21-101369Mechanical
City or Federal Way Permit #:21-101369-00-ME
Community Development Dept.
Sal W 8tlt Ave S FILE
Inspection Request Line: (253) 835-3050
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: BALDWIN
Project Address: 31029 6TH PL SW Parcel Number: 072104 9238
Project Description: Generator Gas Piping
Owner Applicant Contractor
JODY BALDWIN ERIC JOHNSONWASHINGTON ELECTRIC WASHINGTON ELECTRIC LLC
31029 6TH PL SW LLC (GENERAL)
FEDERAL WAY WA 98023-4602 14404 SE 216TH ST WASHIEL879BW (1/16/23)
KENT WA 98042 14404 SE 216TH ST
KENT WA 98042
Additional Permit Information
Mechanical Work Valuation? .................... 650.00 Is this an Online or O.T.C. application?.................. Yes
Mechanical Fixtures
Gas Piping
CONDITIONS:
A permanently installed generator is not allowed to be placed within required yards (setbacks). See
Rnih-tin #150 for nlacenient details.
PERMIT EXPIRES Tuesday, 5 October, 2021
Permit Issued on Thursday, April 8, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date:
_N�
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 21 101369 00 Address: 31029 6TH PL SW
Project: BEVAN BALDWIN FEDERAL WAY WA 98023-4602
Scheduled inspections maybe failed if this card is not on -site, DO NOT LOSE T"IS CARD. Inspections are Iisted as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Q Mechanical Rough -in (4165) El Gas Piping (4125) ❑ Final - Mechanical (4065)
Approved Approved to release test Approved
By Date By Date By Date 2 3
Final Electrical
Right of Way
Approved
Rough Electrical
Approved
Approved
13y
Date
By
Date
By
Date