20-101204FILEMechanical
City ofFederal Way Permit #:20-101204-00-ME
Community Development Dept:::
33325 Sth Ave S
Federal Way, Vert 98003 Inspection Request Line: ` (253) 835-3050
Phi (253) 835-2607 Fax: (253) 835-2609
Project Name: SANCHEZ-ARAMBULA;
Project Address: 34923 26TH CT'SW Parcel Number: 502945 0620
Project Description: adding a mini split heat pump heating system
Owner
Applicant
Contractor
CLAUDIA SANCHEZ-ARUMBULA
MIGUEL PAREDES
RIGHT TEMP HEATING/COOLING LLC
34923 26TH CT SW
10614 MYERS WAYS
RIGHTTH824K5 (5/25/20)
FEDERAL WAY WA 98023
SEATTLE WA 98168
106 W MYERS WAY S
SEATTLE WA 98168
Air Handling Unils I t,ut[tpt C�iWlo i ncdc rwu1,� i "UAL—V'
PERMIT EXPIRES Sunday,13 September, 2020
Permit Issued on Tuesday, March 17, 2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
014L
hin a ity of Federal Way.
Owner or agent:
Date:
THIS CARD IS TO REMAIN ON -SITE
CITY OF - Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 20 101204 00 Address: 34923 26TH CT SW
Project: RUDY I SANCHEZ CRUZ FEDERAL WAY WA 98023-3047
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Q Mechanical Rough -in (4165) El Gas Piping (4125) El Final - Mechanical (4065)
Approved Approved to release test Approved
By Date By Date By () Date
Final Electrical
Right of Way
Rough Electrical
Approved
Approved
Approved
By
Date
By
Date
By
Date