Loading...
21-100986Mechanical City of Federal Way E Permit #:21-100986-00-ME Community Development Dept. 33325 8th Ave S Ins ection Re uest Line: 253 835-3050 Y Federal Way, WA 98003 FIL p q Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: ZISTATSIS Project Address: 34722 31ST CT SW Parcel Number: 279150 0370 Project Description: REPLACING GAS WATER HEATER LIKE IN KIND. Owner MICHAEL ZISTATSIS 34722 31ST CT SW FEDERAL WAY WA 98023 Applicant KAREN MATHENEYWASHINGTON ENERGY SERVICES CO 3909 196TH ST SW LYNNWOOD WA 98036 Contractor WASHINGTON ENERGY SERVICES CO (GENERAL) WASHIES85INS (9/7/21) 3909 196TH ST SW LYNNWOOD WA 98036 Additional Permit Information Mechanical Work Valuation?. ............... .............. 1700 Is this an Online or O.T.C. application?.................. Yes Hot Water Tanks Mechanical Fixtures PERMIT EXPIRES Wednesday, 8 September, 2021 Permit Issued on Friday, March 12, 2021 1 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of 0 RLNF= the City of Federal Way, 9 Owner or agent: Date: -1:k CITY OF Federal Way THIS CARD 1S TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQU E TS: (253) 835-3050 PERMIT #: 21 100986 00 Address: 34722 31ST CT SW Project: MICHAEL ZISTATSIS FEDERAL WAY WA 98023-3000 Scheduled inspections maybe failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ® Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By AfJ Date ❑ Rough Electrical ❑ Final Electrical Right of Way Approved Approved I Approved By Date By Date By Date