Loading...
21-101140Electrical, Cityotredera►w:�y Pe>�rn t #:�-10114a= (=EL Community Development Dept 33325 8th Ave S rILE Federal Way, WA 9s0o, Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: AVANA APARTMENTS, bldg 19, unit 202 Project Address: 2211 S STAR LAKE RD Parcel Number: 720480 0095 Project Description: Remove and replace damaged wall heater and thermostat Owner Applicant Contractor GREYSTAR WORLDWIDE LLC JOSE VILLAGOMEZCascades Cleanup& FULLER ELECTRIC (ELECTRICAL) 800 5TH AVE SUITE 4000 Restoration, Inc. FULLEEf027BK (1/12/22) SEATTLE WA 98104 4001 NE 152ND ST AVE 37107 12TH AVE S SUITE A-5 MARYSVILLE WA 98270 FEDERAL WAY WA 98003 Additional Permit Information ut v. t dppll�auvu. ................ itectrical F>Ixtiirs T' PERMIT EXPIRES Friday, 25 March, 2022 Permit Issued on Thursday, March 25, 2021 ,ertify that the above information is correct and that the construction on the above described property eoccupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Alk CITY OF Federal Way PERMIT #: Project: THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 21 101140 00 Address: 2211 S STAR LAKE RD Bldg 19 GREYSTAR WORLDWIDE LLC FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. UFER Ground (4295) 0 Ditch cover (4030) l Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date El Pool Bonding (4195) 0 Temporary Power (4275) El Service (4235) Approved Approved Approved By Date By Date By Date ® Feeders/Sub-panels (4045) E Rough Electrical (4225) LLJ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date Final - Electrical (4055) Approved By ! Date El Rough Electrical Final Electrical LBoy Right of Way Approved Approved Approved By Date By Date Date