Loading...
20-104181City of Federal Way Applicant Contractor Community Development Dept ALEX BURKHARTEVERGREEN EVERGREEN REFRIGERATION LLC 33325 8th Ave S Federal Way, WA 98003Ph: 11-4 �I (253) 835-2607 Fax: (253) 835-2609 727 S KENYON ST Project Name: FINCH/ROSE Project Address: 31534 39TH AVE SW Project Description: install heat pump Mechanical Permit #:20 -104181 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 873198 1810 Owner Applicant Contractor TIM FINCH ALEX BURKHARTEVERGREEN EVERGREEN REFRIGERATION LLC 31534 39TH AVE SW REFRIGERATION (GENERAL) FEDERAL WAY WA 98023 727 S KENYON ST EVERGRL954R2 (1/6/22) SEATTLE WA 98108 727 S KENYON ST SEATTLE WA 98108 Additional Permit Information Mechanical Work Valuation? ................................ 11000 Is this an Online or O.T.C. application?.................. Yes Compressors / Heat Pumps Mechanical Fixtures PERMIT EXPIRES Monday, 26 April, 2021 Permit Issued on Wednesday, October 28, 2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of hi tpn a e i Federal Way. Owner or agent: L ,. Date CITY OF Federal Way THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 20 104181 00 Address: 31534 39TH AVE SW Project: LESLIE ROSE FEDERAL WAY WA 98023-2110 Scheduled inspections maybe failed if this card is not on-site. DO NOT LOSE "rms CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ Mechanical Rough -in (4165)❑ Gas Piping (4125) ❑ Final - Mechanical (4065) Approved Approved to release testApproved By Date By Date By/ Date `✓�/ ❑ Rough Electrical ❑ Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date