Loading...
20-102187-PERMIT FINALMechanical City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: FRITO LAY Project Address: 33930 9TH AVE S Permit 9:20-102187-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 926480 0120 Project Description: ***BLUEBEAM ELECTRONIC REVIEW*** Replace (3) package units, (1) split system and (2) unit heaters; add (1) ERV. Owner Applicant Contractor ROLLING FRITO-LAY SALES LP CHRIS TAYLORFIVE STAR MECHANICAL FIVE STAR MECHANICAL (GENERAL) 7701 LEGACY DR MD4 A-3 7509 GRANGE ST W FIVESM*010JT (5/I/20) PLANO TX 75024-4099 LAKEWOOD WA 98499 7509 GRANGE ST W LAKEWOOD WA 98499 Additional Permit Information Mechanical Work Valuation? .......................,. 60000 Is this an Online or O.T.C. application?.................. No Mechanical Fixtures Air Handling Units 3 Furnaces PERMIT EXPIRES Tuesday, 15 December, 2020 Permit Issued on Thursday, June 18, 2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Wasl,irlytan and thq City of Federal Way. Owner or agent: (date Construction THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Ins @ction Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 2010218700 Address: 33930 9TH AVE S Project: ROLLING FRITO-LAY SALES LP FEDERAL WAY WA 98003-6708 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. l Mechanical Rough -in (4165) Gas Piping (4125) Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date Rough Electrical I EI Final Electrical Right of Way Approved Approved Approved By Date By Date By Date