21-101933Electrical
City of Federal way Permit #:21-101933-00-EL
Community Development Dept .'
33325 8th Ave S
F
Inspection Request Line: (253) 835-3050
Federal Way, WA 98003 FILPh: (253) 835-2607 Fax: (253) 835-2609 --A
Project Name: COMBS
Project Address: 1922 SW 318TH PL Parcel Number: 856110 0490
Project Description: Replace 125Amp panel, install 20Amp microwave circuit
Owner
Applicant
Contractor
JAMES COMBS
WILL HANSENA C ELECTRIC SERVICE
A C ELECTRIC SERVICE
1922 SW 318TH PL #A-13
20012 35TH AVE S
CELECCE8730Z (9/9/21)
FEDERAL WAY WA
SEATAC WA 98198
20012 35TH AVE S
98023-5134
SEATAC WA 98198
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Alt. Serv./Feeder: 0 to 200 aml 1 Circuits - Multi -family i
PERMIT EXPIRES Tuesday, 17 May, 2022
Permit Issued on Monday, May 17, 2021
i hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
W in ❑n th City o F eral Way.
Owner or agent: Date:
I //�PL/ )
THIS CAD IS TO REMAIN
/SON -SITE
I/�
CITY OF Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 21 101933 00 Address: 1922 SW 318TH PL Unit 13A
Project: JAMES T COMBS FEDERAL WAY WA 98023
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
❑ UFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255)
Approved Approved Approved to place concrete
By Date By Date By Date
❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235)
Approved Approved Approved
By Date By Date By Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
El Final - Electrical (4055)
Approved
By Date
❑
Rough Electrical
❑
Final Electrical
❑
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date