21-101376Electrical
City of [;edernI way
Community Dept• a i
33325 8tSth Aveve S
FILFA
Federal WAv, WA t}Si10:
Ph:(253)835.2807 Fax:(253)835.2609
Project Name: ABAM OFFICE BUILDING
Project Address: 33301 9TH AVE S
Project Description: Installation of Tele Data cable on 3rd floor
Owner
SI-11:I,RY COMPANY CIO GVA KIDDER
MAI'1IEWS
CIO G13A KIDDER MATHEWS
1201 PACIFIC; AVE UNIT 1400
TACO MA WA98402
AARI scant
JODI C30WDEYDIAMOLD
COMMUNICATIONS, INC
2i2I5 SE 184T1-1 ST
MAPLE VALLEY WA 98038
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Low Voltage - Other (Commel 25
Permit #:21-101376-00-EL
Inspection Request Line: (263) 835-3050
Parcel Number: 926501 0130
Contractor
D]AMOND COMMUNICATIONS INC'
(EI.ECTRICAL06)
DIAMOC181 IMW (7/16/211
25215 $f-- 1 wri-i S'r
MAP1..E VALLEY WA 98038
PERMIT EXPIRES Friday, 8 April, 2022
Permit Issued on Thursday, April 8, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance With the laws. rules and regulations of the State of
Washington and the City of Federal Way.
Date:
Owner or agent:--0Nt*4&-
A��
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQU E STS: (253) 835-3050
PERMIT #: 21 101376 00 Address: 33301 9TH AVE S Unit 300
Project: SHELBY COMPANY c/o GVA KIDD] FEDERAL WAY WA 98003-2602
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
❑ UFER Ground (4295) 0 Ditch cover (4030) 0 Slab/Concrete Floor (4255)
Approved
By Date
Q Pool Bonding (4195)
Approved
By Date
0 Feeders/Sub-panels (4045)
Approved
By Date
0 Final - Electrical (4055)
Approved
By Date
By
Approved
Date
El
Temporary Power (4275)
Approved
By
Date
0
Rough Electrical (4225)
Approved
By
Date
By
Approved to place concrete
Date
0
Service (4235)
Approved
By
Date
®
Ceiling Cover (4020)
Approi ed
By
Date
LJ Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date