RES 21-811 - Adopting Revised TIP & ASIP for 2021-26RESOLUTION NO. 21-811
A RESOLUTION of the City of Federal Way, Washington, adopting
an extended and revised Transportation Improvement Program and
Arterial Street Improvement Plan for 2021-26, and directing the same
to be filed with the Washington State Secretary of Transportation and
the Transportation Improvement Board. (Amending Resolution Nos.
91-67, 92-117, 93-155, 94-186, 95-210, 96-236, 97-258, 98-273, 99-299,
00-316, 01-343, 02-365, 03-391, 04-433, 05-451, 06-481, 07-503, 08-732,
09-550, 10-558, 11-609, 12-622, 13-640, 14-666, 15-692, 16-706, 17-721,
18-733,18-738, 19-761, 20-792, and 20-802).
WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 RCW, the Federal
Way City Council adopted an original Transportation Improvement Program ("TIP") on July 23,
1991 (Resolution No. 91-67; and
WHEREAS, the Federal Way City Council updated a TIP annually thereafter; and
WHEREAS, the Federal Way City Council held a public hearing on the TIP on June 15,
2021, in compliance with the requirements of State laws; and
WHEREAS, the City Council has determined current and future City street and arterial
needs, and based upon these findings has prepared a revised and extended TIP and an Arterial
Street Improvement Plan ("ASIP") for the next six calendar years; and
WHEREAS, pursuant to Chapters 35.77 and 47.26 RCW, the City Council is required
annually to revise and adopt an extended TIP and ASIP; and
WHEREAS, the City's SEPA Responsible Official has adopted the Determination of Non -
Significance ("DNS"), Federal Way File 21-101911 - SE, issued for the City's 2022-27 TIP and
ASIP, which includes the extended and revised projects contained in the TIP adopted herein; and
Resolution No. 21-811 Page 1 of 5
WHEREAS, adoption of the City's 2022-27 TIP and ASIP DNS reflects the fact that there
will be no significant adverse environmental impacts as a result of adoption or implementation of
the extended and revised TIP and ASIP adopted herein.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF FEDERAL WAY,
RESOLVES AS FOLLOWS:
Section 1. Program Adopted. The extended and revised Transportation Improvement
Program and Arterial Street Improvement Plan for the City of Federal Way, copies of which are
attached hereto as Exhibits A and B and incorporated herein by this reference, which sets forth the
City's transportation project locations, types of improvements, and the estimated costs thereof, is
hereby approved and adopted for the next six (6) calendar years (2022-27 inclusive).
Section 2. Filing of Program. Pursuant to Chapter 35.77 RCW, the City Clerk is hereby
authorized and directed to file a copy of this Resolution, together with Exhibits A and B, with the
Washington State Secretary of Transportation and the Washington State Transportation
Improvement Board.
Section 3. Severability. If any section, sentence, clause or phrase of this resolution should
be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or
unconstitutionality shall not affect the validity or constitutionality of any other section, sentence,
clause, or phrase of this resolution.
Section 4. Corrections. The City Clerk and the codifiers of this resolution are authorized
to make necessary corrections to this resolution including, but not limited to, the correction of
scrivener/clerical errors, references, resolution numbering, section/subsection numbers and any
references thereto.
Resolution No. 21-811 Page 2 of 5
Section 5. Ratification. Any act consistent with the authority and prior to the effective date
of this resolution is hereby ratified and affirmed.
Section 6. Effective Date. This resolution shall be effective immediately upon passage by
the Federal Way City Council.
RESOLVED BY THE CITY COUNCIL OF THE CITY OF FEDERAL WAY,
WASHINGTON this 15th day of June, 2021.
CITY OF FEDERAL WAY:
JI LL, MAYOR
ATTEST:
S'ftPIkANJE COURTNEY, CC, CITY CLERK
APPROVED AS TO FORM:
J. RYAN CALL, CITY ATTORNEY
FILED WITH THE CITY CLERK: 06/09/2021
PASSED BY THE CITY COUNCIL: 06/15/2021
RESOLUTION NO.: 21-811
Resolution No. 21-811 Page 3 of 5
EXHIBIT A
CITY OF FEDERAL WAY
TRANSPORTATION IMPROVEMENT PLAN (TIP) AND ARTERIAL STREET IMPROVEMENT PLAN - 2022 TO 2027
Map
ROADWAY CAPITAL PROJECTS
Year 2021 Costs in $ thousands
ID**
Location
Description
Previous Years
2021
2022
2023
2024
2025
2026
2027
Total
1a
City Center Access Phase 1 - Environmental
Update environmental documentation for modified access at S 320th St & S 324th St
3,422
500
300
4,222
1b
City Center Access Phase 2 - SB Ramps
Construct all SB 1-5 ramps, extend S 324th Street from 23rd Ave S to 1-5
10,957
2,111
35,336
35,336
83,740
2
SR 99 @ S 373rd St
Install roundabout, median control
350
330
1,410
1,410
3,500
3
SW 320th St @ 47th Ave SW
Install traffic signal
569
569
4
S 312th St @ 28th Ave S
Add SB right -turn lane or construct roundabout
771
771
5
SW 340th St: 37th Ave SW - City Limits
Widen to 5 lanes
210
100
400
500
2,200
3,410
6
21 st Ave S @ S 320th St
Install traffic signal
100
935
1,035
7
S 320th St & 1 st Ave S
Add EBL, WBL, WBR, NBT, SBR; widen to 5 lanes N to 316 or Alternatlive Measure
569
9,891
10,460
8
S 348th St: 9th Ave S - SR 99
Overlay
15
90
1,026
1,131
9
16th Ave S: S 344th St - S 348th St
Add SB auxiliary lane
400
1,600
4,105
6,105
10
Citywide
Implement Adaptive Traffic Control System Phases I & 11
731
1,962
2,693
11
Citywide
Install variable lane use control signs
141
841
982
12
Military Rd S @ S Star Lake Rd
Add EB right -turn lane, sidewalk
200
1,000
1,200
13
SR 509 @ SW 301 st St
Install compact roundabout
150
700
850
14
Citywide
Implement Adaptive Traffic Control System Phase III
200
600
800
15
SR 509 @ 47th Ave SW
Install compact roundabout
850
850
16
Citywide
Horizontal curve improvements
92
432
524
17
SW 320th St: 3rd PI SW - 11 th Ave SW
Overlay
50
1,200
1,250
18
SW 356th St: 4th PI SW - 15th Ave SW
Overlay
50
1,200
1,250
19
SW 340th St: 31st Ave SW - 37th Ave SW
Widen to 5 lanes
500
1,500
4,000
6,000
20
Citywide
Annual overlays
3,000
3,000
3,000
3,000
3,000
3,000
3,000
21,000
21
SR 509 @ 4th Ave S
Install compact roundabout
200
800
1,000
22
City Center
Adaptive Traffic Control System - City Center Stage 2 - Detection upgrades
700
700
23
Citywide
Adaptive Traffic Control System Phase IV; 1 st Ave S
750
750
24
Citywide
Adaptive Traffic Control System Phase V; 21 st Ave SW & SW Campus Dr
1200
1,200
25
Military Rd S: S 320th St - SR 18
Overlay
50
1200
1,250
26
S 356th St: 1st Ave S - SR 99
Widen to 5 lanes, bike lanes, sidewalks
300
300
3000
3000
6,600
27
Citywide
Street Vegetation Management
200
200
200
200
200
200
1,200
28
SW 344th St @ 27th Ave SW
Construct compact roundabout
50
100
560
710
Subtotal Roadway Capital Projects
5,465
11,2001
7,575
8,8161
22,9071
8,521
42,5361
58,732
165,752
Map
NON -MOTORIZED CAPITAL PROJECTS
Year 2021 Costs in $ thousands
ID
Location
Description
Previous Years
2021
2022
2023
2024
2025
2026
2027
Total
29
SW King County Regional Trail Plan
Plan to connect trails to adjacent cities
300
300
30
1 st Ave S: S 292nd St - S 312th St
Shoulder improvements
3,770
3,770
31
Citywide
ADA Retrofits
400
400
400
400
400
400
400
2,800
32
Citywide Pedestrian Safety
Install mid -block crossing treatments or other pedestrian improvements
1,231
320
160
160
320
320
320
2,831
33
Citywide Pedestrian Safety System Improvements
Install mid -block crossing treatments
160
1,080
1,240
34
Citywide RRFB Upgrades
Replace median -mounted RRFB's with mast arm mountings
140
690
830
35
SR 509: SW 312th St - 21 st Ave SW
Install sidewalk and streetlights on south side
200
1,300
1,500
36
Federal Way Transit Center
Pedestrian Access Improvements
100
900
1,000
37
S 312th St: Steel Lake Park - 28th Ave S
Install sidewalk and streetlights on south side
100
650
750
38
Citywide
Implement greenway plan
280
400
680
39a
Pacific Hwy S Trail - 16th Ave S (S 288th St to S 308th St)
Construct multi -use path
200
250
600
2,050
3,650
39b
Pacific Hwy S Trail - 16th Ave S (SR 509 to S 308th St)
Construct multi -use path
300
1,900
2,200
40
SR 509: 9th PI S - 11th PI S
Install sidewalk on south side
100
1,350
1,450
41
S 314th St: PVR Wy S - 23rd Ave S
Add sidewalks and street lights
175
125
125
1,600
1,300
3,325
42a
S 288th St: Military Rd S - 34th Ave S
Restripe to 3 lanes with bike lanes, improve pedestrian facilities
100
900
1,000
42b
S 288th St: 16th Ave S - 34th Ave S
Restripe to 3 lanes with bike lanes, improve pedestrian facilities
100
100
100
2,200
2,500
Subtotal Non -Motorized Capital Projects
1 2,1861
4,2251
2,2051
2,780
8,3001
2,320
2,120
5,140
29,826
Map
STREET LIGHTING CAPITAL PROJECTS
Year 2021 Costs in $ thousands
ID
Location
Description
Previous Years
2021
2022
2023
2024
2025
2026
2027
Total
43
Citywide
LED Retrofits
3,350
160
3,510
Subtotal Street Lighting Capital Projects
3,350
160
0
0
0
0
0
3,510
Resolution No. 21-811 Page 4 of 5
EXIHBIT B
Puget Sound
Dumas
Bay
..,—..-••�• Q' 509
SwDash j
•� �'� SW 320tTF
01 1-*,-
North
'N—
Commencement `\
Bay
\'' ono `.
p�l
\
Is
Poverty
Bay
��a
r
I `
gg� s u
l� L
0
hR I I o e
"1! „ _4 iin
I
Legend
Intersection Improvements
City Center Access - Phase 1
— City Center Access - Phase 2
Corridor Improvement
Non -Motorized Improvement
Overlay Improvement
Original Map Date: April 2021
City of Federal Way,
33325 8th Ave S,
Federal Way, WA 98003
(253) 835-7000
0 0.5 1
v Miles
AkCITY OF
Federal Way
This map is accompanied by no warranties,
and is simply a graphic representation.
Resolution No. 21-811
Page 5 of 5