21-101103Mechanical
City of Federal way
Permit #:21-101103-00-ME
Community Development Dept. ism L E
33 325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: LONG
Project Address: 1595 SW 301ST ST Parcel Number: 515320 0307
Project Description: INSTALLING FURNACE AND HEAT PUMP.
Owner
Applicant
Contractor
DANEIL LONG
KAREN MATHENEYWASHINGTON
WASHINGTON ENERGY SERVICES CO
1595 SW 301ST ST
ENERGY SERVICES CO
(GENERAL)
FEDERAL WAY WA
3909 196TH ST SW
WASHIES85INS (9/7/21)
98023-3457
LYNNWOOD WA 98036
3909 196TH ST SW
LYNNWOOD WA 98036
Compressors / Heat Pumps I rurnaces I
PERMIT EXPIRES Saturday, 18 September, 2021
Permit Issued on Monday, March 22, 2021
1 hereby certify that the above information is correct and that the construction' on the above described G
nnrl tha nnrn inanr.v and the lisp will he in accordance with the laws. rules and regulations of the Sta'l.
CITY or -
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 21 101103 00 Address: 1595 SW 301ST ST
Project: SAMAREH GIAHI-LONG FEDERAL WAY WA
Scheduled 'inspections may be failed if this card is not on -site. _DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
You are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
® Mechanical Rough. -in (4165)
El Gas Piping (4125)
Q Final - Mechanical (4065)
Approved
Approved to release test
Approved
By Date
By Date
By Date"'`'
El Rough Electrical Final Electrical � Right of Way
Approved Approved Approved
By Date By Date By Date