Loading...
21-101369Mechanical City or Federal Way Permit #:21-101369-00-ME Community Development Dept. Sal W 8tlt Ave S FILE Inspection Request Line: (253) 835-3050 Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: BALDWIN Project Address: 31029 6TH PL SW Parcel Number: 072104 9238 Project Description: Generator Gas Piping Owner Applicant Contractor JODY BALDWIN ERIC JOHNSONWASHINGTON ELECTRIC WASHINGTON ELECTRIC LLC 31029 6TH PL SW LLC (GENERAL) FEDERAL WAY WA 98023-4602 14404 SE 216TH ST WASHIEL879BW (1/16/23) KENT WA 98042 14404 SE 216TH ST KENT WA 98042 Additional Permit Information Mechanical Work Valuation? .................... 650.00 Is this an Online or O.T.C. application?.................. Yes Mechanical Fixtures Gas Piping CONDITIONS: A permanently installed generator is not allowed to be placed within required yards (setbacks). See Rnih-tin #150 for nlacenient details. PERMIT EXPIRES Tuesday, 5 October, 2021 Permit Issued on Thursday, April 8, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: _N� CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 101369 00 Address: 31029 6TH PL SW Project: BEVAN BALDWIN FEDERAL WAY WA 98023-4602 Scheduled inspections maybe failed if this card is not on -site, DO NOT LOSE T"IS CARD. Inspections are Iisted as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q Mechanical Rough -in (4165) El Gas Piping (4125) ❑ Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date 2 3 Final Electrical Right of Way Approved Rough Electrical Approved Approved 13y Date By Date By Date