21-101193Mechanical
City of Federal Way Permit #:21-101193-00-ME
Community Development Dept.
33325 8th Ave S FILE
Inspection Request Line: (253) 835-3050
Federal Way, WA ',%��03
Ph: (253) 835-2607 Fax: ('1..`:3] 835-2609
Project Name: PAVES
Parcel Number: 515250 0080
Project Address: 731 S 294TH PL
Project Description: INSTALLING FURNACE, AC, AND WATER HEATER.
Owner
ALEJANDRO G PAVES
731 S 294TH PL
FEDERAL WAY WA 98003-3613
Applicant
KAREN MATHENEYWASHINGTON
ENERGY SERVICES CO
3909 196TH ST SW
LYNNWOOD WA 98036
Contractor
WASHINGTON ENERGY SERVICES CO
(GENERAL)
WASHIES85INS (9/7/21)
3909 196TH ST SW
LYNNWOOD WA 98036
Additional Permit Information
Mechanical Work Valuation? ................................. 18900 Is this an Online or O.T.C. application?.................. Yes
Mechanical Fixtures
Air Conditioners - Stand Alonl 1 Furnaces I Hot Water Tanks
PERMIT EXPIRES Saturday, 25 September, 2021
Permit Issued on Monday, March 29, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
\fvashington and the City of Federal Way.
Date
Owner or agent: _ �.
_ts.
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQU E5TS: (253) 835-3050
PERMIT #: 21 101193 00 Address: 731 S 294TH PL
Project: ANITA V PAVES FEDERAL WAY WA 98003-3613
CARD. Inspections are listed as close to sequential order as possible
Scheduled inspections may be failed if this card is not on -site. D() N()1 LOSETHIS t115 must
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ipi4125) ❑ Final - Mechanical (4065)
❑ Mechanical Rough -in (4165) ❑ Gas Png ( Approved
Approved Approved to release test L
By Date By
Date By Date g117
Final Electrical ❑ Right of Way
rBy
Rough Electrical rB
ApprovedApprnved
Approved
Date y
Date By Date