Loading...
20-101204FILEMechanical City ofFederal Way Permit #:20-101204-00-ME Community Development Dept::: 33325 Sth Ave S Federal Way, Vert 98003 Inspection Request Line: ` (253) 835-3050 Phi (253) 835-2607 Fax: (253) 835-2609 Project Name: SANCHEZ-ARAMBULA; Project Address: 34923 26TH CT'SW Parcel Number: 502945 0620 Project Description: adding a mini split heat pump heating system Owner Applicant Contractor CLAUDIA SANCHEZ-ARUMBULA MIGUEL PAREDES RIGHT TEMP HEATING/COOLING LLC 34923 26TH CT SW 10614 MYERS WAYS RIGHTTH824K5 (5/25/20) FEDERAL WAY WA 98023 SEATTLE WA 98168 106 W MYERS WAY S SEATTLE WA 98168 Air Handling Unils I t,ut[tpt C�iWlo i ncdc rwu1,� i "UAL—V' PERMIT EXPIRES Sunday,13 September, 2020 Permit Issued on Tuesday, March 17, 2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of 014L hin a ity of Federal Way. Owner or agent: Date: THIS CARD IS TO REMAIN ON -SITE CITY OF - Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 20 101204 00 Address: 34923 26TH CT SW Project: RUDY I SANCHEZ CRUZ FEDERAL WAY WA 98023-3047 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q Mechanical Rough -in (4165) El Gas Piping (4125) El Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By () Date Final Electrical Right of Way Rough Electrical Approved Approved Approved By Date By Date By Date