103-9097
PARCEL NUMBER
LOT 3 TGW POR LOT 2 BEG SW COR OF SE 1/4 TH N 00-57-39 E 42 FT TAP ON NLY LN OF
SW 336TH ST TH S 88-46-50 E 1035.82 FT TO TPOB TH N 00-58-28 E 169.27 FT TH S 88-47-49
E 250 FT TH N 00-58-28 E 118 FT TH N 88-47-49 W 690 FT TH S 00-58-28 W 240 FT TH S
89-01-32 E 19.0 FT TH S 00-58-28 W 47.22 FT TH S 88-46-50 E 421.0 FT TO POB OF SD LOT 3
KCSP-1178051-R REC # 8501140624 SD PLAT DAF - POR OF SE 1/4 BEG SW COR OF SE 1/4
TH N 00-57-39 E 42 FT TAP ON NLY LN SW 336TH ST & TPOB TH CONT N 00-57-39 E 286.97
FT TH S 88-47-49 E 1285.89 FT TAP ON WLY LN 21ST AVE SW TH S 00-58-28 W ALG SD WLY
LN 262.23 FT TH ON CRV TO RGT RAD 25 FT THRU C/A OF 90-14-42 ARC DIST OF 39.38 FT
TAP ON NLY LN SW 336TH ST TH N 88-46-50 W ALG SD NLY LN 1260.72 FT TO TPOB - AKA
LOT B KC-LLA 8606007 APPROVED 6-4-86 - LESS POR FOR RD
ANAHEIM, CA 92801
714.956.2827
960 E DISCOVERY LANE
CIM GROUP, INC.
GENERAL CONTRACTOR
TL FKC AU LLC
OWNER
525 MARKET STREET
SAN FRANCISCO, CA 94105
21ST FLOOR
WELLS FARGO BANK
PROJECT PROPONENT
TWIN LAKES VILLAGE
PO BOX 997
SNOQUALMIE, WA 98065-0997
·
·
·
·
·
·
·
·
·
·
·
INSTALL ATM WITH NEW ATM KIOSK AND ASSOCIATED WORK.
VB
CONSTRUCTION TYPE
EXISTING RENDERING
U
OCCUPANCY CLASSIFICATION
RECEIVED
CITY OF FEDERAL WAY
COMMUNITY DEVELOPMENT
Mar 26 2020
20-101377-Twin Lakes Village Plans-03-26-2020-V1
A.RIOS
TWIN LAKES
08/13/2018WELLS FARGO BANKTWIN LAKES SHOPPING CENTER2300 SW 336TH STFEDERAL WAY, WA 98023ONLYEXITONLYENTERB
A2.1
A
A2.1
27'4'-7"2'-5"
3'-4"
17'-318"35'-4916"93'-3"SITE PLAN
SCALE: 1"=30'-0"
JOB:
DRAWN:
SCALE:
DATE:
REV 960 E Discovery Lane, Anaheim, CA 92801Phone (714) 956-2827 Fax (714) 956-8157)4172+0%KNOWLEDGE QUALITY EXPERIENCEOF
NOTED
A1.0
8SITE PLAN--N
PARKING DATA
FOOTAGE
33,829
CALCULATION
4/1000 (SECTION 17.27.020)
SPACES
142 (137+5 ADA)
SPACES
159 (153+6 ADA)
BUILDING SQUARE PARKING REQUIRED EXISTING
SPACES
148 (142+6 ADA)
PROPOSED
PROPOSED SITE CONDITIONS MEET THE PARKING REQUIREMENTS (+6 SPACES)
RECEIVED
CITY OF FEDERAL WAY
COMMUNITY DEVELOPMENT
Mar 26 2020
20-101377-Twin Lakes Village Plans-03-26-2020-V1